Address Search: 1213 E WAREHOUSE AV
Search
Parcel Attributes
| Parcel | 12418120C |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | I-1 |
| Tucson Ward | Ward 5 |
| Tucson Registered Neighborhood | Millville |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 1213 E WAREHOUSE AV
Date - 08/17/2026 8:31 a.m.
Total Number Of Annexations & Original City Zoning (1)
| Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
|---|---|---|---|---|
| 3/4 Mile East To Campbell Avenue | 486 |
Permits
Address: 1213 E WAREHOUSE AV
Date - 08/17/2026 8:31 a.m.
Total Number Of Permits - (12)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-UTL-1222-00364 | Withdrawn | 12/02/2022 | N/A | Right-of-Way (ROW) - Utility | CIR 1640246 PRJ218644- 17 1215 E Warehouse Ave 14 14 18 SW Trench / Bore 516ft Place 2-2" pipes & Pull Fiber | |
| T21CM09096 | Complete | 11/22/2021 | 04/07/2024 | Commercial Building | Ground Up Construction | |
| TD-DEV-1023-00425 | Issued | 10/16/2023 | 11/26/2026 | Development Package | Perception Counselling PV: Adding a new steel parking canopy structure in anexisting parking area to support a total of 69 modules in a grid-tied PV system. | |
| T22RW03540 | Complete | 09/29/2022 | 11/03/2022 | Right-of-Way (ROW) | Installing 4' Fire protection service and two 1" water services with a 3/4" potable water meter and; Work Order: N/A | |
| T22RW03116 | Complete | 08/27/2022 | 01/12/2023 | Right-of-Way (ROW) | Cox to bore 160' to install CATV conduit for system tie.** PROOF OF NOTIFICATION IS REQUIRED AT; Work Order: PRJ227499-1 | |
| TF-FCP-0823-01024 | Complete | 08/23/2023 | N/A | Fire Construction Permit | Fire Alarm MONITORING only | |
| TF-FCP-0423-00616 | Complete | 04/21/2023 | N/A | Fire Construction Permit | Dedicated Function Fire Sprinkler Monitoring System | |
| TF-FOP-0426-00434 | Complete | 04/01/2026 | 04/01/2027 | Fire Operational Permit | Outpatient Treatment Center | |
| TF-FOP-0125-00043 | Complete | 01/09/2025 | 01/14/2026 | Fire Operational Permit | PERCEPTION COUNSELING | |
| TF-FOP-0124-00027 | Complete | 01/08/2024 | 01/15/2025 | Fire Operational Permit | BEHAVIORAL HEALTH OUTPATIENT | |
| TF-FOP-0124-00021 | Void | 01/06/2024 | N/A | Fire Operational Permit | VOID-SUBMIT A FIRE STATE LICENSED FACILITY PERMIT - 1ST PERMIT NEW BUILDING REQUESTING STEVEN SWAIN | |
| T22RW02836 | FINAL | 08/09/2022 | 09/16/2022 | ROW | Work Order: 2207632 Location: 1213 E Warehouse Ave Work Description: Install New 1" Service Line with 1" Meter Work Area: In asphalt crossing Warehouse Ave ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON AT 520-400-6722 OR TOM ADKINS AT 520-400-3813. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. After the fact permit a MCP was not provided due to the nature of the work. Any legal questions related to this work shall be directed to Tucson Water to address since DTM did not have an opportunity to review, approve or inspect work. |