Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
1213 E WAREHOUSE AV
Apply Date:
11/22/2021
Applicant:
Description:
Ground Up Construction

Permit Reviews

Permit Number - T21CM09096
Permit Status: Complete
Permit Description: Ground Up Construction
Start Date Submittal Complete Date Status  
01/06/2022 RESUBMITTAL 01/21/2022 COMPLETED Review Details
02/03/2022 RESUBMITTAL 03/02/2022 COMPLETED Review Details
03/12/2022 RESUBMITTAL 03/23/2022 COMPLETED Review Details
06/01/2022 RESUBMITTAL 06/03/2022 COMPLETED Review Details
06/09/2022 RESUBMITTAL 06/16/2022 COMPLETED Review Details
11/22/2021 COMMERCIAL - BLDG/FIRE/ZONING/ENG 12/14/2021 COMPLETED Review Details
10/03/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/03/2023 REQUIRES RESUBMIT Review Details
10/04/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.2 10/09/2023 APPROVED Review Details

Conditions

Permit Number - T21CM09096
Permit Status: Complete
Permit Description: Ground Up Construction
Date Description Comments
03/18/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
03/18/2022 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
03/18/2022 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
03/18/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/18/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
06/15/2022 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
06/15/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM09096
Permite Description: Ground Up Construction
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCBU - Preslab N/A Not Ready
02/06/2023 COT - HCBU - Interior Shear Bracing N/A Canceled hold downs are not completely bolted to framing members.
10/26/2022 COT - FCON - Underground Pressure N/A Not Ready
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
08/29/2023 COT - LCPL - Plumbing Final N/A Re-inspection required 8/29/23: letter must be made and state that bathroom in office will be excluded from ADA Requirements and signed by both owner and contractor.
08/29/2023 COT - LCME - Mechanical Final N/A Partial Pass 8/29/23: mini split is being overcharged with 25amp fuses (max is 20amp), secure electrical whip,
08/29/2023 COT - LCBU - Building Final N/A Re-inspection required 8/29/23: actual address is 1213 E WAREHOUSE AV. mini split is being overcharged with 25amp fuses (max is 20amp), secure electrical whip, letter must be made and state that bathroom in office will be excluded from ADA Requirements and signed by both owner and contractor.
08/29/2023 COT - LCEL - Outdoor Lighting N/A Partial Pass 8/29/23: will be checked at final inspection
09/11/2023 COT - FCON - Fire - Final N/A Partial Pass everything has passed just need the entry to the building complete so we can get in

Completed Inspections

Permit Status: Complete
Permit Number: T21CM09096
Permit Description: Ground Up Construction
Total Completed Inspections - 34
Date Description Inspector Results Comments
09/22/2022 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 09/22/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
01/13/2023 COT - LCBU - Roof Nailing Passed roof sheeting is complete and properly nailed off.
02/22/2023 COT - LCEL - Electrical Intermediate Passed
02/22/2023 COT - LCBU - Framing Passed
02/22/2023 COT - LCME - Mechanical Above Ceiling Passed
02/22/2023 COT - LCPL - Plumbing Intermediate Passed
02/22/2023 COT - LCBU - Exterior Clips/Sheathing Passed
02/22/2023 COT - LCPL - Plumbing Above Ceiling Passed
02/22/2023 COT - LCEL - Electrical Above Ceiling Passed
02/22/2023 COT - LCME - Mechanical Intermediate Passed
03/08/2023 COT - HCBU - Interior Shear Bracing Passed All rooms are 100% complete
03/22/2023 COT - LCPL - Sewer Passed 4” sewer line tapped into main sewer line. Ok to cover progress areas.
05/12/2023 COT - LCBU - Building Above Ceiling Passed
05/12/2023 COT - LCPL - Plumbing Progress Passed
05/12/2023 COT - LCME - Mechanical Progress Passed
05/24/2023 BULD - Electrical Clearance Passed Approved, ECO Clearance to TEP is required for new service
07/03/2023 COT - LCBU - Masonry Pregrout Passed
08/24/2023 COT - LCEL - Electrical Progress Passed
08/29/2023 COT - LCPL - Rough Soil Passed
08/29/2023 COT - LCEL - Electrical Underground Passed 8/29/23: passed Actual address is 1213 E WAREHOUSE AV
08/29/2023 COT - LCEL - Electrical Final Passed
08/29/2023 COT - LCPL - Backwater Valve Passed 8/29/23: passed Actual address is 1213 E WAREHOUSE AV
08/29/2023 COT - LCBU - Building Progress Passed
08/30/2023 COT - FCON - Sprinkler - Final Passed
08/30/2023 COT - FCON - Alarm - Final Passed
08/31/2023 COT - LCBU - Sustainability Passed
08/31/2023 COT - HCBU - Excavation/Rebar/Zoning Passed
08/31/2023 COT - HCEL - Electrical Underground Passed Light poles.
08/31/2023 COT - LCEL - Grounding/Bonding Passed Light poles.
09/11/2023 COT - LCPL - Plumbing Final Passed
09/11/2023 COT - LCME - Mechanical Final Passed Air balance report has been forwarded.
09/27/2023 COT - LCBU - Building Final Passed Pending Fire Final.
09/27/2023 COT - LCEL - Outdoor Lighting Passed
10/03/2023 COT - FCON - Fire - Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
PERCEPTION COUNSELING FINAL-2023-10-04_V1.PDF DOCUMENTS VIEW
PERCEPTION SPEC INSP FINAL-2023-10-04_V1.PDF DOCUMENTS VIEW
GC LETTER BOND EXEMPT 2022-06-16 - UPLOADED FILE TYPE PLANS SUPPORTINGDOCUMENTS 1 1.PDF DOCUMENTS VIEW
PLAN C3.1.PDF DOCUMENTS VIEW
PLAN C3.0.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
GC LETTER & BOND EXEMPT.PDF DOCUMENTS VIEW
COMCHECK.PDF DOCUMENTS VIEW
LOAD CALC.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SOILS REPORT.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
PLAN C3.0.PDF CONSTRPLANS VIEW
PLAN SET.PDF CONSTRPLANS VIEW
PLAN C3.1.PDF CONSTRPLANS VIEW