Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - UG, PIPING, HYDRO
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/17/2015 | FIRE SPKLR - UG, PIPING, HYDRO | Approved | Ductile iron is covered, joints have megalugs ( felt under the plastic covering), 200 psi since 6 AM ( recorded at 10:26 AM), no leaks, built as per approved plans. City already back filled over their portion where it ties into permitted portion. NS / 3/17/15 |
|
| 03/04/2015 | FIRE SPKLR - UG, PIPING, HYDRO | Cancelled | Called and talked to the contractor on site and asked him if they have a separate plan and permit for the UG he stated that need to cancel and he will have someone in first thing in the morning with a plan and get a permit. |