Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T14CM04154
Permit Details
Apply Date:
07/02/2014
Applicant:
N/A
Description:
NEW TRAINING BUILDING WITH AN OPEN AIR BBQ
Contractors:
- LLOYD CONSTRUCTION COMPANY INC ,
Permit Reviews
Permit Number - T14CM04154
Permit Status: C of o
Permit Description: NEW TRAINING BUILDING WITH AN OPEN AIR BBQ
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/04/2015 | REVISION - - 1ST | 02/17/2015 | COMPLETED |
07/02/2014 | PLANS OK TO SUBMIT - COMM | 07/02/2014 | COMPLETED |
07/02/2014 | COMMERCIAL - NEW | 07/30/2014 | COMPLETED |
08/20/2014 | RESUBMITTAL | 09/08/2014 | COMPLETED |
09/24/2014 | RESUBMITTAL | 10/08/2014 | COMPLETED |
10/08/2014 | RESUBMITTAL | 10/15/2014 | COMPLETED |
10/15/2014 | RESUBMITTAL | 10/31/2014 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T14CM04154
Permit Status: C of o
Permit Description: NEW TRAINING BUILDING WITH AN OPEN AIR BBQ
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
07/02/2014 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T14CM04154
Permit Description: NEW TRAINING BUILDING WITH AN OPEN AIR BBQ
Total Completed Inspections - 54
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/01/2014 | ELECTRIC - UFER | JBURGE | Approved | |
12/09/2014 | ELECTRIC - CONSTRUCTION POWER | JBURGE | Approved | IVRS - Inspection :* |
12/10/2014 | TEP CLEARANCE - AM | JBURGE | Approved | TMPP |
12/15/2014 | PLUMBING - ROUGH, SOIL | JBURGE | Approved | ALL INTERIOR WASTE LINES AND VENTS; 4" WASTE LINE TO GREASE INTERCEPTOR - OK TO COVER PROGRESS AREAS |
12/15/2014 | PLUMBING - ROUGH, SOIL | JBURGE | Approved | IVRS - Inspection :* |
12/19/2014 | EXCAVATION/LAYOUT REBAR & ZON | JBURGE | Approved | FOOTINGS @ GL: 9/K-L; L/8-9 |
12/19/2014 | EXCAVATION/LAYOUT REBAR & ZON | JBURGE | Approved | IVRS - Inspection :* |
12/22/2014 | ELECTRIC - INTERMEDIATE | JBURGE | Approved | 2 1/2" CONDUIT FEEDER LINES FOR 4 PANELS OF EAST & MIDDLE PORTION OF BUILDING - OK TO COVER PROGRESS AREAS |
12/22/2014 | ELECTRIC - INTERMEDIATE | JBURGE | Approved | IVRS - Inspection :* |
12/31/2014 | REINFORCED MASONRY PRE-GROUT | JBURGE | Approved | 8'-12' AT GL: J/5-6.75; B/4-5; 4/A-B; A/2-4; 2/A-E; 2/F-I; I/2-3.5; 4'-8' GL: I/3.5-4; OK TO GROUT PROGRESS AREAS |
12/31/2014 | STEM WALL/RETAINING WALL | JBURGE | Approved | STEM WALL AT GL: 9/K-L; L-9-8 - OK TO GROUT |
12/31/2014 | STEM WALL/RETAINING WALL | JBURGE | Approved | IVRS - Inspection :* |
03/17/2015 | FIRE SPKLR - UG, PIPING, HYDRO | nsprenger | Approved | Ductile iron is covered, joints have megalugs ( felt under the plastic covering), 200 psi since 6 AM ( recorded at 10:26 AM), no leaks, built as per approved plans. City already back filled over their portion where it ties into permitted portion. NS / 3/17/15 |
03/24/2015 | FIRE SPKLR - UG PIPING FLUSH | NSPRENGER | Approved | GENERAL CONTRACTOR CALLED IN, BUT THE SUBCONTRACTOR DID NOT CALL IN THEIR INSPECTION. I ADVISED THEM THAT THEY NEED TO DO SO IN THE FUTURE. FLUSHED FOR A COUPLE MINUTES UNTIL CLEAR. GOOD PRESSURE FROM LINE. NS 3/24/15 |
04/27/2015 | PLUMBING - YARD WTR LINE/TEST | BBENEDOI | Approved | IVRS - Inspection :* |
04/29/2015 | SITE - SEWER | BBENEDOI | Approved | IVRS - Inspection :* |
04/29/2015 | PLUMBING - SEWER HCS CONNECT | BBENEDOI | Approved | IVRS - Inspection :* |
04/29/2015 | PLUMBING - GAS PRESSURE TEST | BBENEDOI | Approved | IVRS - Inspection :* |
05/05/2015 | FIRE SPKLR - OH PIPING & HYDRO | CSCHULTZ | Approved | 200 PSI for 2 hours |
07/01/2015 | FRAMING | JBURGE | Approved | IVRS - Inspection :* |
07/09/2015 | GAS CLEARANCE | JBURGE | Approved | |
07/13/2015 | ELECTRIC - ABOVE CEILING | JBURGE | Approved | IVRS - Inspection :* |
07/13/2015 | PLUMBING - INTERMEDIATE | JBURGE | Approved | IVRS - Inspection :* |
07/13/2015 | MECHANICAL - ABOVE CEILING | JBURGE | Approved | IVRS - Inspection :* |
07/13/2015 | MECHANICAL - INTERMEDIATE | JBURGE | Approved | IVRS - Inspection :* |
07/13/2015 | SHEET ROCK NAILING | JBURGE | Approved | IVRS - Inspection :* |
07/13/2015 | BUILDING ABOVE CEILING | JBURGE | Approved | IVRS - Inspection :* |
07/13/2015 | ROOF NAILING | JBURGE | Approved | IVRS - Inspection :* |
07/13/2015 | EXT METAL CLIPS/EXT SHEATHING | JBURGE | Approved | IVRS - Inspection :* |
07/13/2015 | BUILDING PRE-SLAB | JBURGE | Approved | IVRS - Inspection :* |
07/13/2015 | U VALUE FOR WINDOW | JBURGE | Approved | IVRS - Inspection :* |
07/20/2015 | BUILDING - PROGRESS | IVR USER | Approved | IVRS - AP canceled |
07/29/2015 | PLUMBING - FINAL | JMILITELLO | Approved | CERTS FOR BACKFLOW ARE OK. CHLORINATION REPORT OK. SEPERATE DRAINS AT TWO COMPARTMENT SINKS AT BBQ AREA WILL CHECK ON BUILDING FINAL. INSULATE DRAINS AT ADA SINKS. WILL CHECK POLE LIGHTS AT BUILDING FINAL. |
07/29/2015 | PLUMBING - FINAL | JMILITEL | Approved | IVRS - Inspection :* |
07/29/2015 | ELECTRIC - FINAL | JMILITEL | Approved | IVRS - Inspection :* |
07/29/2015 | RIGHT OF WAY - FINAL | JC | Approved | |
07/30/2015 | NPPO - FINAL | RLEDONNE | Approved | |
07/30/2015 | SIGN - FINAL | RLEDONNE | Approved | |
08/03/2015 | OUTDOOR LIGHTING FINAL | JMILITEL | Approved | IVRS - Inspection :* |
08/12/2015 | MECHANICAL - HOODS | JMILITEL | Approved | IVRS - Inspection :* |
08/14/2015 | ENGINEERING - FINAL | MRUSSO | Approved | ENGINEERING APPROVED FOR THE BLDG ONLY, SITE/GRADING WILL BE ADDRESSED UNDER PERMIT DP14-0086 |
08/18/2015 | MECHANICAL - FINAL | JMILITELLO | Approved | WILL CHECK AIR BALANCE AT BUILDING FINAL |
08/18/2015 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection :* |
08/19/2015 | HEALTH DEPT - FINAL 724-7908 | DLUDWIG | Approved | |
09/01/2015 | FIRE - KITCHEN EXH HOOD FINAL | CBASALDUA | Approved | |
09/02/2015 | PLUMBING - ABOVE CEILING | JBURGE | Approved | PER BUILDING FINAL |
09/02/2015 | BUILDING - FINAL | JBURGE | Approved | IVRS - Inspection :* |
09/02/2015 | PLUMBING - PROGRESS | JBURGE | Approved | IVRS - Inspection :* |
09/03/2015 | ELECTRIC - PROGRESS | JMILITELLO | Approved | PER ELEC FINAL |
09/03/2015 | PLUMBING - BACK WATER VALVE | JMILITELLO | Approved | PER PLUMBING FINAL |
09/03/2015 | FIRE - FINAL | CBASALDUA | Approved | |
09/03/2015 | FIRE SPKLR - FINAL | CBASALDUA | Approved | |
09/03/2015 | FIRE - ALARM FINAL | CBASALDUA | Approved | |
09/04/2015 | LANDSCAPE - FINAL | MRUSSO | Approved | ALL OTHER ASPECTS OF THE PROJECT WILL BE ADDRESSED UNDER THE NEXT PHASE OF CONSTRUCTION |