Permit Details

Status:
Needs Resubmittal
Type:
Commercial Building
Apply Date:
05/24/2022
Applicant:
Adam Jones
Description:
NEW INDUSTRIAL WAREHOUSE BUILDING

Permit Reviews

Permit Number - T22CM03954
Permit Status: Needs resubmittal
Permit Description: NEW INDUSTRIAL WAREHOUSE BUILDING
Start Date Submittal Complete Date Status  
05/24/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 10/14/2022 COMPLETED Review Details
10/18/2022 RESUBMITTAL 10/18/2022 ACTIVE Review Details
10/28/2022 COMMERCIAL REVIEW - FULL v.1 12/07/2022 REQUIRES RESUBMIT Review Details
01/16/2025 COMMERCIAL REVIEW - FULL v.2 N/A IN REVIEW Review Details
07/20/2023 COMMERCIAL REVIEW - FULL v.3 07/24/2023 APPROVED Review Details
11/20/2024 COMMERCIAL REVIEW - FULL v.1 12/23/2024 REQUIRES RESUBMIT Review Details
06/07/2023 COMMERCIAL REVIEW - FULL v.2 06/22/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - T22CM03954
Permit Status: Needs resubmittal
Permit Description: NEW INDUSTRIAL WAREHOUSE BUILDING
Total Outstanding Activity Conditions - 20
Date Name
08/21/2024 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
08/21/2024 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
08/21/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
08/21/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/21/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/21/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
08/21/2024 Exterior Building Signage Designs must be submitted and approved prior to final
08/21/2024 High Pile Storage Designs must be submitted and approved prior to final
08/21/2024 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
08/21/2024 Ladder Safety System Design and Support Designs must be submitted and approved prior to final
08/21/2024 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.
08/21/2024 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
08/21/2024 Roof Access Ladder/Platform Design and Support Deferred Submittal Designs must be submitted and approved prior to final
08/21/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
08/21/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
08/21/2024 SPECIAL INSPECTION FOR Plywood Roof Diaphragm IS REQUIRED
08/21/2024 Stair Designs must be submitted and approved prior to intermediate inspections if residential building or finalizing the permit if commercial building
08/21/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
08/21/2024 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
08/21/2024 SPECIAL INSPECTION FOR WELDING IS REQUIRED.

Conditions

Permit Number - T22CM03954
Permit Status: Needs resubmittal
Permit Description: NEW INDUSTRIAL WAREHOUSE BUILDING
Date Description Comments
06/07/2023 Please contact Pima County Addressing to resolve your addressing issue related to FILL IN THIS SPACE. Addressing@pima.gov or 520-724-9512
05/24/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
06/07/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
07/24/2023 Prior to Issuance: This project requires issuance of a Development Package (DP22-0122) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Needs Resubmittal
Permit Number: T22CM03954
Permite Description: NEW INDUSTRIAL WAREHOUSE BUILDING
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
11/07/2024 COT - HCPL - Rough Soil N/A Partial Pass 11/7/24: 312' run of 8" Schedule 40pvc south half of building 2. Ok to backfill progress area. Shading required
12/18/2024 COT - HCBU - Building Progress N/A Partial Pass 11/15/24: reinforcement per plan at second pour ok to proceed.
12/12/24:Tilt Panel Rebar and embed for Panel Pour #2 passed (panels 6,7,8,9,10,16,17,18,11,15,13,19,28,20,21,22,23,24,25,26,27,29,30,31,32)
Grid line B, C, and D. From 2-13. Total of 36 spread footers 6’x6’x16”. Rebar per plan okay for concrete placement. 10/17/2024
10/22/24: reinforcement per plan at footing 1 GL E 2.5/12
10/25/24: reinforcement per plan at footing 1 GL A 2.5/12
10/25/24: partial for UFER encased in concrete ok to proceed.
10/30/24: reinforcement per plan at GL E.5-D/1, B-D/2, D/7,
11/15/24: reinforcement per plan at second pour at slab ok to proceed.
12/10/24:Tilt Panel Rebar Pour #1 SE corner of Building passed. Ok to proceed
12/18/24: tilt panel rebar pour #2,3,4 reinforced per plans ok to proceed.
12/31/2024 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass Grid line B, C, and D. From 2-13. Total of 36 spread footers 6’x6’x16”. Rebar per plan okay for concrete placement. 10/17/2024
10/22/24: reinforcement per plan at footing 1 GL E 2.5/12
10/25/24: reinforcement per plan at footing 1 GL A 2.5/12
10/25/24: partial for UFER encased in concrete ok to proceed.
10/30/24: reinforcement per plan at GL E.5-D/1, B-D/2, D/7,
11/15/24: reinforcement per plan at second pour at slab ok to proceed.
12/10/24:Tilt Panel Rebar Pour #1 SE corner of Building passed. Ok to proceed
12/18/24: tilt panel rebar pour #2,3,4 reinforced per plans ok to proceed.
12/23/24: called Don no answer. Footings not ready
12/31/24: Rebar inspection of footing connections Panel 66-77A per detail 103/ S5.1. And Detail 108/ S5.1 for ramp walls prior to concrete placement.
10/30/2024 COT - HCEL - Electrical Underground N/A Partial Pass 10/25/24: partial for UFER encased in concrete ok to proceed.
10/30/24: reinforcement per plan at GL E.5-D/1, B-D/2, D/7, electrical underground for (3) 1" schedule 40 pvc at Gridline A-E/ 5.5 for gates.
01/23/2025 COT - HCBU - Framing N/A Partial Pass 1/23/25: Pre-Inspection purlin hardware

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PLAN SET_V1.PDF DOCUMENTS VIEW
I-10 INTERNATIONAL RESPONSE TO COM-B_V3_V1.PDF DOCUMENTS VIEW
CONS-1_PLAN SET (BUILDING B)_V3_V1.PDF DOCUMENTS VIEW
CONS-2_CIVIL-LANDSCAPE DEVELOPMENT PACKAGE_V3_V1.PDF DOCUMENTS VIEW