Inspection Status: Not Ready
Inspection History: COT - LCPL - Rough Soil
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
COT - LCPL - Rough Soil |
|
Not Ready |
|
| 08/25/2022 |
COT - LCPL - Rough Soil |
JBURGE |
Partial Approval |
Entered by NGARCIA3 - Partial. Central Utility Plant; Area E, 4 each 4” lateral waste lines. Ok to cover progress areas. |
| 07/14/2022 |
COT - LCPL - Rough Soil |
TLUNDBERG |
Partial Approval |
Entered by NGARCIA3 - PA.
All underground soil on page 1P201A ok to cover |
| 06/29/2022 |
COT - LCPL - Rough Soil |
WGALLAGHER |
Partial Approval |
Entered by VVERA1 - Partial approval phase one grid line 5 to 6.5 and H to point of connection 10’ out of slab.
|
| 11/08/2022 |
COT - LCPL - Rough Soil |
|
Partial Pass |
Partial kitchen area for waste and vent lines (2” - 6” lines). North and East portions of kitchen area. Ok to cover progress areas. |
| 11/15/2022 |
COT - LCPL - Rough Soil |
|
Partial Pass |
Underground conduits for communication and cameras: 4” line and 2 each 1 “ lines. |