Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T21CM09774
Permit Details
Apply Date:
12/21/2021
Applicant:
James Ericksen
Description:
Foundation Only for Future Hospital
Permit Reviews
Permit Number - T21CM09774
Permit Status: Complete
Permit Description: Foundation Only for Future Hospital
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/18/2022 | RESUBMITTAL | 03/16/2022 | COMPLETED |
03/24/2022 | RESUBMITTAL | 04/27/2022 | COMPLETED |
04/30/2022 | RESUBMITTAL | 05/11/2022 | COMPLETED |
05/11/2022 | RESUBMITTAL | 05/16/2022 | COMPLETED |
05/19/2022 | RESUBMITTAL | 05/23/2022 | COMPLETED |
09/20/2022 | REVISION - - 1ST | 10/04/2022 | COMPLETED |
12/21/2021 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 02/02/2022 | COMPLETED |
01/19/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/22/2024 | APPROVED |
Conditions
Permit Number - T21CM09774
Permit Status: Complete
Permit Description: Foundation Only for Future Hospital
Date | Description | Comments |
---|---|---|
05/20/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
05/20/2022 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. | |
05/20/2022 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
05/20/2022 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
05/20/2022 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
05/20/2022 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
01/22/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
10/04/2022 | Prior to permit issuance a General Contractor Letter (GCL) is required | |
01/22/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
01/22/2024 | Masonry Inspection Report submittal review is required. | |
01/22/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
01/22/2024 | SPECIAL INSPECTION FOR SPRAY-APPLIED FIRE PROOFING IS REQUIRED. | |
01/22/2024 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM09774
Permite Description: Foundation Only for Future Hospital
Total Outstanding Inspections - 11
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - LCBU - Building Final | N/A | Not Ready | approved 1/2/2024 by JBurge |
10/26/2022 | COT - LCPL - Plumbing Final | N/A | Not Ready | |
10/26/2022 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Not Ready | |
10/27/2022 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready | |
11/08/2022 | COT - LCEL - Electrical Underground | N/A | Partial Pass | Conduit (1”) for light poles #30 - 32. Ok to cover progress areas. |
10/26/2022 | COT - LCPL - Rough Soil | N/A | Not Ready | |
10/26/2022 | COT - LCBU - Building Progress | N/A | Not Ready | |
01/26/2023 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | In wall electric at Area A: 10204, 10144C,T, 10145CR, 10146RAD, 10100P. Area B rooms: 10409, 10511, 10400A, 10500H, 10408,10407, 10406,10419, 10420, 10510, 10511, 10512, 10513, 10508, 10507, 10506, 10400A, 10500H, 10500E. |
03/22/2023 | COT - HCEL - Electrical Underground | N/A | Partial Pass | One each 4” conduit and one each 1” conduit from North area to vault at West side of site; approximately 50’. Ok to cover progress areas. |
10/26/2022 | COT - LCBU - Preslab | N/A | Not Ready | |
10/26/2022 | COT - LCBU - Masonry Pregrout | N/A | Requested |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM09774
Permit Description: Foundation Only for Future Hospital
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/02/2024 | COT - LCEL - Electrical Final | Passed |