Permit: T21CM09096
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
1213 E WAREHOUSE AV
Address NEW:
1213 E WAREHOUSE AV
Apply Date:
11/22/2021
Applicant:
Description:
Ground Up Construction
Permit Reviews
Permit Number - T21CM09096
Permit Status: Complete
Permit Description: Ground Up Construction
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/06/2022 | RESUBMITTAL | 01/21/2022 | COMPLETED |
| 02/03/2022 | RESUBMITTAL | 03/02/2022 | COMPLETED |
| 03/12/2022 | RESUBMITTAL | 03/23/2022 | COMPLETED |
| 06/01/2022 | RESUBMITTAL | 06/03/2022 | COMPLETED |
| 06/09/2022 | RESUBMITTAL | 06/16/2022 | COMPLETED |
| 11/22/2021 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 12/14/2021 | COMPLETED |
| 10/03/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/03/2023 | REQUIRES RESUBMIT |
| 10/04/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 10/09/2023 | APPROVED |
Conditions
Permit Number - T21CM09096
Permit Status: Complete
Permit Description: Ground Up Construction
| Date | Description | Comments |
|---|---|---|
| 03/18/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 03/18/2022 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. | |
| 03/18/2022 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 03/18/2022 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 03/18/2022 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 06/15/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm | |
| 06/15/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM09096
Permite Description: Ground Up Construction
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - LCBU - Preslab | N/A | Not Ready | |
| 02/06/2023 | COT - HCBU - Interior Shear Bracing | N/A | Canceled | hold downs are not completely bolted to framing members. |
| 10/26/2022 | COT - FCON - Underground Pressure | N/A | Not Ready | |
| 10/26/2022 | COT - FCON - Alarm - Final | N/A | Not Ready | |
| 08/29/2023 | COT - LCPL - Plumbing Final | N/A | Re-inspection required | 8/29/23: letter must be made and state that bathroom in office will be excluded from ADA Requirements and signed by both owner and contractor. |
| 08/29/2023 | COT - LCME - Mechanical Final | N/A | Partial Pass | 8/29/23: mini split is being overcharged with 25amp fuses (max is 20amp), secure electrical whip, |
| 08/29/2023 | COT - LCBU - Building Final | N/A | Re-inspection required | 8/29/23: actual address is 1213 E WAREHOUSE AV. mini split is being overcharged with 25amp fuses (max is 20amp), secure electrical whip, letter must be made and state that bathroom in office will be excluded from ADA Requirements and signed by both owner and contractor. |
| 08/29/2023 | COT - LCEL - Outdoor Lighting | N/A | Partial Pass | 8/29/23: will be checked at final inspection |
| 09/11/2023 | COT - FCON - Fire - Final | N/A | Partial Pass | everything has passed just need the entry to the building complete so we can get in |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM09096
Permit Description: Ground Up Construction
Total Completed Inspections - 34
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/2022 | COT - LCBU - Excavation/Rebar/Zoning | Passed | {Activity date: 09/22/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
| 01/13/2023 | COT - LCBU - Roof Nailing | Passed | roof sheeting is complete and properly nailed off. | |
| 02/22/2023 | COT - LCEL - Electrical Intermediate | Passed | ||
| 02/22/2023 | COT - LCBU - Framing | Passed | ||
| 02/22/2023 | COT - LCME - Mechanical Above Ceiling | Passed | ||
| 02/22/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 02/22/2023 | COT - LCBU - Exterior Clips/Sheathing | Passed | ||
| 02/22/2023 | COT - LCPL - Plumbing Above Ceiling | Passed | ||
| 02/22/2023 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 02/22/2023 | COT - LCME - Mechanical Intermediate | Passed | ||
| 03/08/2023 | COT - HCBU - Interior Shear Bracing | Passed | All rooms are 100% complete | |
| 03/22/2023 | COT - LCPL - Sewer | Passed | 4” sewer line tapped into main sewer line. Ok to cover progress areas. | |
| 05/12/2023 | COT - LCBU - Building Above Ceiling | Passed | ||
| 05/12/2023 | COT - LCPL - Plumbing Progress | Passed | ||
| 05/12/2023 | COT - LCME - Mechanical Progress | Passed | ||
| 05/24/2023 | BULD - Electrical Clearance | Passed | Approved, ECO Clearance to TEP is required for new service | |
| 07/03/2023 | COT - LCBU - Masonry Pregrout | Passed | ||
| 08/24/2023 | COT - LCEL - Electrical Progress | Passed | ||
| 08/29/2023 | COT - LCPL - Rough Soil | Passed | ||
| 08/29/2023 | COT - LCEL - Electrical Underground | Passed | 8/29/23: passed Actual address is 1213 E WAREHOUSE AV | |
| 08/29/2023 | COT - LCEL - Electrical Final | Passed | ||
| 08/29/2023 | COT - LCPL - Backwater Valve | Passed | 8/29/23: passed Actual address is 1213 E WAREHOUSE AV | |
| 08/29/2023 | COT - LCBU - Building Progress | Passed | ||
| 08/30/2023 | COT - FCON - Sprinkler - Final | Passed | ||
| 08/30/2023 | COT - FCON - Alarm - Final | Passed | ||
| 08/31/2023 | COT - LCBU - Sustainability | Passed | ||
| 08/31/2023 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
| 08/31/2023 | COT - HCEL - Electrical Underground | Passed | Light poles. | |
| 08/31/2023 | COT - LCEL - Grounding/Bonding | Passed | Light poles. | |
| 09/11/2023 | COT - LCPL - Plumbing Final | Passed | ||
| 09/11/2023 | COT - LCME - Mechanical Final | Passed | Air balance report has been forwarded. | |
| 09/27/2023 | COT - LCBU - Building Final | Passed | Pending Fire Final. | |
| 09/27/2023 | COT - LCEL - Outdoor Lighting | Passed | ||
| 10/03/2023 | COT - FCON - Fire - Final | Passed |