Permit: T21CM09774

Parcel: 14101925B


Addresses:

5755 S HOUGHTON RD


Inspection Status: Partial Pass

Inspection History: COT - LCEL - Electrical Underground 

Permit Number - T21CM09774

Inspection Description - COT - LCEL - Electrical Underground 

Inspection Status - Partial Pass

Date Description Inspector Results Comments
10/26/2022 COT - LCEL - Electrical Underground  Partial Pass Conduit lines from solar bank to canopy at 2 each 2” lines and 4 each 1 “ lines. Ok to cover progress areas.
10/19/2022 COT - LCEL - Electrical Underground  JBURGE Partial Approval Entered by VVERA1 - Partial. Underground conduit (1”) for light poles #1, 8, 10, 11. Lightning protection grounding at G10, G33, G35, G40, G41. OK to cover progress areas.
10/13/2022 COT - LCEL - Electrical Underground  JBURGE Partial Approval Entered by NGARCIA3 - Partial. Conduit lines (1" - 4") for CATH Lab in Section B ; GL: 11 - 12/D - E. OK to cover progress areas. for cable and communications lines at road crossing off East side of site. Ok to cover progress areas.
10/04/2022 COT - LCEL - Electrical Underground  JBURGE Partial Approval Entered by NGARCIA3 - Partial. Lightning protection grounding system at GL: 12 - 14/B - K; 5- 14/J - K.
09/28/2022 COT - LCEL - Electrical Underground  JBURGE Partial Approval Entered by VVERA1 - Partial. 1” conduits (3) at GL:H/8 - 12; 1” conduit lines (4) at GL: J/9 - 12. Ok to cover progress areas.
09/26/2022 COT - LCEL - Electrical Underground  JBURGE Partial Approval Entered by VVERA1 - Partial. Grounding system in Area A: CAD Welded to interior steel columns.
09/14/2022 COT - LCEL - Electrical Underground  JBURGE Partial Approval Entered by VVERA1 - Partial. Area B to North equipment area, lightning bonding loop at area B. Ok to cover progress areas.
09/08/2022 COT - LCEL - Electrical Underground  JBURGE Partial Approval Entered by NGARCIA3 - Partial. Electrical conduits (3/4” - 3”) at CUP area GL: B-C/6 - 9. Ok to cover progress areas.
08/24/2022 COT - LCEL - Electrical Underground  JBURGE Partial Approval Entered by VVERA1 - . Partial. Room #10711 at GL: 8 - 9/I - K ; Radiology room #10305 at GL: 7-8/F.
08/18/2022 COT - LCEL - Electrical Underground  JBURGE Partial Approval Entered by NGARCIA3 - . Partial. Elevator area conduits at GL: 8 - 9/I - K; (9 @ 3 1/2"; 3 @ 3", 3 @ 1 1/4", 2 @ 2", 1 @ 1 1/2", 1 @ 1". Secondary lines at GL: 6.4; approximately 20’; 8 @ 4" conduits. Ok to cover with concrete.
08/16/2022 COT - LCEL - Electrical Underground  JBURGE Partial Approval Entered by NGARCIA3 - Partial. Lightening protection system; ufer CAD welded to 4 corner columns at GL: 1 -4/A - E. Ok to cover progress areas.
08/11/2022 COT - LCEL - Electrical Underground  WGALLAGHER Partial Approval Entered by NGARCIA3 - Partial. Nurse station (1" conduits) at GL: 4 - 5/B- C; Radiation room at GL: B - C/6 - 7 (conduits 3" - 1"); Trench at GL: A - B/6 - 9; Conduits at 4 at 3"; 11 at 1"; 4 at 1 1/4"; 14 at 3/4". Ok to cover progress areas.
08/10/2022 COT - LCEL - Electrical Underground  JBURGE Partial Approval Entered by VVERA1 - Partial. Underground conduits at transformer area to electric room (8 @ 4”; 3 @ 1 1/4”; 2 @ 3/4”; 4 @ 1”. Ok to cover progress areas.
08/03/2022 COT - LCEL - Electrical Underground  JBURGE Partial Approval Entered by VVERA1 - Partial. Conduit lines (1” - 3”) from electric room #10203 on GL: 6.5 - 8/D - D.5. Ok to cover progress areas.
08/03/2022 COT - LCEL - Electrical Underground  JBURGE Not ready for Inspection Entered by VVERA1 - Not ready. Contractor cancelled. Rained out.
07/28/2022 COT - LCEL - Electrical Underground  JBURGE Partial Approval Entered by NGARCIA3 - Partial. Conduits from generator yard (1” - 3”) at GL: H.5 - I/7.5 - 8.5. Ok to cover progress areas.
07/27/2022 COT - LCEL - Electrical Underground  JBURGE Partial Approval Entered by VVERA1 - Partial. Conduit lines for North generator yard on GL: E - C/5 - 6; 3”- 1” conduit lines. East electric room, conduits at 3/4” - 1” on GL: 10 - 12.5/E- C
07/21/2022 COT - LCEL - Electrical Underground  JBURGE Partial Approval Entered by NGARCIA3 - Partial. Electric room #10505 conduit lines (1" - 3") on GL: 10/D, E, F ; MDF on GL: J-K/9 - 10; Denmark on GL: J - K/9 -10. Ok to cover progress areas
07/14/2022 COT - LCEL - Electrical Underground  TLUNDBERG Partial Approval Entered by NGARCIA3 - PA Grid lines west to east 5 to 6, grid lines south to north H to B ug conduit Rooms 10901,10902,& 10903 branch conduit layer
07/12/2022 COT - LCEL - Electrical Underground  JBURGE Partial Approval Entered by NGARCIA3 - Partial. Electric conduits (2 1/2" - 1") to Electric room #10810 on GL: 3 - 5/A - B. Ok to cover progress areas.
07/07/2022 COT - LCEL - Electrical Underground  JBURGE Partial Approval Entered by NGARCIA3 - Partial. Electric rooms 10901, 10902, 10903: conduits (6” - 1”) at GL: AA-DD/6; CC-DD/5.5-5; DD-B/4 - 6.4. Ok to cover progress areas.
07/01/2022 COT - LCEL - Electrical Underground  WGALLAGHER Partial Approval Entered by NGARCIA3 - Partial approval Communication conduits from grid line j -k on 9 grid line Power line conduits 2nd level grid line E TO I, 6.4 TO 8 ok to cover
06/29/2022 COT - LCEL - Electrical Underground  WGALLAGHER Partial Approval Entered by VVERA1 - Partial approval for 4 comm conduits grid line E to l and 6 to staff elevator pit west side ok to cover
06/28/2022 COT - LCEL - Electrical Underground  WGALLAGHER Partial Approval Entered by NGARCIA3 - Partial approval from D LINE TO 8-10 GRID LINE
06/22/2022 COT - LCEL - Electrical Underground  ESTEVENS Partial Approval Entered by VVERA1 - Partial. Gridlines 5.5 B thru K. Gridlines 6 B thru E Gridlines 5.5 B thru D.
11/08/2022 COT - LCEL - Electrical Underground  Partial Pass Conduit (1”) for light poles #30 - 32. Ok to cover progress areas.