Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
2100 N ROSEMONT BL
Apply Date:
03/01/2024
Applicant:
Description:
Remodel some of the existing rooms as well as the entrance of the building.

Permit Reviews

Permit Number - TC-COM-0324-00396
Permit Status: Complete
Permit Description: Remodel some of the existing rooms as well as the entrance of the building.
Start Date Submittal Complete Date Status  
04/30/2024 COMMERCIAL REVIEW - FULL v.2 06/03/2024 REQUIRES RESUBMIT Review Details
06/06/2024 RESTAMP - COMMERCIAL v.1 06/10/2024 APPROVED Review Details
12/06/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/09/2024 REQUIRES RESUBMIT Review Details
06/05/2024 COMMERCIAL REVIEW - FULL v.3 06/06/2024 APPROVED Review Details
09/17/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/17/2025 APPROVED Review Details
12/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 12/20/2024 REQUIRES RESUBMIT Review Details
01/03/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.3 01/06/2025 APPROVED Review Details
03/06/2024 COMMERCIAL REVIEW - FULL v.1 04/08/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0324-00396
Permit Status: Complete
Permit Description: Remodel some of the existing rooms as well as the entrance of the building.
Date Description Comments
03/12/2024 AIR BALANCING REPORT IS REQUIRED.
03/06/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
03/12/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0324-00396
Permite Description: Remodel some of the existing rooms as well as the entrance of the building.
Total Outstanding Inspections - 18
Last Inspection Date Description Inspector Results Comments
09/12/2025 COT - HCEL - Grounding/Bonding N/A Not Applicable
09/12/2025 COT - HCPL - Backwater Valve N/A Not Applicable
09/12/2025 COT - HCPL - Plumbing Above Ceiling N/A Not Applicable
09/12/2025 COT - HCPL - Yard Water Line N/A Not Applicable
11/08/2024 COT - HCEL - Electrical Progress N/A Partial Pass Phase one.
11/22/2024 COT - HCME - Mechanical Above Ceiling N/A Partial Pass Partial pass. Phase 1 approved per Ralph Mellecker. 11/22/2024
10/16/2025 COT - HCPL - Rough Soil N/A Not Applicable
11/15/2024 COT - HCBU - Building Above Ceiling N/A Partial Pass Temporary light fixtures are installed and properly wired to roof trusses. All mechanical, electrical, and plumbing above ceiling is complete for phase 1 of project. Okay to proceed with ceiling tile installation on this phase of project.
11/27/2024 COT - HCEL - Electrical Final N/A Partial Pass Phase 1 approved. 11/27/2024
09/26/2024 COT - HCBU - Framing N/A Partial Pass Phase One.
11/12/2024 COT - HCEL - Electrical Above Ceiling N/A Canceled
10/01/2025 COT - HCME - Mechanical Final N/A Partial Pass
10/23/2024 COT - HCPL - Plumbing Progress N/A Partial Pass Shower in phase one.
08/19/2024 COT - HCBU - Building Progress N/A Partial Pass Rebar cages
12/17/2024 COT - HCBU - Building Final N/A Partial Pass Approve Level Three TCO for West side.
12/10/2024 ENGR Engineering Final N/A Partial Pass Good for TCO level four phase 1. Needs to move the Porta John.
11/27/2024 COT - FCON - Fire - Final N/A Partial Pass phase 1 level four tco ok per tucson fire./
11/03/2025 COT - HCPL - Plumbing Roof Drains N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0324-00396
Permit Description: Remodel some of the existing rooms as well as the entrance of the building.
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/16/2024 COT - HCBU - Roof Nailing Passed
11/25/2024 TRSP - ROW - Final/Close-Out Passed
11/27/2024 BULD - Electrical Clearance Passed
11/27/2024 COT - BULD - SWG Clearance Passed
09/15/2025 COT - HCEL - Electrical Progress Passed
10/01/2025 COT - HCME - Mechanical Above Ceiling Passed Phase II complete. Ok to set ceiling tiles.
10/01/2025 COT - HCME - Venting Passed
10/09/2025 COT - HCBU - Sustainability Passed
10/16/2025 COT - HCBU - Building Above Ceiling Passed
10/16/2025 COT - HCEL - Electrical Final Passed
10/16/2025 COT - HCBU - Framing Passed
10/16/2025 COT - HCEL - Electrical Above Ceiling Passed
10/16/2025 COT - HCME - Mechanical Final Passed
10/23/2025 COT - HCPL - Plumbing Progress Passed
10/23/2025 COT - HCBU - Building Progress Passed
10/23/2025 COT - HCBU - Building Final Passed
10/23/2025 ENGR Engineering Final Passed
10/24/2025 COT - FCON - Fire - Final Passed
11/03/2025 COT - HCBU - CofO Passed
11/03/2025 COT - HCME - Mechanical Progress Passed
11/03/2025 COT - HCPL - Plumbing Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
TMC SLEEP LAB INSPECTOR LETTER_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-2022-10 DELTA 1 FULL SET - R_V3.PDF DOCUMENTS VIEW