Inspection Status: Partial Pass
Inspection History: COT - LCPL - Plumbing Intermediate
| Date |
Description |
Inspector |
Results |
Comments |
| 03/18/2025 |
COT - LCPL - Plumbing Intermediate |
|
Partial Pass |
3-18-25, underground plumbing, Schedule 40 as per plans. Okay to backfill. |
| 03/21/2025 |
COT - LCPL - Plumbing Intermediate |
|
Partial Pass |
3-21-25, charlotte piping installed for underground plumbing-verified under test and per plans. Okay to backfill and continue with construction. |
| 05/23/2025 |
COT - LCPL - Plumbing Intermediate |
|
Partial Pass |
5-23-25: verified approximately 200' of 4" SDR35 sewer pipe under test & per plan. Okay to backfill with shading materials. |
| 07/10/2025 |
COT - LCPL - Plumbing Intermediate |
|
Partial Pass |
7-10-25: verified utility crossing/tapping from 6" fire service line. A 2"domestic line will be installed 5' from fire service line leading to new warehouse from Building 8. A pressure test will be performed at later date-okay to backfill progress areas. |
| 07/16/2025 |
COT - LCPL - Plumbing Intermediate |
|
Partial Pass |
7-16-25: 2" copper line stemming from building 8 to new construction verified per plans. Okay to backfill approximately 40' of open trench. |
| 07/18/2025 |
COT - LCPL - Plumbing Intermediate |
|
Partial Pass |
7-18-25: verified depth on 2" water line from shutoff valve to building under construction. Okay to backfill approximately 300' of open trench-shading required. |
| 07/30/2025 |
COT - LCPL - Plumbing Intermediate |
|
Partial Pass |
7-30-25: verified backflow preventer located between Building 8 and Building 11. Testing will conducted when meter is installed. |
| 08/21/2025 |
COT - LCPL - Plumbing Intermediate |
|
Partial Pass |
8-21-25: in wall domestic and DWV verified under test. Okay to continue with construction at progress areas. |
| 10/31/2025 |
COT - LCPL - Plumbing Intermediate |
|
Partial Pass |
10-31-25: partial pass for above ceiling grid framing. |
| 11/12/2025 |
COT - LCPL - Plumbing Intermediate |
|
Partial Pass |
11-12-25: partial pass pending meter installation & pressure test. |
| 12/16/2025 |
COT - LCPL - Plumbing Intermediate |
|
Canceled |
12-16-25: canceled by contractor. |
| 12/23/2025 |
COT - LCPL - Plumbing Intermediate |
|
Passed |
12-23-25: plumbing intermediate approved. |