Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/15/2025 | ENGR Engineering Final | Partial Pass | A TCO4 can be allowed for this building. There are no issues with the following that would prevent it from being issued, Landscaping Site function Parking and striping Access to site and buildings Sidewalks and ramps Drainage ADA Compliance |
|
| 09/11/2025 | ENGR Engineering Final | Partial Pass | There are a few aesthetic final touch ups. Paint and awnings work, sidewalk panels with construction joints out of square on NW side. These are currently being finished, and fixed. Elevation Cert needs to be submitted accepted for Full Final, C of O. |
|
| 10/29/2025 | ENGR Engineering Final | Not Ready | Recall Inspection after permit revision is completed. | |
| 12/12/2025 | ENGR Engineering Final | Passed |