Inspection Status: Passed
Inspection History: COT - HCPL - Rough Soil
| Date |
Description |
Inspector |
Results |
Comments |
| 02/28/2024 |
COT - HCPL - Rough Soil |
|
Passed |
|
| 08/11/2023 |
COT - HCPL - Rough Soil |
|
Not Ready |
Contractor cancelled. |
| 08/31/2023 |
COT - HCPL - Rough Soil |
|
Partial Pass |
Waste lines at 2 1/2” - 4” from East side to West side of site; approximately 110 feet. Ok to cover progress areas. |
| 09/12/2023 |
COT - HCPL - Rough Soil |
|
Partial Pass |
Main waste lines at 4” - 6” on GL: C/1.2 - 2.8. OK to cover progress areas. |
| 09/15/2023 |
COT - HCPL - Rough Soil |
|
Partial Pass |
West section South of ejector pits (2” - 6”) Ok to cover progress areas. |
| 09/19/2023 |
COT - HCPL - Rough Soil |
|
Partial Pass |
Phase IV, waste lines at Southwest area (2” - 6”). Ok to cover progress areas. |
| 09/22/2023 |
COT - HCPL - Rough Soil |
|
Partial Pass |
Partial pass, underground plumbing west side- gridline H-N, and South side 2.8 - 4. Okay to backfill. Shading required. 9/22/2023 |
| 10/05/2023 |
COT - HCPL - Rough Soil |
|
Partial Pass |
Waste lines (4” - 6”) at Southeast portion of site. Ok to cover progress areas. |