Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-COM-0223-00641
Parcel: 140418630

Address:
3381 E WESTCO PL

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.4

Permit Number - TC-COM-0223-00641
Review Name: COMMERCIAL REVIEW - FULL v.4
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
06/21/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
06/20/2023 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Activity Number: TC-COM-0223-00641

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.

Structural(S) Reviewer
Daljit Benipal
dbenipal@safebuilt.com
Conditionally Approved
Reason:
Date Completed : 6/19/2023 6:49:32 PM
NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances.

Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 6/15/2023 10:52:00 AM

Mechanical(M) Reviewer
Neil Samaan
nsamaan@safebuilt.com
Conditionally Approved
Reason:
Date Completed : 4/30/2023 10:51:25 PM
Approved/subject to field approval

Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Conditionally Approved
Reason:
Date Completed : 3/16/2023 9:34:05 AM
Electrical Review
By: Ron Ross PE
E2.0 First Floor Lighting Plan: Could not locate Keynote 4.

Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 6/18/2023 8:39:26 PM
Third Plumbing Review:
1). OK
2). SAME-what is preventing AD1 on plan page P2.0 from receiving storm water from exterior grade? -IPC 1101.3 ( Plan Page A5.0 shows open exterior grade at same level as covered slab & plan page S2.0 shows slab pitching to drain.)
3).OK
4). OK.
5). Added vent for AD1 on plan page P2.0 must rise 6" above the drain being served before offsetting horizontally. -IPC 905.4, 905.5
06/21/2023 Site Engineering REQUIRES RESUBMIT See Zoning Comment
06/12/2023 Site Zoning REQUIRES RESUBMIT FROM: Paul Camarena
PDSD Zoning Review Section

PROJECT: TC-COM-0223-00641
3381 E WESTCO PL Zoning I-1

TRANSMITTAL DATE:‎ June 12, 2023


COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This comment is still applicable.
1.COMMENT: Zoning has reviewed the building plan for compliance with TD-DEV-0223-00138 and although it appears that the building plans match the DP Zoning cannot approve the building plans until the DP is approved.



If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov
06/07/2023 PDSD Application Completeness Express REVIEW COMPLETED