Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T21CM09774

Parcel: 14101925B


Addresses:

5755 S HOUGHTON RD


Inspection Status: Not Ready

Inspection History: COT - LCBU - Excavation/Rebar/Zoning 

Permit Number - T21CM09774

Inspection Description - COT - LCBU - Excavation/Rebar/Zoning 

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/26/2022 COT - LCBU - Excavation/Rebar/Zoning  Not Ready
10/20/2022 COT - LCBU - Excavation/Rebar/Zoning  JBURGE Partial Approval Entered by NGARCIA3 - Partial. Grade beams at GL: 13/I, J, K; K/10, 11, 10. OK to place concrete in progress areas.
10/19/2022 COT - LCBU - Excavation/Rebar/Zoning  IVR USER Cancelled Entered by IVR USER - IVRS - AP canceled
10/11/2022 COT - LCBU - Excavation/Rebar/Zoning  JBURGE Partial Approval Entered by NGARCIA3 - Partial. Area A slab at GL: CC - B/5 - 8.2. OK to place concrete in progress areas.
10/10/2022 COT - LCBU - Excavation/Rebar/Zoning  IVR USER Cancelled Entered by IVR USER - IVRS - AP canceled
09/29/2022 COT - LCBU - Excavation/Rebar/Zoning  JBURGE Partial Approval Entered by RSALDAT1 - Slab #3; Area B GL: 7 - 10/E - B. OK to place concrete in progress areas.
09/27/2022 COT - LCBU - Excavation/Rebar/Zoning  JBURGE Partial Approval Entered by NGARCIA3 - Partial. South and Southeast stem wall of Area A. Ok to place concrete in progress areas.
09/26/2022 COT - LCBU - Excavation/Rebar/Zoning  IVR USER Cancelled Entered by IVR USER - IVRS - AP canceled
09/26/2022 COT - LCBU - Excavation/Rebar/Zoning  JBURGE Partial Approval Entered by VVERA1 - Partial. Cooling tower columns (8) at GL: 6.8 - 7.75/FF; 6.8. 7.75/DD.2. Ok to place concrete in progress areas.
09/23/2022 COT - LCBU - Excavation/Rebar/Zoning  IVR USER Cancelled Entered by IVR USER - IVRS - AP canceled
09/22/2022 COT - LCBU - Excavation/Rebar/Zoning  JBURGE Partial Approval Entered by NGARCIA3 - Partial. Chiller pad at GL: A/6.5, detail #1SE301; Cooling towers detail #1SE304 (#1 & #2); Stem wall at GL: 5 - 8.2/CC ; 8.2 - 9/DD; 8.2 - 9/CC; Wall footings at GL: 9 - 14/K.6; F - H/12.4; K.6 - H.2/14; H.2 - H/12.4 - 14. Ok to place concrete in progress areas.
09/21/2022 COT - LCBU - Excavation/Rebar/Zoning  IVR USER Cancelled Entered by IVR USER - IVRS - AP canceled
09/20/2022 COT - LCBU - Excavation/Rebar/Zoning  JBURGE Partial Approval Entered by NGARCIA3 - Partial. Stem wall footing at GL: A.3-K; 8/A-K ; cooling tower footing at GL: 6.8-7.7/DD. Detail #1SE304. Ok to place concrete in progress areas.
09/19/2022 COT - LCBU - Excavation/Rebar/Zoning  IVR USER Cancelled Entered by IVR USER - IVRS - AP canceled
09/15/2022 COT - LCBU - Excavation/Rebar/Zoning  JBURGE Partial Approval Entered by NGARCIA3 - Partial. Stem wall footing at GL: K - K.6/4 - 9.5 as per detail 1S302.12 and .9. Column F3 at GL: K/5. OK to place concrete in progress areas.
09/14/2022 COT - LCBU - Excavation/Rebar/Zoning  IVR USER Cancelled Entered by IVR USER - IVRS - AP canceled
09/14/2022 COT - LCBU - Excavation/Rebar/Zoning  JBURGE Partial Approval Entered by VVERA1 - Partial. Column footings (9@ F6) at GL: 10/I, J, K; 11/I, J, K; 12/I, J, K: 9’ x 9’ x 24”. Ok to place concrete in progress areas
09/13/2022 COT - LCBU - Excavation/Rebar/Zoning  IVR USER Cancelled Entered by IVR USER - IVRS - AP canceled
09/13/2022 COT - LCBU - Excavation/Rebar/Zoning  JBURGE Partial Approval Entered by NGARCIA3 - Partial. Two grade beams at GL: 4/H.75 - K: K/10 - 12. Ok to place concrete in progress areas.
08/26/2022 COT - LCBU - Excavation/Rebar/Zoning  JBURGE Approved Entered by NGARCIA3 - Partial. Stem wall footing at GL: G/4 -5. Column footings at GL: H/11; H/10 (F6); H/12 (F6). Ok to place concrete in progress areas.
08/24/2022 COT - LCBU - Excavation/Rebar/Zoning  JBURGE Partial Approval Entered by VVERA1 - Partial. Column footings at H/6 (F5); 6.4/H.2 (F6); 6.4/H.2 (F3); 8/H (F6). Ok to place concrete in progress areas
08/19/2022 COT - LCBU - Excavation/Rebar/Zoning  JBURGE Partial Approval Entered by VVERA1 - Partial. Stem wall at GL: B/5 - 8 at 16” - 34”. Ok to place grout in progress areas. Note: Please add 01020 to this permit. Thank you.
08/10/2022 COT - LCBU - Excavation/Rebar/Zoning  JBURGE Partial Approval Entered by VVERA1 - Partial. Footings (F10) at GL: H.5/3.7 as per footing detail 9/SE302. Footings at GL: B/4.9 - 6.5; A/4.2 - 5; 5/A - CC; CC/7 - 8; 5/B.5 - CC; CC/5 - 8. Column footings: F1 at D6; F2 at B5; F1 at CC/5; F1 at CC/6; F1 at CC/7; F1 at CC/8; F1 at A/6. Ok to place concrete in progress areas.
08/08/2022 COT - LCBU - Excavation/Rebar/Zoning  JBURGE Partial Approval Entered by VVERA1 - Partial. Three each F-4 column footings at GL: I/4, J/4, K/4. Grade beam at GL :J - K/12; F-10 footings at GL: 3.7/J2; 3.7/H. Ok to place concrete in progress areas.
08/04/2022 COT - LCBU - Excavation/Rebar/Zoning  JBURGE Not ready for Inspection Entered by NGARCIA3 - Not ready. Contractor cancelled. Footings full of water
08/03/2022 COT - LCBU - Excavation/Rebar/Zoning  JBURGE Not ready for Inspection Entered by VVERA1 - Not ready. Contractor cancelled. Rained out.
08/03/2022 COT - LCBU - Excavation/Rebar/Zoning  JBURGE Not ready for Inspection Entered by VVERA1 - Not ready. Contractor cancelled. Rained out.
08/01/2022 COT - LCBU - Excavation/Rebar/Zoning  JBURGE Not ready for Inspection Entered by VVERA1 - Not ready. Contractor cancelled, rained out.
07/27/2022 COT - LCBU - Excavation/Rebar/Zoning  JBURGE Not ready for Inspection Entered by VVERA1 - Not ready. Contractor cancelled; rained out
07/20/2022 COT - LCBU - Excavation/Rebar/Zoning  JBURGE Partial Approval Entered by VVERA1 - Partial. F-1 footings at GL: E/4-5; 3.7/E - G ; G/4 - 5. Columns : F1 and F2 at GL: G4; G5; H5; H5.4; I5; J5; C5; C6; D5; D6; F6. Ok to place concrete in progress areas.
07/11/2022 COT - LCBU - Excavation/Rebar/Zoning  WGALLAGHER Partial Approval Entered by VVERA1 - Partial approval for F1&F2 COLUMNS AT GL; DD 8.2 & 9 CC 9 AA 7.2,8 & 9 B 7, 8, &9 C 8, 9 D 7, 8, 9, 10, &11 F 7, 8, 9, 10, &11 AND CONTINUOUS FOOTINGS; DD 8.2-9 B 6.7-9.5 DD9- B9 DD8.2 - CC 8.2 AND EAST ELEVATOR PIT WALL AT GL 9.1-9.7, I.3-I.8
06/30/2022 COT - LCBU - Excavation/Rebar/Zoning  WGALLAGHER Partial Approval Entered by NGARCIA3 - 1. Partial approval for B-10, B-11, B-12 COLUMN FOOTINGS 2. FROM GRID LINE 9.3 TO 12 ON 12 - 8 B CONTINUOUS FOOTING AT EXTERIOR AND 12.8B TO 12.8F CONTINUOUS FOOTING AND COLUMN FOOTINGS C9, C10, C11, C12, D12, F12 OK TO PLACE CONCRETE 3. K6 COLUMN BOLTS @ WEST ELEVATOR (RFI) ok to place concrete 4. K9, J9, I9 FOOTINGS & EAST ELEVATOR FIRST POUR OK TO PLACE CONCRETE
06/28/2022 COT - LCBU - Excavation/Rebar/Zoning  WGALLAGHER Partial Approval Entered by NGARCIA3 - Partial approval for for F7, F6, F5 footers in the grid line 6, I THROUGH K Including elevator pit ok for first lift
06/23/2022 COT - LCBU - Excavation/Rebar/Zoning  JBURGE Partial Approval Entered by NGARCIA3 - Partial. F-1 and F-2 footings at GL: A-E/1-4 with 15 interior column footings. Ok to place concrete in progress areas.
10/25/2022 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass