Permit Number: TC-COM-0324-00396
Parcel: 121136340

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0324-00396
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/02/2024 Site Engineering NOT REQUIRED
04/08/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
04/05/2024 Site Zoning REQUIRES RESUBMIT ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT:
TC-COM-0324-00396
2100 N ROSEMONT BL. – OCR-2
Remodel some of the existing rooms as well as the entrance of the building (1st Review)

TRANSMITTAL DATE: April 5, 2024

DUE DATE: April 6, 2024

Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This site is located in the OCR-2 zone (UDC 4.7.27). Medical Service – Outpatient is an allowed use in the zone (UDC Table 4.8-4).

1. Per UDC Article 3.3.3.G.2.c A site plan (Development Package) is required for the following types of development: Existing development undergoing a change of use, building structure additions, and/or a reconfiguration of an area outside a building. A development package (DP) meeting the requirements of Administrative Manual (AM) 2-06 must be submitted and approved prior to approval of this building plan. The Administrative Manual can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes-and-Plans/Zoning-Code#section-1. Provide a copy of the approved DP for this project with your next submittal.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
04/08/2024 Water - PDSD REQUIRES RESUBMIT Complete the water calculations, including the size of the water meter and the backflow preventer.
03/12/2024 External Reviewers - SAFEBuilt REVIEW COMPLETED Structural(S) Reviewer
Kimiyoshi Shimabukuro
kshimabukuro@safebuilt.com
Approved
Reason:
Date Completed : 3/10/2024 5:29:22 AM



Building(B) Reviewer
Kimiyoshi Shimabukuro
kshimabukuro@safebuilt.com
Approved with Comments
Reason:
Date Completed : 3/10/2024 5:29:04 AM

2018 IBC [P]1502.2Secondary (emergency overflow) drains or scuppers.

Where roof drains are required, secondary (emergency overflow) roof drains or scuppers shall be provided where the roof perimeter construction extends above the roof in such a manner that water will be entrapped if the primary drains allow
buildup for any reason. The installation and sizing of secondary emergency overflow drains, leaders and conductors shall comply with Sections 1106 and 1108, as applicable, of the International Plumbing Code.



Mechanical(M) Reviewer
Kimiyoshi Shimabukuro
kshimabukuro@safebuilt.com
Approved
Reason:
Date Completed : 3/10/2024 5:29:55 AM



Electrical(E) Reviewer
Kimiyoshi Shimabukuro
kshimabukuro@safebuilt.com
Approved
Reason:
Date Completed : 3/10/2024 5:30:05 AM



Plumbing(P) Reviewer
Kimiyoshi Shimabukuro
kshimabukuro@safebuilt.com
Approved with Comments
Reason:
Date Completed : 3/10/2024 5:29:47 AM

2018 IBC [P]1502.2Secondary (emergency overflow) drains or scuppers.

Where roof drains are required, secondary (emergency overflow) roof drains or scuppers shall be provided where the roof perimeter construction extends above the roof in such a manner that water will be entrapped if the primary drains allow buildup for any reason. The installation and sizing of secondary emergency overflow drains, leaders and conductors shall comply with Sections 1106 and 1108, as applicable, of the International Plumbing Code.
04/01/2024 Fire New Construction REVIEW COMPLETED
03/06/2024 PDSD Application Completeness Express REVIEW COMPLETED