Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - HCBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/10/2024 | COT - HCBU - Building Final | Re-inspection required | 5/10/24: ADA requirements not met at restrooms, Insulation required on exterior hose bib, copper piping in contact with dissimilar material must be protected. conditions must be satisfied prior to building final, (Engineering final, Fire final, ROW final) all must be passed prior to building final. | |
| 05/15/2024 | COT - HCBU - Building Final | Re-inspection required | 5/10/24: ADA requirements not met at restrooms, Insulation required on exterior hose bib, copper piping in contact with dissimilar material must be protected. conditions must be satisfied prior to building final, (Engineering final, Fire final, ROW final) all must be passed prior to building final. 5/15/24: per -previous notes |
|
| 05/16/2024 | COT - HCBU - Building Final | Passed | 5/10/24: ADA requirements not met at restrooms, Insulation required on exterior hose bib, copper piping in contact with dissimilar material must be protected. conditions must be satisfied prior to building final, (Engineering final, Fire final, ROW final) all must be passed prior to building final. 5/15/24: per -previous notes 5/16/24: Ok for CofO |