Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCPL - Plumbing Roof Drains
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/01/2026 | COT - HCPL - Plumbing Roof Drains | Partial Pass | ||
| 07/02/2026 | COT - HCPL - Plumbing Roof Drains | Partial Pass | 7/2/26 partial approval for roof drains northside down to the 12th floor small weep on the roof drain flanges at the penthouse level needs to be reinspected at the penthouse level after weep is corrected | |
| 07/10/2026 | COT - HCPL - Plumbing Roof Drains | Partial Pass | 7/10/2026 Partial pass. 1 set of roof drains on south end west end north end and east end tested from roof down to the 12th floor. | |
| 10/22/2026 | COT - HCPL - Plumbing Roof Drains | Partial Pass | 10/22/2026 Partial pass. Portecochere (main driveway awning) roof above total of 4 sets. Both overflows and primary roof drains on test and approved. East end lower roof over flow roof drains tested and approved. Pending all primaries. |
|
| 10/23/2026 | COT - HCPL - Plumbing Roof Drains | Partial Pass | 10/23/26: low East side 6 primary roof drains verified under test. | |
| 10/29/2026 | COT - HCPL - Plumbing Roof Drains | Partial Pass | 10/29/26: (6)Over flow roof drains approved at west lower roof area. | |
| 11/04/2026 | COT - HCPL - Plumbing Roof Drains | Partial Pass | ||
| 11/05/2026 | COT - HCPL - Plumbing Roof Drains | Partial Pass | 11/5/2026 Partial pass. East end 1 set of roof drains from 4th floor down to the lobby area. Basement west end primary main 6” drain under test with zero leaks okay to release pressure. |