Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Address NEW:
436 S WILLIAMS BL
Apply Date:
07/02/2014
Applicant:
N/A
Description:
NEW TRAINING BUILDING WITH AN OPEN AIR BBQ
Contractors:
  • LLOYD CONSTRUCTION COMPANY INC ,

Permit Reviews

Permit Number - T14CM04154
Permit Status: C of o
Permit Description: NEW TRAINING BUILDING WITH AN OPEN AIR BBQ
Start Date Submittal Complete Date Status  
02/04/2015 REVISION - - 1ST 02/17/2015 COMPLETED Review Details
07/02/2014 PLANS OK TO SUBMIT - COMM 07/02/2014 COMPLETED Review Details
07/02/2014 COMMERCIAL - NEW 07/30/2014 COMPLETED Review Details
08/20/2014 RESUBMITTAL 09/08/2014 COMPLETED Review Details
09/24/2014 RESUBMITTAL 10/08/2014 COMPLETED Review Details
10/08/2014 RESUBMITTAL 10/15/2014 COMPLETED Review Details
10/15/2014 RESUBMITTAL 10/31/2014 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T14CM04154
Permit Status: C of o
Permit Description: NEW TRAINING BUILDING WITH AN OPEN AIR BBQ
Total Outstanding Activity Conditions - 1
Date Name
07/02/2014 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T14CM04154
Permit Description: NEW TRAINING BUILDING WITH AN OPEN AIR BBQ
Total Completed Inspections - 54
Date Description Inspector Results Comments
12/01/2014 ELECTRIC - UFER JBURGE Approved
12/09/2014 ELECTRIC - CONSTRUCTION POWER JBURGE Approved IVRS - Inspection :*
12/10/2014 TEP CLEARANCE - AM JBURGE Approved TMPP
12/15/2014 PLUMBING - ROUGH, SOIL JBURGE Approved ALL INTERIOR WASTE LINES AND VENTS; 4" WASTE LINE TO GREASE INTERCEPTOR - OK TO COVER PROGRESS AREAS
12/15/2014 PLUMBING - ROUGH, SOIL JBURGE Approved IVRS - Inspection :*
12/19/2014 EXCAVATION/LAYOUT REBAR & ZON JBURGE Approved FOOTINGS @ GL: 9/K-L; L/8-9
12/19/2014 EXCAVATION/LAYOUT REBAR & ZON JBURGE Approved IVRS - Inspection :*
12/22/2014 ELECTRIC - INTERMEDIATE JBURGE Approved 2 1/2" CONDUIT FEEDER LINES FOR 4 PANELS OF EAST & MIDDLE PORTION OF BUILDING - OK TO COVER PROGRESS AREAS
12/22/2014 ELECTRIC - INTERMEDIATE JBURGE Approved IVRS - Inspection :*
12/31/2014 REINFORCED MASONRY PRE-GROUT JBURGE Approved 8'-12' AT GL: J/5-6.75; B/4-5; 4/A-B; A/2-4; 2/A-E; 2/F-I; I/2-3.5; 4'-8' GL: I/3.5-4; OK TO GROUT PROGRESS AREAS
12/31/2014 STEM WALL/RETAINING WALL JBURGE Approved STEM WALL AT GL: 9/K-L; L-9-8 - OK TO GROUT
12/31/2014 STEM WALL/RETAINING WALL JBURGE Approved IVRS - Inspection :*
03/17/2015 FIRE SPKLR - UG, PIPING, HYDRO nsprenger Approved Ductile iron is covered, joints have megalugs ( felt under the plastic covering), 200 psi since 6 AM ( recorded at 10:26 AM), no leaks, built as per approved plans. City already back filled over their portion where it ties into permitted portion.
NS / 3/17/15
03/24/2015 FIRE SPKLR - UG PIPING FLUSH NSPRENGER Approved GENERAL CONTRACTOR CALLED IN, BUT THE SUBCONTRACTOR DID NOT CALL IN THEIR INSPECTION. I ADVISED THEM THAT THEY NEED TO DO SO IN THE FUTURE.
FLUSHED FOR A COUPLE MINUTES UNTIL CLEAR. GOOD PRESSURE FROM LINE.
NS 3/24/15
04/27/2015 PLUMBING - YARD WTR LINE/TEST BBENEDOI Approved IVRS - Inspection :*
04/29/2015 SITE - SEWER BBENEDOI Approved IVRS - Inspection :*
04/29/2015 PLUMBING - SEWER HCS CONNECT BBENEDOI Approved IVRS - Inspection :*
04/29/2015 PLUMBING - GAS PRESSURE TEST BBENEDOI Approved IVRS - Inspection :*
05/05/2015 FIRE SPKLR - OH PIPING & HYDRO CSCHULTZ Approved 200 PSI for 2 hours
07/01/2015 FRAMING JBURGE Approved IVRS - Inspection :*
07/09/2015 GAS CLEARANCE JBURGE Approved
07/13/2015 ELECTRIC - ABOVE CEILING JBURGE Approved IVRS - Inspection :*
07/13/2015 PLUMBING - INTERMEDIATE JBURGE Approved IVRS - Inspection :*
07/13/2015 MECHANICAL - ABOVE CEILING JBURGE Approved IVRS - Inspection :*
07/13/2015 MECHANICAL - INTERMEDIATE JBURGE Approved IVRS - Inspection :*
07/13/2015 SHEET ROCK NAILING JBURGE Approved IVRS - Inspection :*
07/13/2015 BUILDING ABOVE CEILING JBURGE Approved IVRS - Inspection :*
07/13/2015 ROOF NAILING JBURGE Approved IVRS - Inspection :*
07/13/2015 EXT METAL CLIPS/EXT SHEATHING JBURGE Approved IVRS - Inspection :*
07/13/2015 BUILDING PRE-SLAB JBURGE Approved IVRS - Inspection :*
07/13/2015 U VALUE FOR WINDOW JBURGE Approved IVRS - Inspection :*
07/20/2015 BUILDING - PROGRESS IVR USER Approved IVRS - AP canceled
07/29/2015 PLUMBING - FINAL JMILITELLO Approved CERTS FOR BACKFLOW ARE OK. CHLORINATION REPORT OK. SEPERATE DRAINS AT TWO COMPARTMENT SINKS AT BBQ AREA WILL CHECK ON BUILDING FINAL. INSULATE DRAINS AT ADA SINKS. WILL CHECK POLE LIGHTS AT BUILDING FINAL.
07/29/2015 PLUMBING - FINAL JMILITEL Approved IVRS - Inspection :*
07/29/2015 ELECTRIC - FINAL JMILITEL Approved IVRS - Inspection :*
07/29/2015 RIGHT OF WAY - FINAL JC Approved
07/30/2015 NPPO - FINAL RLEDONNE Approved
07/30/2015 SIGN - FINAL RLEDONNE Approved
08/03/2015 OUTDOOR LIGHTING FINAL JMILITEL Approved IVRS - Inspection :*
08/12/2015 MECHANICAL - HOODS JMILITEL Approved IVRS - Inspection :*
08/14/2015 ENGINEERING - FINAL MRUSSO Approved ENGINEERING APPROVED FOR THE BLDG ONLY, SITE/GRADING WILL BE ADDRESSED UNDER PERMIT DP14-0086
08/18/2015 MECHANICAL - FINAL JMILITELLO Approved WILL CHECK AIR BALANCE AT BUILDING FINAL
08/18/2015 MECHANICAL - FINAL JMILITEL Approved IVRS - Inspection :*
08/19/2015 HEALTH DEPT - FINAL 724-7908 DLUDWIG Approved
09/01/2015 FIRE - KITCHEN EXH HOOD FINAL CBASALDUA Approved
09/02/2015 PLUMBING - ABOVE CEILING JBURGE Approved PER BUILDING FINAL
09/02/2015 BUILDING - FINAL JBURGE Approved IVRS - Inspection :*
09/02/2015 PLUMBING - PROGRESS JBURGE Approved IVRS - Inspection :*
09/03/2015 ELECTRIC - PROGRESS JMILITELLO Approved PER ELEC FINAL
09/03/2015 PLUMBING - BACK WATER VALVE JMILITELLO Approved PER PLUMBING FINAL
09/03/2015 FIRE - FINAL CBASALDUA Approved
09/03/2015 FIRE SPKLR - FINAL CBASALDUA Approved
09/03/2015 FIRE - ALARM FINAL CBASALDUA Approved
09/04/2015 LANDSCAPE - FINAL MRUSSO Approved ALL OTHER ASPECTS OF THE PROJECT WILL BE ADDRESSED UNDER THE NEXT PHASE OF CONSTRUCTION