Permit: TC-COM-0326-00338

Parcel: 11720019C


Addresses:

181 W BROADWAY BL

Inspection Status: Partial Pass

Inspection History: COT - HCBU - Exterior Clips/Sheathing 

Date Description Inspector Results Comments
05/29/2026 COT - HCBU - Exterior Clips/Sheathing  Partial Pass West elevation cripple stud walls. Sheathing in place. Approved.
Screw inspection at plywood lower roof Approved. Okay to proceed progress areas. 5/29/2026
06/05/2026 COT - HCBU - Exterior Clips/Sheathing  Partial Pass 6-5-26: 12th floor infill framing/sheathing inspection for a total of 12 infill columns. Framing verified per A9.2/Detail 7-Pending infill tie-ins using nails/hilti screws.
06/09/2026 COT - HCBU - Exterior Clips/Sheathing  Partial Pass 6-9-26: 11th.floor framing/sheathing inspection on a total of 12 infill columns. Framing verified per A9.2/Detail 7-Pending infill tie-ins using nails/hilti screws.
06/12/2026 COT - HCBU - Exterior Clips/Sheathing  Partial Pass 6/12/2026 Partial pass. Level 10 Exterior framed wall and sheathing total of 12 infill columns approved.
06/25/2026 COT - HCBU - Exterior Clips/Sheathing  Partial Pass
07/10/2026 COT - HCBU - Exterior Clips/Sheathing  Partial Pass 7/10/2026 Partial pass. Penthouse roof sheathing at parapet approved along with lower deck penthouse parapet walls.
07/22/2026 COT - HCBU - Exterior Clips/Sheathing  Partial Pass
08/07/2026 COT - HCBU - Exterior Clips/Sheathing  Partial Pass 8-7-26: drywall screw inspection Level 11 exterior columns. Add screws to 2- exterior columns located at south west side. Remaining 10 exterior. Columns are okay to tape/texture.