Permit: T22CM03954
Permit Details
Apply Date:
05/24/2022
Applicant:
Adam Jones
Description:
NEW INDUSTRIAL WAREHOUSE BUILDING
Permit Reviews
Permit Number - T22CM03954
Permit Status: Needs resubmittal
Permit Description: NEW INDUSTRIAL WAREHOUSE BUILDING
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/24/2022 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 10/14/2022 | COMPLETED |
10/18/2022 | RESUBMITTAL | 10/18/2022 | ACTIVE |
10/28/2022 | COMMERCIAL REVIEW - FULL v.1 | 12/07/2022 | REQUIRES RESUBMIT |
01/16/2025 | COMMERCIAL REVIEW - FULL v.2 | N/A | IN REVIEW |
07/20/2023 | COMMERCIAL REVIEW - FULL v.3 | 07/24/2023 | APPROVED |
11/20/2024 | COMMERCIAL REVIEW - FULL v.1 | 12/23/2024 | REQUIRES RESUBMIT |
06/07/2023 | COMMERCIAL REVIEW - FULL v.2 | 06/22/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - T22CM03954
Permit Status: Needs resubmittal
Permit Description: NEW INDUSTRIAL WAREHOUSE BUILDING
Total Outstanding Activity Conditions - 20
Date | Name |
---|---|
08/21/2024 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. |
08/21/2024 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. |
08/21/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
08/21/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
08/21/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
08/21/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
08/21/2024 | Exterior Building Signage Designs must be submitted and approved prior to final |
08/21/2024 | High Pile Storage Designs must be submitted and approved prior to final |
08/21/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
08/21/2024 | Ladder Safety System Design and Support Designs must be submitted and approved prior to final |
08/21/2024 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. |
08/21/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. |
08/21/2024 | Roof Access Ladder/Platform Design and Support Deferred Submittal Designs must be submitted and approved prior to final |
08/21/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
08/21/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
08/21/2024 | SPECIAL INSPECTION FOR Plywood Roof Diaphragm IS REQUIRED |
08/21/2024 | Stair Designs must be submitted and approved prior to intermediate inspections if residential building or finalizing the permit if commercial building |
08/21/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
08/21/2024 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
08/21/2024 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Conditions
Permit Number - T22CM03954
Permit Status: Needs resubmittal
Permit Description: NEW INDUSTRIAL WAREHOUSE BUILDING
Date | Description | Comments |
---|---|---|
06/07/2023 | Please contact Pima County Addressing to resolve your addressing issue related to FILL IN THIS SPACE. Addressing@pima.gov or 520-724-9512 | |
05/24/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
06/07/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
07/24/2023 | Prior to Issuance: This project requires issuance of a Development Package (DP22-0122) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. | |
06/15/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Needs Resubmittal
Permit Number: T22CM03954
Permite Description: NEW INDUSTRIAL WAREHOUSE BUILDING
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/07/2024 | COT - HCPL - Rough Soil | N/A | Partial Pass | 11/7/24: 312' run of 8" Schedule 40pvc south half of building 2. Ok to backfill progress area. Shading required |
12/18/2024 | COT - HCBU - Building Progress | N/A | Partial Pass | 11/15/24: reinforcement per plan at second pour ok to proceed. 12/12/24:Tilt Panel Rebar and embed for Panel Pour #2 passed (panels 6,7,8,9,10,16,17,18,11,15,13,19,28,20,21,22,23,24,25,26,27,29,30,31,32) Grid line B, C, and D. From 2-13. Total of 36 spread footers 6’x6’x16”. Rebar per plan okay for concrete placement. 10/17/2024 10/22/24: reinforcement per plan at footing 1 GL E 2.5/12 10/25/24: reinforcement per plan at footing 1 GL A 2.5/12 10/25/24: partial for UFER encased in concrete ok to proceed. 10/30/24: reinforcement per plan at GL E.5-D/1, B-D/2, D/7, 11/15/24: reinforcement per plan at second pour at slab ok to proceed. 12/10/24:Tilt Panel Rebar Pour #1 SE corner of Building passed. Ok to proceed 12/18/24: tilt panel rebar pour #2,3,4 reinforced per plans ok to proceed. |
12/31/2024 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Grid line B, C, and D. From 2-13. Total of 36 spread footers 6’x6’x16”. Rebar per plan okay for concrete placement. 10/17/2024 10/22/24: reinforcement per plan at footing 1 GL E 2.5/12 10/25/24: reinforcement per plan at footing 1 GL A 2.5/12 10/25/24: partial for UFER encased in concrete ok to proceed. 10/30/24: reinforcement per plan at GL E.5-D/1, B-D/2, D/7, 11/15/24: reinforcement per plan at second pour at slab ok to proceed. 12/10/24:Tilt Panel Rebar Pour #1 SE corner of Building passed. Ok to proceed 12/18/24: tilt panel rebar pour #2,3,4 reinforced per plans ok to proceed. 12/23/24: called Don no answer. Footings not ready 12/31/24: Rebar inspection of footing connections Panel 66-77A per detail 103/ S5.1. And Detail 108/ S5.1 for ramp walls prior to concrete placement. |
10/30/2024 | COT - HCEL - Electrical Underground | N/A | Partial Pass | 10/25/24: partial for UFER encased in concrete ok to proceed. 10/30/24: reinforcement per plan at GL E.5-D/1, B-D/2, D/7, electrical underground for (3) 1" schedule 40 pvc at Gridline A-E/ 5.5 for gates. |
01/23/2025 | COT - HCBU - Framing | N/A | Partial Pass | 1/23/25: Pre-Inspection purlin hardware |