Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
02/16/2024
Applicant:
Architecture & Engineering City of Tucson
Description:
City of Tucson Water Department The new City of Tucson Hayden Udall Warehouse will provide: • New organized and convenient storage spaces. • New offices, workspaces, and support spaces for Tucson Water staff. Note: All Landscape and Native Plant Preservation Plan by COT

Permit Reviews

Permit Number - TC-COM-0224-00311
Permit Status: Complete
Permit Description: City of Tucson Water Department The new City of Tucson Hayden Udall Warehouse will provide: • New organized and convenient storage spaces. • New offices, workspaces, and support spaces for Tucson Water staff. Note: All Landscape and Native Plant Preservation Plan by COT
Start Date Submittal Complete Date Status  
07/17/2024 RESTAMP - COMMERCIAL v.1 07/22/2024 APPROVED Review Details
01/29/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/30/2026 REQUIRES RESUBMIT Review Details
05/21/2024 COMMERCIAL REVIEW - FULL v.2 06/04/2024 REQUIRES RESUBMIT Review Details
02/04/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.2 02/05/2026 APPROVED Review Details
12/23/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/23/2025 REQUIRES RESUBMIT Review Details
07/12/2024 RESTAMP - COMMERCIAL v.1 07/16/2024 REQUIRES RESUBMIT Review Details
07/16/2024 RESTAMP - COMMERCIAL v.2 07/16/2024 APPROVED Review Details
05/13/2025 COMMERCIAL REVIEW - FULL v.1 06/09/2025 APPROVED Review Details
02/20/2024 COMMERCIAL REVIEW - FULL v.1 03/19/2024 REQUIRES RESUBMIT Review Details
08/13/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/14/2025 APPROVED Review Details
12/31/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 01/07/2026 APPROVED Review Details
07/03/2024 COMMERCIAL REVIEW - FULL v.3 07/12/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0224-00311
Permit Status: Complete
Permit Description: City of Tucson Water Department The new City of Tucson Hayden Udall Warehouse will provide: • New organized and convenient storage spaces. • New offices, workspaces, and support spaces for Tucson Water staff. Note: All Landscape and Native Plant Preservation Plan by COT
Date Description Comments
02/16/2024 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
03/07/2024 AIR BALANCING REPORT IS REQUIRED.
07/22/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
07/22/2024 SPECIAL INSPECTION FOR. FOUNDATION EXCAVATIONS PRIOR TO CONCRETE PLACEMENT IS REQUIRED
07/22/2024 REINFORCING STEEL (INCLUDING FLOOR TOPPING REINFORCING)
07/22/2024 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. (SNUG TIGHT)
03/07/2024 WINDOW SYSTEMS AND CALCULATIONS Designs must be submitted and approved prior to installation
03/05/2024 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.
07/22/2024 SPECIAL INSPECTION FOR POST INSTALLED BOLTS (EXPANSION OR EPOXY TYPE) ANCHORS IS REQUIRED.
03/07/2024 Please submit a separate sign permit for an signs associated with this projet.
02/16/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/12/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
03/07/2024 SPECIAL INSPECTION FOR REINFORCING SECURED WITH EPOXY. IS REQUIRED
07/22/2024 SPECIAL INSPECTION FOR Structural CONCRETE IS REQUIRED.
03/07/2024 SPECIAL INSPECTION FOR ALL MASONRY IS REQUIRED.
07/22/2024 SPECIAL INSPECTION FOR STRUCTURAL WELDING (FIELD & SHOP) IS REQUIRED.
03/07/2024 PREFABRICATED WOOD I JOISTS AND CALCULATIONS & Design plans must be submitted and approved prior to finaling the permit if commercial building.
03/07/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0224-00311
Permite Description: City of Tucson Water Department The new City of Tucson Hayden Udall Warehouse will provide: • New organized and convenient storage spaces. • New offices, workspaces, and support spaces for Tucson Water staff. Note: All Landscape and Native Plant Preservation Plan by COT
Total Outstanding Inspections - 11
Last Inspection Date Description Inspector Results Comments
06/24/2025 COT - LCBU - Framing N/A Partial Pass 6-24-25: interior framing approved. Okay to continue with construction at progress areas.
09/15/2025 COT - LCBU - Preslab N/A Partial Pass 9-15-25: reinforcement for light pole cage verified per plans-okay to pour concrete.
06/24/2025 COT - LCEL - Electrical Progress N/A Partial Pass 6-24-25: in wall rough electrical along interior side of cmu walls verified per plans. Okay to continue with construction at progress areas.
08/14/2025 COT - LCEL - Electrical Underground N/A Partial Pass 8-14-25: verified 6 electrical conduit stub outs on southwest side of Building 11. Okay to backfill progress area.
11/12/2025 COT - BULD - SWG Clearance N/A Not Applicable 11-12-25: not applicable
12/09/2025 COT - LCEL - Grounding/Bonding N/A Not Ready 12/09/25
Not Ready
10/31/2025 COT - LCPL - Plumbing Intermediate N/A Partial Pass 10-31-25: partial pass for above ceiling grid framing.
12/03/2025 BULD - Electrical Clearance N/A Not Ready 12.03.2025
Verify panels per 11.12.2025 inspection.
01/09/2026 COT - LCPL - Plumbing Final N/A Partial Pass 1-9-26: cap condensation line at A/C1, caulk/seal penetration at HB1.
01/09/2026 COT - LCME - Mechanical Final N/A Partial Pass 1-9-26: label disconnects at rooftop, cap condensation line for A/C1.
NOTE: if larger disconnects for the swamp coolers are installed then have architect/engineer of record submit a letter to the city for review/approval.
12/23/2025 COT - LCEL - Outdoor Lighting N/A Partial Pass 12-23-25: pending 3rd party inspection & report.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0224-00311
Permit Description: City of Tucson Water Department The new City of Tucson Hayden Udall Warehouse will provide: • New organized and convenient storage spaces. • New offices, workspaces, and support spaces for Tucson Water staff. Note: All Landscape and Native Plant Preservation Plan by COT
Total Completed Inspections - 21
Date Description Inspector Results Comments
01/27/2025 COT - LCBU - Excavation/Rebar/Zoning Passed Approved foundations and foundation pads for the Warehouse and Storage yard, okay for concrete placement of progress areas.
03/06/2025 COT - LCBU - Stem Wall/Retaining Wall Passed 3-6-25, reinforcement for stem wall verified as per approved plans. Okay to grout.
03/11/2025 COT - LCPL - Rough Soil Passed 3-11-25, underground plumbing verified as per approved plans-okay to backfill with shading materials.
08/28/2025 COT - LCBU - Framing Passed 8-28-25: framing approved.
08/28/2025 COT - LCBU - Masonry Pregrout Passed 8-28-25: approved
09/30/2025 COT - LCBU - Preslab Passed 9-30-25: all preslab on project approved.
09/30/2025 COT - LCBU - Roof Nailing Passed 9-30-25: roof nailing approved.
11/12/2025 COT - LCEL - Electrical Progress Passed 11-12-25: approved.
11/12/2025 COT - LCEL - Electrical Underground Passed 11-12-15: approved.
11/12/2025 COT - LCEL - Electrical Above Ceiling Passed 11-12-25: approved.
11/12/2025 COT - LCEL - Electrical Intermediate Passed 11-12-15: approved.
12/10/2025 COT - LCEL - Grounding/Bonding Passed 12/10/2025
Verified grounding and bonding tie-in to EV transformer and HW/LW transformers. Verified panels were opened up and made up at EV transformer and HW/LW panels.
12/23/2025 ENGR Engineering Final Passed DP inspected and closed.
12/23/2025 COT - LCPL - Plumbing Intermediate Passed 12-23-25: plumbing intermediate approved.
01/09/2026 BULD - Electrical Clearance Passed 1-9-26: approved.
01/21/2026 COT - LCEL - Electrical Final Passed 1-21-26: electrical final approved.
01/21/2026 COT - LCPL - Plumbing Final Passed 1-21-26: plumbing final approved.
01/21/2026 COT - LCME - Mechanical Final Passed 1-21-26: mechanical final approved.
01/21/2026 COT - LCEL - Outdoor Lighting Passed 1-21-26: outdoor lighting approved.
01/21/2026 COT - LCBU - Building Final Passed 1-21-26: building final approved.
Note: See conditions and submit all pending documents to the city for review.
01/27/2026 COT - FCON - Fire - Final Passed