Parcel Attributes
Parcel14101925B
141019210
141019220
141019230
141019240
141019270
JurisdictionTucson
City of Tucson ZoningPAD-12
Tucson WardWard 4
Flood Related Information

FEMA Floodplain Area

Major Streets & Routes

Scenic Route

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Rezoning Cases

Date - 12/23/2024 7:11 a.m.
Total Number Of Rezone Cases - (2)
Case No. Description New Zone Status Status Date
C9-91-14 Civano - Houghton Road R-2 Effectuated 10/19/2009
C9-05-02 Civano Master PAD - Houghton PAD Effectuated 06/01/2006

Permits

Address: 5755 S HOUGHTON RD
Date - 12/23/2024 7:11 a.m.
Total Number Of Permits - (41)
Permit Status Apply Date Expired Date Unit Type Description
TF-FCP-1223-01453 Complete 12/27/2023 07/02/2024 Fire Construction Permit Installation of a Honeywell Hwf2v-com panel onto an existing fire alarm system.
T21CM09774 Complete 12/21/2021 06/30/2024 Commercial Building Foundation Only for Future Hospital
TF-FCP-1222-00197 Complete 12/08/2022 12/09/2023 Fire Construction Permit Clean agent suppression system for computer room
TR-ROW-1122-00072 Complete 11/17/2022 01/19/2023 Right-of-Way (ROW) Asphalt patching a trench running S across Drexel Rd. The trench was cut by a different contractor who crossed Drexel Rd with two 6" ducts for TEP under ROW permit T22RW03556. Traffic control will be the same as was used in T22RW03556. Trench has been backfilled to subgrade and is ready to be paved. Trench is currently plated.
DP21-0302 Inspections 11/08/2021 01/24/2027 Development Package Site/Grading/Swppp - TMC Rincon Hospital.
TR-ROW-1123-01325 Void 11/06/2023 N/A Right-of-Way (ROW) PHASE 1 -COX TO OVERLASH 15983' OF AERIAL TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE-
TR-UTL-1123-02868 Complete 11/06/2023 02/25/2024 Right-of-Way (ROW) - Utility COX PRJ258363-1B TO OVERLASH 4600' OF AERIAL TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE
TR-UTL-1123-02872 Complete 11/06/2023 03/06/2024 Right-of-Way (ROW) - Utility COX PRJ258363-1A TO OVERLASH 6,449' OF AERIAL TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE
TR-UTL-1023-02846 Complete 10/31/2023 03/06/2024 Right-of-Way (ROW) - Utility COX PRJ258363-1C TO OVERLASH 4600' OF AERIAL TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE (ALONG HARRISON RD)
TR-UTL-1023-02701 Canceled 10/13/2023 N/A Right-of-Way (ROW) - Utility COX TO OVERLASH 15983' OF AERIAL TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE
TS-PRM-1023-00545 Complete 10/05/2023 07/14/2024 Sign - Permanent Install one lighted Integrated Architectural Sign, 3 lighted wall signs and letters for the monument sign.
TR-ROW-0923-01194 Issued 09/27/2023 11/24/2023 Right-of-Way (ROW) Quality Issues with previous permit (TR-ROW-1122-00072) so work must be redone. Resubmitting for TR-ROW-1122-00072 with Traffic Control. Previous Description of Work: Asphalt patching a trench running S across Drexel Rd. The trench was cut by a different contractor who crossed Drexel Rd with two 6' ducts for TEP under ROW permit T22RW03556. Taffic control will be the same as was used in T22RW0556. Trench has been backfilled to subgrade and is ready to be paved. Trench is currently plated.
T22FC00669 Complete 09/27/2022 06/22/2024 Fire Construction Permit EXPEDITE-Automatic Fire Extingshing Sys - NEW FIRE SPRINKLER SYSTEM THROUGHOUT NEW 4 STORY HOSPITAL.
TR-ROW-0923-01191 Needs Resubmittal 09/26/2023 N/A Right-of-Way (ROW) **** Resubmittal Required - upload traffic control plan for work area. **** Quality Issues with previous permit (TR-TOW-112-00072) so work must be redone. Previous Description of Work: Asphalt patching a trench running S across Drexel Rd. The trench was cut by a different contractor who crossed Drexel Rd with two 6' ducts for TEP under ROW permit T22RW03556. Taffic control will be the same as was used in T22RW0556. Trench has been backfilled to subgrade and is ready to be paved. Trench is currently plated.
TF-FCP-0923-01129 Complete 09/22/2023 03/28/2024 Fire Construction Permit Above ground storage tank for generator fuel
TF-FOP-0923-01534 Complete 09/22/2023 09/27/2024 Fire Operational Permit Operational Permit for Above ground generator and storage tanks
TF-FOP-0924-01050 Void 09/13/2024 N/A Fire Operational Permit Operational Permit for Above ground generator and storage tanks will be applied for when the SLF permit is applied for.
T22RW03311 Complete 09/12/2022 01/15/2023 Right-of-Way (ROW) TEP to replace UG cable approx 200ft . TEP trucks may be parked in Street; Work Order: T39908 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
TF-FCP-0824-00709 Void 08/23/2024 N/A Fire Construction Permit VOID-Submit under Permit#TF-FCP-0824-00695 - THIS IS A MODIFICATION OF THE EXISTING FIRE ALARM SYSTEM, ADDING A NUMBER OF SMOKE DETECTORS ADJACENT TO A SELECT NUMBER OF DOORS WITH MAGNETIC HOLDERS TO INITIATE DOOR RELEASE CONTROL. PLUS, THE ADDITION OF SMOKE DETECTORS AND AUDIOVISUAL DEVICES IN THE NEW PHYSICIAN'S SLEEPING AREAS.
TC-REG-0824-00010 Needs Resubmittal 08/22/2024 02/18/2025 Registered Facility 60 Bed Acute Care Hospital
TF-FCP-0824-00695 Issued 08/20/2024 03/11/2025 Fire Construction Permit THIS IS A MODIFICATION OF THE EXISTING FIRE ALARM SYSTEM, ADDING A NUMBER OF SMOKE DETECTORS ADJACENT TO A SELECT NUMBER OF DOORS WITH MAGNETIC HOLDERS TO INITIATE DOOR RELEASE CONTROL. PLUS, THE ADDITION OF TWO SMOKE DETECTORS AND TWO AUDIOVISUAL DEVICES IN THE NEW PHYSICIAN'S SLEEPING AREA.
TS-PRM-0824-00342 Issued 08/02/2024 01/29/2025 Sign - Permanent Install one lighted wall sign
TF-FCP-0723-00911 Complete 07/31/2023 02/29/2024 Fire Construction Permit new ERRCS for TMC Rincon Hospital.
TR-UTL-0623-01849 Denied 06/22/2023 N/A Right-of-Way (ROW) - Utility (1) 3' x 6' bell hole in dirt to install new gas service.
T22TUP0010 Approved 05/31/2022 N/A Zoning Permit Annual 24' x 60' construction trailer for the construction of the TMC Rincon project.
T22CM02751 Issued 04/14/2022 01/12/2025 Commercial Building TI for Hospital
DP22-0082 Complete 04/06/2022 01/10/2027 Development Package Grading - TMC Rincon Hospital.
TF-FOP-0324-00333 Complete 03/26/2024 03/27/2025 Fire Operational Permit Fire State Licensed Facility Operational Permit
T22CM02072 Complete 03/21/2022 08/15/2023 Commercial Building 24 x 60 construction trailer w generator and temp water/sewer tanks for project 21016400
TF-FOP-0324-00301 Complete 03/15/2024 03/26/2025 Fire Operational Permit TMC Rincon Hospital Compressed Gas Permit
TF-FOP-0324-00302 Complete 03/15/2024 03/26/2025 Fire Operational Permit TMC Rincon
TF-FOP-0324-00303 Void 03/15/2024 N/A Fire Operational Permit VOID-SUBMIT A FIRE STATE LICENSED FACILITY PERMIT - TMC Rincon
T22OT00151 Complete 03/03/2022 09/10/2022 Floodplain Use Construction of multi-story hospital building with ancillary access, parking, utilities, landscape,
TF-FCP-0323-00433 Void 03/02/2023 N/A Fire Construction Permit VOID-Needs to be submitted under T22FC00669 per Trish-This permit consists of the upper floors of the Hospital that has already been submitted on Permit #T22FC00669 within this permit is the Two Standpipes that serve Levels 2-4, along with 618 SSP and 87 SSU sprinklers with 6 floor control assemblies within the 4 floors.
TF-FCP-0223-00352 Complete 02/01/2023 N/A Fire Construction Permit Install and flush new U.G Fire water line that will service the new remote FDC that will be installed no less than 100'-0" from the new Hydrant that is on site.
TC-COM-0124-00216 Issued 01/31/2024 10/06/2024 Commercial Building New permit to resolve outstanding exhaust fans testing under T22CM02751 per Juan Garcia
T22CM00621 Complete 01/26/2022 07/08/2024 Commercial Building Shell & superstructure package for hospital
TF-FCP-0123-00326 Complete 01/24/2023 04/26/2024 Fire Construction Permit New Fire Alarm system with Voice Evacuation and Partial Evacuation
TS-PRM-0123-00125 Expired 01/12/2023 07/11/2023 Sign - Permanent (MSP case TS-MSP0323-00005) Install 4 lighted wall signs and lighted faces for the monument sign
TC-CFO-0124-00020 Issued 01/11/2024 02/18/2024 Certificate of Occupancy TI for Hospital
TC-COM-0123-00455 In Review 01/11/2023 04/10/2024 Commercial Building TMC Rincon Campus PV is 101.05kW DC (145 Silfab 490W & 60 Silfab 500W modules). Grid-tied inverters will supply TEP service. 60 modules are roof-mounted with a ballasted system. 145 modules are mounted on a new custom steel canopy.

Plans

Address: 5755 S HOUGHTON RD
Date - 12/23/2024 7:11 a.m.
Total Number Of Plans - (3)
Plan Number Status Application Date Exp Date Unit Type Description
CWH-22-0082 Active 04/06/2022 12/12/2022 -- Commercial Water Harvesting Ordinance Grading - TMC Rincon Hospital.
TS-MSP0323-00005 Approved 03/01/2023 N/A -- Master Sign Program Increase allowable max square footage from 250sf in the scenic corridor to 452sf to install 4 lighted wall signs and the lighted faces of the monument sign.
TS-MSP0823-00011 Complete 08/24/2023 N/A -- Master Sign Program (Approved 09/19/23 - appeal ends 10/3/23) Increase allowable max square footage from 250sf in the scenic corridor to approx 650sf to install 4 lighted wall signs and the lighted faces of the monument sign. To also add an Integrated Architectural Feature as the main sign at this location.

Record Requests

Address: 5755 S HOUGHTON RD
Date - 12/23/2024 7:11 a.m.
Total Number Of Requests - (11)
Request Number Status Request Date Completed Date Type Description
REQ-0124-00783 Complete 01/26/2024 01/29/2024 Requests Shell & superstructure package for hospital
REQ-0124-00784 Complete 01/26/2024 01/29/2024 Requests Foundation Only for Future Hospital
REQ-0623-03535 Denied 06/27/2023 N/A Requests *** Work is not in City ROW *** BUILDING PERMIT REQUEST - Not needed, work area is within a parcel.
REQ-0724-04917 Approved 07/16/2024 07/16/2024 Requests TI for Hospital
REQ-0724-04920 Denied 07/16/2024 N/A Requests This Project is not complete, all related permits need to be in completed status (TF-FCP-0824-00695), and conditions need to be satisfied. Please re-request once all items are in completed/approved status. TI for Hospital
REQ-0724-04962 Void 07/17/2024 N/A Requests Duplicate request- TI for Hospital
REQ-1122-00055 Complete 11/08/2022 12/20/2022 Requests *(PLEASE RENEW FOR 30 DAYS)* TEP to replace UG cable approx 200ft . TEP trucks may be parked in Street ** PROOF OF NOTIFICAT; Work Order: T39908
REQ-1123-06259 Canceled 11/15/2023 N/A Requests ** Permit has been cancelled per applicant** THIS HAS BEEN BROKEN UP INTO 3 SEPERATE DRAWINGS AND THE AGENT SUBMITTED SEQUENCE 1A VIA TR-UTL-1123-02872 SO THIS ONE CAN BE CANCELLED.
REQ-1123-06260 Withdrawn 11/15/2023 N/A Requests WAS INCORRECTLY SUBMITTED VIA GENERAL INSTEAD OF UTILITY. WITHDRAWING AND HAVE ALREADY RESUBMITTED
REQ-1123-06428 Complete 11/27/2023 11/29/2023 Requests Quality Issues with previous permit (TR-ROW-1122-00072) so work must be redone. Resubmitting for TR-ROW-1122-00072 with Traffic Control. Previous Description of Work: Asphalt patching a trench running S across Drexel Rd. The trench was cut by a different contractor who crossed Drexel Rd with two 6' ducts for TEP under ROW permit T22RW03556. Taffic control will be the same as was used in T22RW0556. Trench has been backfilled to subgrade and is ready to be paved. Trench is currently plated.
REQ-1223-06706 Approved 12/08/2023 12/28/2023 Requests GC has extended Project beyond expiration date.