Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0324-00396
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/02/2024 | Site Engineering | NOT REQUIRED | |||
| 04/08/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 04/05/2024 | Site Zoning | REQUIRES RESUBMIT | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TC-COM-0324-00396 2100 N ROSEMONT BL. – OCR-2 Remodel some of the existing rooms as well as the entrance of the building (1st Review) TRANSMITTAL DATE: April 5, 2024 DUE DATE: April 6, 2024 Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in the OCR-2 zone (UDC 4.7.27). Medical Service – Outpatient is an allowed use in the zone (UDC Table 4.8-4). 1. Per UDC Article 3.3.3.G.2.c A site plan (Development Package) is required for the following types of development: Existing development undergoing a change of use, building structure additions, and/or a reconfiguration of an area outside a building. A development package (DP) meeting the requirements of Administrative Manual (AM) 2-06 must be submitted and approved prior to approval of this building plan. The Administrative Manual can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes-and-Plans/Zoning-Code#section-1. Provide a copy of the approved DP for this project with your next submittal. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 04/08/2024 | Water - PDSD | REQUIRES RESUBMIT | Complete the water calculations, including the size of the water meter and the backflow preventer. | ||
| 03/12/2024 | External Reviewers - SAFEBuilt | REVIEW COMPLETED | Structural(S) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Approved Reason: Date Completed : 3/10/2024 5:29:22 AM Building(B) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Approved with Comments Reason: Date Completed : 3/10/2024 5:29:04 AM 2018 IBC [P]1502.2Secondary (emergency overflow) drains or scuppers. Where roof drains are required, secondary (emergency overflow) roof drains or scuppers shall be provided where the roof perimeter construction extends above the roof in such a manner that water will be entrapped if the primary drains allow buildup for any reason. The installation and sizing of secondary emergency overflow drains, leaders and conductors shall comply with Sections 1106 and 1108, as applicable, of the International Plumbing Code. Mechanical(M) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Approved Reason: Date Completed : 3/10/2024 5:29:55 AM Electrical(E) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Approved Reason: Date Completed : 3/10/2024 5:30:05 AM Plumbing(P) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Approved with Comments Reason: Date Completed : 3/10/2024 5:29:47 AM 2018 IBC [P]1502.2Secondary (emergency overflow) drains or scuppers. Where roof drains are required, secondary (emergency overflow) roof drains or scuppers shall be provided where the roof perimeter construction extends above the roof in such a manner that water will be entrapped if the primary drains allow buildup for any reason. The installation and sizing of secondary emergency overflow drains, leaders and conductors shall comply with Sections 1106 and 1108, as applicable, of the International Plumbing Code. |
||
| 04/01/2024 | Fire New Construction | REVIEW COMPLETED | |||
| 03/06/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |