Permit Details

Status:
Complete
Type:
Commercial Building
Address:
3381 E WESTCO PL
Address NEW:
3381 E WESTCO PL
Apply Date:
02/14/2023
Applicant:
Brett Daugherty
Description:
New Office building with attached shade canopy

Permit Reviews

Permit Number - TC-COM-0223-00641
Permit Status: Complete
Permit Description: New Office building with attached shade canopy
Start Date Submittal Complete Date Status  
07/02/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 07/02/2024 REQUIRES RESUBMIT Review Details
07/08/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.3 07/10/2024 APPROVED Review Details
06/07/2023 COMMERCIAL REVIEW - FULL v.4 06/22/2023 REQUIRES RESUBMIT Review Details
07/26/2023 COMMERCIAL REVIEW - FULL v.6 07/27/2023 APPROVED Review Details
03/01/2023 COMMERCIAL REVIEW - FULL v.1 03/17/2023 REQUIRES RESUBMIT Review Details
04/20/2023 COMMERCIAL REVIEW - FULL v.3 05/23/2023 REQUIRES RESUBMIT Review Details
05/15/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/17/2024 REQUIRES RESUBMIT Review Details
05/22/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 05/23/2024 REQUIRES RESUBMIT Review Details
07/12/2023 COMMERCIAL REVIEW - FULL v.5 07/20/2023 REQUIRES RESUBMIT Review Details
07/27/2023 RESTAMP - COMMERCIAL v.1 07/31/2023 APPROVED Review Details
07/01/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/01/2024 REQUIRES RESUBMIT Review Details
05/24/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/28/2024 APPROVED Review Details
05/28/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.3 05/28/2024 APPROVED Review Details
04/13/2023 COMMERCIAL REVIEW - FULL v.2 04/13/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0223-00641
Permit Status: Complete
Permit Description: New Office building with attached shade canopy
Date Description Comments
05/28/2024 AIR BALANCING REPORT IS REQUIRED.
04/10/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/10/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/10/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
04/10/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
04/10/2024 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
04/10/2024 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
04/10/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/10/2024 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
04/10/2024 SPECIAL INSPECTION FOR WELDING IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0223-00641
Permite Description: New Office building with attached shade canopy
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
12/12/2023 COT - HCBU - Framing N/A Not Ready 12/12/23: not ready
12/12/2023 COT - HCEL - Electrical Intermediate N/A Partial Pass 12/12/23: 30' of 4" PVC underground conduit per plan form building to property fence pending 15' run to transformer. Ok to backfill progress area. 120' of 4" PVC underground conduit from property fence on southwest end to proposed new building on neighboring lot (pending revised plans to add new structure) ok to back fill progress area.
12/27/2023 COT - HCPL - Plumbing Progress N/A Re-inspection required This is an underground plumbing inspection: Main building underground sewer is complete and under water test. Repair garage underground sewer for restroom and vehicle wash drain is completed and under water test. Both underground's are holding water with no leaks. Okay to shade pipes and backfill trenches.
12/12/23: yard water line per plan ok to back fill, sewer connection under test ok to back fill.
12/27/23: tracer wire for oil separator missing, sample box missing per plan at oil separator.
08/30/2023 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass 8/30/23: all footers are to schedule ok to be poured
12/12/2023 COT - HCEL - Electrical Underground N/A Partial Pass 12/12/23: 30' of 4" PVC underground conduit per plan form building to property fence pending 15' run to transformer. Ok to backfill progress area. 120' of 4" PVC underground conduit from property fence on southwest end to proposed new building on neighboring lot (pending revised plans to add new structure) ok to back fill progress area.
05/10/2024 COT - BULD - SWG Clearance N/A Not Applicable
04/09/2024 COT - HCBU - Building Progress N/A Partial Pass 2/7/24 Partial for drywall nailing, ok for tape & texture
4/9/24:framing passed in tire/parts storage ok to drywall and texture,
05/13/2024 COT - FCON - Fire - Final N/A Partial Pass Ok for Level 4 TCO. Will need to add Knox Box near entrance gate.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0223-00641
Permit Description: New Office building with attached shade canopy
Total Completed Inspections - 29
Date Description Inspector Results Comments
10/04/2023 COT - HCEL - Electrical Progress Passed ufer
10/04/2023 COT - HCBU - Preslab Passed
12/12/2023 COT - HCPL - Sewer Passed 12/12/23: sewer connection per plan ok to backfill.
12/12/2023 COT - HCPL - Yard Water Line Passed 12/12/23: water line per plan and under pressure ok to backfill.
01/22/2024 COT - HCBU - Framing Passed
01/22/2024 COT - HCEL - Electrical Intermediate Passed
01/22/2024 COT - HCPL - Plumbing Progress Passed
04/01/2024 COT - HCBU - Building Above Ceiling Passed
04/09/2024 COT - HCBU - Excavation/Rebar/Zoning Passed 8/30/23: all footers are to schedule ok to be poured
9/5/23: all AB1-AB2 have anchor bolts embedded per Schedule. Ok to proceed
4/9/24: trash enclosure reinforcement per plan ok to grout.
04/18/2024 COT - HCEL - Electrical Underground Passed
04/25/2024 BULD - Electrical Clearance Passed Please supply letter of torque for cables in CT and disconnect
4/25/24: ECO TEP CLEARANCE for 3381 E WESTCO PL
05/10/2024 COT - HCBU - Building Progress Passed
05/10/2024 COT - HCBU - Exterior Clips/Sheathing Passed
05/10/2024 COT - HCBU - Roof Nailing Passed
05/10/2024 COT - HCEL - Electrical Above Ceiling Passed
05/10/2024 COT - HCPL - Plumbing Above Ceiling Passed
05/10/2024 COT - HCME - Mechanical Progress Passed
05/10/2024 COT - LCBU - Building Progress Passed
05/10/2024 COT - HCPL - Plumbing Intermediate Passed
05/10/2024 COT - HCME - Mechanical Intermediate Passed
05/10/2024 COT - HCME - Mechanical Above Ceiling Passed
05/16/2024 COT - HCEL - Electrical Final Passed
05/16/2024 TRSP - ROW - Final/Close-Out Passed
05/16/2024 COT - HCPL - Plumbing Final Passed
05/16/2024 COT - HCME - Mechanical Final Passed
05/16/2024 COT - HCBU - CofO Passed
05/16/2024 COT - HCBU - Building Final Passed 5/10/24: ADA requirements not met at restrooms, Insulation required on exterior hose bib, copper piping in contact with dissimilar material must be protected. conditions must be satisfied prior to building final, (Engineering final, Fire final, ROW final) all must be passed prior to building final.
5/15/24: per -previous notes
5/16/24: Ok for CofO
05/16/2024 ENGR Engineering Final Passed
05/21/2024 COT - FCON - Fire - Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
EL DORADO SPECIAL INSPECTION FORM -2024-07-05_V3.PDF DOCUMENTS VIEW
SPECIAL INSPECTION WELDS DUMPSTER 5 7 24-2024-05-15_V1-2024-05-21_V2.PDF DOCUMENTS VIEW
EL DORADO TRANSPORTATION CONCRETE FINAL_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-5_PLAN SET_V6.PDF DOCUMENTS VIEW