Permit Details

Status:
Complete
Type:
Commercial Building
Address:
1001 N PARK AV
Address NEW:
1001 N PARK AV
Apply Date:
07/30/2022
Applicant:
Description:
Foundation Only for Future Apartment building

Permit Reviews

Permit Number - T22CM05823
Permit Status: Complete
Permit Description: Foundation Only for Future Apartment building
Start Date Submittal Complete Date Status  
07/30/2022 3RD PARTY REVIEW - COMMERCIAL 09/29/2022 ACTIVE Review Details
06/02/2023 COMMERCIAL REVIEW - FULL v.1 06/02/2023 APPROVED Review Details
10/27/2022 COMMERCIAL REVIEW - FULL v.1 02/01/2023 REQUIRES RESUBMIT Review Details
06/02/2023 COMMERCIAL REVIEW - FULL v.1 07/28/2023 APPROVED Review Details
02/02/2023 COMMERCIAL REVIEW - FULL v.2 03/03/2023 APPROVED Review Details

Conditions

Permit Number - T22CM05823
Permit Status: Complete
Permit Description: Foundation Only for Future Apartment building
Date Description Comments
03/03/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
02/01/2023 Fabric Foundation Drain Designs must be submitted and approved prior to final inspection
02/01/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
02/01/2023 SPECIAL INSPECTION FOR CAST IN PLACE FOUNDATIONS IS REQUIRED

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM05823
Permite Description: Foundation Only for Future Apartment building
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
10/02/2023 BULD - Electrical Clearance N/A Partial Pass Ok to set power for Temporary construction power.
02/28/2024 COT - BULD - SWG Clearance N/A Not Applicable
08/31/2023 COT - HCPL - Rough Soil N/A Partial Pass Waste lines at 2 1/2” - 4” from East side to West side of site; approximately 110 feet. Ok to cover progress areas.
10/02/2023 COT - HCEL - Electrical Underground N/A Partial Pass Lines from mobile generator to temporary power panel and disconnect.
09/21/2023 COT - HCBU - Stem Wall/Retaining Wall N/A Partial Pass Basement ramp wall detail 17 s5.10 rebar per plan. Two west walls and south wall okay for concrete placement. 9/21/2023
09/29/2023 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass Columns at GL: D/6, B.6/6, G/5, G.3/6, D.3/7, H/7, L/5.3, J/5. Exterior South wall at GL: N/5.2 - 7.1. OK to set forms and place concrete.
12/08/2023 COT - HCBU - Framing N/A Partial Pass Level #1 Columns at GL: G.3/6, G.3/7, H/7, H/6, H/5, I/1.4, L/2.8. OK to set forms and place concrete in progress areas.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM05823
Permit Description: Foundation Only for Future Apartment building
Total Completed Inspections - 15
Date Description Inspector Results Comments
10/05/2023 BULD - Electrical Clearance Passed OK to set meter for temporary construction power
02/28/2024 COT - HCBU - Building Final Passed
02/28/2024 COT - HCME - Mechanical Final Passed
02/28/2024 COT - HCPL - Plumbing Intermediate Passed
02/28/2024 COT - HCEL - Electrical Intermediate Passed
02/28/2024 COT - HCPL - Plumbing Final Passed
02/28/2024 COT - HCME - Mechanical Intermediate Passed
02/28/2024 COT - HCBU - Masonry Pregrout Passed
02/28/2024 COT - HCEL - Electrical Final Passed
02/28/2024 COT - HCME - Mechanical Underground Passed
02/28/2024 COT - HCPL - Rough Soil Passed
02/28/2024 COT - HCEL - Electrical Underground Passed
02/28/2024 COT - HCBU - Stem Wall/Retaining Wall Passed
02/28/2024 COT - HCBU - Excavation/Rebar/Zoning Passed
02/28/2024 COT - HCBU - Framing Passed