Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCBU - Masonry Pregrout
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - LCBU - Masonry Pregrout | Not Ready | ||
| 09/29/2022 | COT - LCBU - Masonry Pregrout | TGAUSP | Partial Approval | Entered by NGARCIA3 - Partial for perimeter stem walls, okay to grout progress areas |
| 01/04/2023 | COT - LCBU - Masonry Pregrout | Partial Pass | 4th lift of entry way okay to grout. | |
| 01/06/2023 | COT - LCBU - Masonry Pregrout | Partial Pass | 5th and final lift for entry way is okay to grout and cap off. | |
| COT - LCBU - Masonry Pregrout | Partial Pass | 6/29/23: ok to grout 1st lift on east side of building ok to grout and cap short wall on west side of parking lot |
||
| 07/03/2023 | COT - LCBU - Masonry Pregrout | Passed | ||
| 12/02/2022 | COT - LCBU - Masonry Pregrout | Partial Pass | PARTIAL- for 1st lift at Garage only, okay to grout progress areas | |
| 12/07/2022 | COT - LCBU - Masonry Pregrout | Partial Pass | partial approval for 2nd lift | |
| 12/09/2022 | COT - LCBU - Masonry Pregrout | Partial Pass | partial. 3rd lift okay to grout. garage only. | |
| 12/16/2022 | COT - LCBU - Masonry Pregrout | Partial Pass | veneer wall around building, 1st lift okay to grout. entry column 2nd lift okay to grout. |
|
| 12/20/2022 | COT - LCBU - Masonry Pregrout | Partial Pass | veneer wall okay to grout and cap off. structural wall south of entry rebar per plans, 2nd lift okay to grout. entry column, rebar per plans 3rd lift okay to grout. |
|
| 12/23/2022 | COT - LCBU - Masonry Pregrout | Canceled | canceled per contractor |