Permit Details

Status:
Issued
Type:
Commercial Building
Address NEW:
181 W BROADWAY BL
Apply Date:
03/09/2026
Applicant:
Alexander Montanaro
Description:
This project will remove and replace the exterior glazing systems and roofing systems through the existing 14 story hotel building. Site work includes exterior steel stairs and pedestrian connection ramps. The development plan related to this project is: TD-DEV-0126-00003 (SHELL ONLY PERMIT)

Permit Reviews

Permit Number - TC-COM-0326-00338
Permit Status: Issued
Permit Description: This project will remove and replace the exterior glazing systems and roofing systems through the existing 14 story hotel building. Site work includes exterior steel stairs and pedestrian connection ramps. The development plan related to this project is: TD-DEV-0126-00003 (SHELL ONLY PERMIT)
Start Date Submittal Complete Date Status  
04/14/2026 COMMERCIAL REVIEW - FULL v.2 04/14/2026 REQUIRES RESUBMIT Review Details
04/16/2026 COMMERCIAL REVIEW - FULL v.3 04/27/2026 REQUIRES RESUBMIT Review Details
05/15/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/19/2026 APPROVED Review Details
03/09/2026 COMMERCIAL REVIEW - FULL v.1 04/07/2026 REQUIRES RESUBMIT Review Details
04/30/2026 COMMERCIAL REVIEW - FULL v.4 04/30/2026 APPROVED Review Details
05/06/2026 SPECIAL INSPECTION REVIEW v.1 05/08/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0326-00338
Permit Status: Issued
Permit Description: This project will remove and replace the exterior glazing systems and roofing systems through the existing 14 story hotel building. Site work includes exterior steel stairs and pedestrian connection ramps. The development plan related to this project is: TD-DEV-0126-00003 (SHELL ONLY PERMIT)
Total Outstanding Activity Conditions - 10
Date Name
03/26/2026 BRIDGE/RAMP GUARDRAILS Designs must be submitted and approved prior to installation
03/27/2026 Stair Designs must be submitted and approved prior to installation
04/16/2026 SPECIAL INSPECTION OF CONCRETE CONSTRUCTION IS REQUIRED.
04/16/2026 SPECIAL INSPECTION OF EPOXY REPAIR OF CONCRETE COLUMN IS REQUIRED
04/16/2026 SPECIAL INSPECTION OF EXTERIOR INSULATION AND FINISH SYSTEM IS REQUIRED.
04/16/2026 SPECIAL INSPECTION OF FIRE-RESISTANCE PENETRATION AND JOINTS IS REQUIRED.
04/16/2026 SPECIAL INSPECTION OF POST-INSTALLED ANCHORS IS REQUIRED.
04/16/2026 SPECIAL INSPECTION OF STRUCTURAL STEEL IS REQUIRED.
04/16/2026 SPECIAL INSPECTION OF WATER -RESISTIVE BARRIER COATING IS REQUIRED.
04/16/2026 SPECIAL INSPECTION OF WELDING IS REQUIRED AT COLUMN REPAIR

Conditions

Permit Number - TC-COM-0326-00338
Permit Status: Issued
Permit Description: This project will remove and replace the exterior glazing systems and roofing systems through the existing 14 story hotel building. Site work includes exterior steel stairs and pedestrian connection ramps. The development plan related to this project is: TD-DEV-0126-00003 (SHELL ONLY PERMIT)
Date Description Comments
05/05/2026 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
05/05/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
03/26/2026 ROOF ANCHOR SYSTEM Designs must be submitted and approved prior to installation
03/26/2026 ROOF DAVIT SYSTEM Designs must be submitted and approved prior to installation
03/09/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
04/16/2026 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0326-00338
Permite Description: This project will remove and replace the exterior glazing systems and roofing systems through the existing 14 story hotel building. Site work includes exterior steel stairs and pedestrian connection ramps. The development plan related to this project is: TD-DEV-0126-00003 (SHELL ONLY PERMIT)
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
06/09/2026 COT - HCBU - Exterior Clips/Sheathing N/A Partial Pass 6-9-26: 11th.floor framing/sheathing inspection on a total of 12 infill columns. Framing verified per A9.2/Detail 7-Pending infill tie-ins using nails/hilti screws.
07/01/2026 COT - LCPL - Plumbing Intermediate N/A Not Ready
07/02/2026 COT - HCPL - Plumbing Roof Drains N/A Partial Pass 7/2/26 partial approval for roof drains northside down to the 12th floor small weep on the roof drain flanges at the penthouse level needs to be reinspected at the penthouse level after weep is corrected
06/30/2026 COT - LCBU - Framing N/A Partial Pass Partial pass. Headers in place along with in fills at columns secured in place north and west elevation level 14. Detail 4. Per RFI 19.
Columns secured in place levels 14,12,11,&3. All sides in place. Okay to proceed with progress areas. 6/30/2026

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0326-00338
Permit Description: This project will remove and replace the exterior glazing systems and roofing systems through the existing 14 story hotel building. Site work includes exterior steel stairs and pedestrian connection ramps. The development plan related to this project is: TD-DEV-0126-00003 (SHELL ONLY PERMIT)
Total Completed Inspections - 2
Date Description Inspector Results Comments
05/12/2026 PDSD Building Division Pre-Construction Meeting Passed
06/03/2026 COT - LCBU - Roof Nailing Passed

Scheduled Inspections

Scheduled Inspections - TC-COM-0326-00338
Status: Issued
Description: This project will remove and replace the exterior glazing systems and roofing systems through the existing 14 story hotel building. Site work includes exterior steel stairs and pedestrian connection ramps. The development plan related to this project is: TD-DEV-0126-00003 (SHELL ONLY PERMIT)
Scheduled Date Description Entered By Entered Date
07/06/2026 COT - LCBU - Framing Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
DEFERRED SUBMITTAL - ROOF ANCHOR SYSTEM AND ROOF DAVIT SYSTEM_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
STAMPED CONS-HYATT REGENCY TCC_ENVELOPE AND SITE 4-29-26_V3.PDF DOCUMENTS VIEW
CONS-HYATT REGENCY TCC_ENVELOPE AND SITE 4-29-26_V3.PDF DOCUMENTS VIEW
TC-COM-0326-00338 COMMENT RESPONSES 4-29-26_V2.PDF DOCUMENTS VIEW