Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - HCBU - Excavation/Rebar/Zoning
Permit Number - T22CM03954
Inspection Description - COT - HCBU - Excavation/Rebar/Zoning
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/10/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Grid line B, C, and D. From 2-13. Total of 36 spread footers 6’x6’x16”. Rebar per plan okay for concrete placement. 10/17/2024 10/22/24: reinforcement per plan at footing 1 GL E 2.5/12 10/25/24: reinforcement per plan at footing 1 GL A 2.5/12 10/25/24: partial for UFER encased in concrete ok to proceed. 10/30/24: reinforcement per plan at GL E.5-D/1, B-D/2, D/7, 11/15/24: reinforcement per plan at second pour at slab ok to proceed. 12/10/24:Tilt Panel Rebar Pour #1 SE corner of Building passed. Ok to proceed 12/18/24: tilt panel rebar pour #2,3,4 reinforced per plans ok to proceed. 12/23/24: called Don no answer. Footings not ready 12/31/24: Rebar inspection of footing connections Panel 66-77A per detail 103/ S5.1. And Detail 108/ S5.1 for ramp walls prior to concrete placement. 1/8/24: reinforcement at Tilt up panels tie-in not per plan (details 103 B), reinforcement missing per plan at tie-ins, reinforcement not per plan, panel missing 3#6 dowels on both ends to tie in (RFI required) 1/10/25: corrections made at panel tie-ins. Ok to proceed with concrete placement, 3 ramp footings inspected and passed. |
|
01/08/2025 | COT - HCBU - Excavation/Rebar/Zoning | Re-inspection required | Grid line B, C, and D. From 2-13. Total of 36 spread footers 6’x6’x16”. Rebar per plan okay for concrete placement. 10/17/2024 10/22/24: reinforcement per plan at footing 1 GL E 2.5/12 10/25/24: reinforcement per plan at footing 1 GL A 2.5/12 10/25/24: partial for UFER encased in concrete ok to proceed. 10/30/24: reinforcement per plan at GL E.5-D/1, B-D/2, D/7, 11/15/24: reinforcement per plan at second pour at slab ok to proceed. 12/10/24:Tilt Panel Rebar Pour #1 SE corner of Building passed. Ok to proceed 12/18/24: tilt panel rebar pour #2,3,4 reinforced per plans ok to proceed. 12/23/24: called Don no answer. Footings not ready 12/31/24: Rebar inspection of footing connections Panel 66-77A per detail 103/ S5.1. And Detail 108/ S5.1 for ramp walls prior to concrete placement. 1/8/24: reinforcement at Tilt up panels tie-in not per plan (details 103 B), reinforcement missing per plan at tie-ins, reinforcement not per plan, panel missing 3#6 dowels on both ends to tie in (RFI required) |
|
12/31/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Grid line B, C, and D. From 2-13. Total of 36 spread footers 6’x6’x16”. Rebar per plan okay for concrete placement. 10/17/2024 10/22/24: reinforcement per plan at footing 1 GL E 2.5/12 10/25/24: reinforcement per plan at footing 1 GL A 2.5/12 10/25/24: partial for UFER encased in concrete ok to proceed. 10/30/24: reinforcement per plan at GL E.5-D/1, B-D/2, D/7, 11/15/24: reinforcement per plan at second pour at slab ok to proceed. 12/10/24:Tilt Panel Rebar Pour #1 SE corner of Building passed. Ok to proceed 12/18/24: tilt panel rebar pour #2,3,4 reinforced per plans ok to proceed. 12/23/24: called Don no answer. Footings not ready 12/31/24: Rebar inspection of footing connections Panel 66-77A per detail 103/ S5.1. And Detail 108/ S5.1 for ramp walls prior to concrete placement. |
|
12/23/2024 | COT - HCBU - Excavation/Rebar/Zoning | Not Ready | Grid line B, C, and D. From 2-13. Total of 36 spread footers 6’x6’x16”. Rebar per plan okay for concrete placement. 10/17/2024 10/22/24: reinforcement per plan at footing 1 GL E 2.5/12 10/25/24: reinforcement per plan at footing 1 GL A 2.5/12 10/25/24: partial for UFER encased in concrete ok to proceed. 10/30/24: reinforcement per plan at GL E.5-D/1, B-D/2, D/7, 11/15/24: reinforcement per plan at second pour at slab ok to proceed. 12/10/24:Tilt Panel Rebar Pour #1 SE corner of Building passed. Ok to proceed 12/18/24: tilt panel rebar pour #2,3,4 reinforced per plans ok to proceed. 12/23/24: called Don no answer. Footings not ready |
|
12/18/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Grid line B, C, and D. From 2-13. Total of 36 spread footers 6’x6’x16”. Rebar per plan okay for concrete placement. 10/17/2024 10/22/24: reinforcement per plan at footing 1 GL E 2.5/12 10/25/24: reinforcement per plan at footing 1 GL A 2.5/12 10/25/24: partial for UFER encased in concrete ok to proceed. 10/30/24: reinforcement per plan at GL E.5-D/1, B-D/2, D/7, 11/15/24: reinforcement per plan at second pour at slab ok to proceed. 12/10/24:Tilt Panel Rebar Pour #1 SE corner of Building passed. Ok to proceed 12/18/24: tilt panel rebar pour #2,3,4 reinforced per plans ok to proceed. |
|
12/10/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Grid line B, C, and D. From 2-13. Total of 36 spread footers 6’x6’x16”. Rebar per plan okay for concrete placement. 10/17/2024 10/22/24: reinforcement per plan at footing 1 GL E 2.5/12 10/25/24: reinforcement per plan at footing 1 GL A 2.5/12 10/25/24: partial for UFER encased in concrete ok to proceed. 10/30/24: reinforcement per plan at GL E.5-D/1, B-D/2, D/7, 11/15/24: reinforcement per plan at second pour at slab ok to proceed. 12/10/24:Tilt Panel Rebar Pour #1 SE corner of Building passed. Ok to proceed |
|
11/20/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Grid line B, C, and D. From 2-13. Total of 36 spread footers 6’x6’x16”. Rebar per plan okay for concrete placement. 10/17/2024 10/22/24: reinforcement per plan at footing 1 GL E 2.5/12 10/25/24: reinforcement per plan at footing 1 GL A 2.5/12 10/25/24: partial for UFER encased in concrete ok to proceed. 10/30/24: reinforcement per plan at GL E.5-D/1, B-D/2, D/7, 11/15/24: reinforcement per plan at second pour at slab ok to proceed. |
|
11/15/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Grid line B, C, and D. From 2-13. Total of 36 spread footers 6’x6’x16”. Rebar per plan okay for concrete placement. 10/17/2024 10/22/24: reinforcement per plan at footing 1 GL E 2.5/12 10/25/24: reinforcement per plan at footing 1 GL A 2.5/12 10/25/24: partial for UFER encased in concrete ok to proceed. 10/30/24: reinforcement per plan at GL E.5-D/1, B-D/2, D/7, 11/15/24: reinforcement per plan at second pour at slab ok to proceed. |
|
10/30/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Grid line B, C, and D. From 2-13. Total of 36 spread footers 6’x6’x16”. Rebar per plan okay for concrete placement. 10/17/2024 10/22/24: reinforcement per plan at footing 1 GL E 2.5/12 10/25/24: reinforcement per plan at footing 1 GL A 2.5/12 10/25/24: partial for UFER encased in concrete ok to proceed. 10/30/24: reinforcement per plan at GL E.5-D/1, B-D/2, D/7, |
|
10/25/2024 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Grid line B, C, and D. From 2-13. Total of 36 spread footers 6’x6’x16”. Rebar per plan okay for concrete placement. 10/17/2024 10/22/24: reinforcement per plan at footing 1 GL E 2.5/12 10/25/24: reinforcement per plan at footing 1 GL A 2.5/12 |
Showing 1 to 10 of 12 entries