Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2025 | ENGR Engineering Final | Passed | ||
| 11/22/2024 | ENGR Engineering Final | Not Ready | ||
| 12/10/2024 | ENGR Engineering Final | Partial Pass | Good for TCO level four phase 1. Needs to move the Porta John. |