Permit: T11CM02865
Permit Details
Apply Date:
09/06/2011
Applicant:
N/A
Description:
TI; RESTAURANT
Contractors:
- AIR VELOCITY INCORPORATED
Permit Reviews
Permit Number - T11CM02865
Permit Status: Expired
Permit Description: TI; RESTAURANT
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/13/2012 | REVISION - - 2ND | 01/13/2012 | COMPLETED |
04/23/2012 | REVISION - - 3RD | 05/07/2012 | COMPLETED |
06/04/2012 | REVISION - - 4TH | 06/29/2012 | COMPLETED |
09/06/2011 | PLANS OK TO SUBMIT - COMM | 09/06/2011 | COMPLETED |
09/06/2011 | COMMERCIAL - TI | 10/13/2011 | COMPLETED |
10/13/2011 | RESUBMITTAL | 10/17/2011 | COMPLETED |
10/17/2011 | RESUBMITTAL | 11/22/2011 | COMPLETED |
11/23/2011 | RESUBMITTAL | 12/13/2011 | COMPLETED |
12/13/2011 | RESUBMITTAL | 12/21/2011 | COMPLETED |
12/29/2011 | REVISION - - 1ST | 01/13/2012 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T11CM02865
Permit Status: Expired
Permit Description: TI; RESTAURANT
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
09/06/2011 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T11CM02865
Permite Description: TI; RESTAURANT
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
PLUMBING - GAS PRESS TEST FNL | N/A | Not Inspected |
Completed Inspections
Permit Status: Expired
Permit Number: T11CM02865
Permit Description: TI; RESTAURANT
Total Completed Inspections - 33
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/22/2011 | PLUMBING - PRE SLAB | BBENEDON | Approved | IVRS - Inspection :* NOT UNDER TEST "NEED LIGHTS TO SEE" |
12/22/2011 | FRAMING | DWALKER | Approved | IVRS - Inspection : See detailed listing on site.| 999* |
12/27/2011 | ELECTRIC - UNDERGROUND | RHOLLAND | Approved | IVRS - Inspection :* 1) INSTALL VDV CABLEING 725.8, 800.24 2) WIRING AT SPRINKLER VALVE IN WALL OK UNDERGROUND NOTE SOME RUNS HAVE 360 DEGREE (GROUND)-WILL NEED JUNCTION BOXES COMMING OUT OF WALLS OK WALL EXCEPT AS NOTED 3) 1200 AMP SES TO HAVE CLEARANCES PER 110.26(c) |
12/27/2011 | ELECTRIC - INTERMEDIATE | RHOLLAND | Approved | IVRS - Inspection :* |
12/28/2011 | MECHANICAL - HOODS | MRAMBER | Approved | IVRS - Inspection :* 1) CONTRACTOR NEEDS TO BE ON SITE FOR INSPECTION |
12/28/2011 | PLUMBING - ROUGH, SOIL | BBENEDON | Approved | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE SAFE LIGHTING FOR INSPECTION 2) REMOVE ROCKS AND MUD 3) ALL PIPING REQUIRES CONTINOUS SUPPORT 4) SHADE PIPEING WITH CLEAN FILL 5) INSTALL PIPING PER PLAN AND PROVIDE DOCUMENTATION FOR ANY CHANGES-MANY SIZE DISCREPENCIES 6) COMBINATION WASTE AND VENT REQUIRES 2" FLOOR SINKS WITH A 2 X 3 INCREASER ON TAIL PIECE AS SHOWN ON YOUR PLAN 7) THE POINT OF VENT FOR ALL VENTS SHALL BE TAKEN OFF ABOVE THE CENTER LINE OF THE DRAIN SERVED (ROLL UP AT 45 DEGREE MINIMUM) 8) RE-VENTS SHALL BE 6" ABOVE THE FLOOD LEVEL OF THE HIGHEST FLANGE 9) CORRECT SLOPE 10) GW HAS BACK PITCH 11) ALL DRAIN LINES REQUIRE FULL SIZED CLEANOUTS 12) A DIRECT CONNECTION IS REQUIRED PER UPC 704.3 FOR ALL FIXTURES EXCEPT WHEN REQUIRED INDIRECT WASTE 13) INSTALL A DIRECT CONNECTION AT 3 COMP SINK FOR WASH AND RINSE COMPARTMENTS |
01/11/2012 | SITE - SEWER | BBENEDON | Approved | IVRS - Inspection :* 1) INTERCEPTOR AND SEWER OK TO COVER |
02/27/2012 | SHEET ROCK NAILING | JMILITEL | Approved | IVRS - Inspection :* |
04/25/2012 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* |
04/25/2012 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* |
04/25/2012 | PLUMBING - GAS PRESSURE TEST | JMILITEL | Approved | IVRS - Inspection :* |
05/11/2012 | PLUMBING - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* |
05/11/2012 | PLUMBING - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* |
05/25/2012 | ELECTRIC - UFER | DWALKER | Approved | |
05/25/2012 | ELECTRIC - ABOVE CEILING | DWALKER | Approved | |
05/25/2012 | ELECTRIC - FINAL | DWALKER | Approved | IVRS - Inspection :* |
07/26/2012 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection :* |
07/27/2012 | FIRE - KITCHEN EXH HOOD FINAL | WMOTTO | Approved | |
07/30/2012 | FIRE SPKLR - FINAL | CBASALDU | Approved | |
07/30/2012 | FIRE - ALARM FINAL | CSCHULTZ | Approved | |
07/31/2012 | FIRE - FINAL | CBASALDU | Approved | |
08/02/2012 | PLUMBING - YARD WTR LINE/TEST | BBENEDON | Approved | IVRS - Inspection :* |
08/02/2012 | PLUMBING - YARD WTR LINE/TEST | BBENEDON | Approved | IVRS - Inspection :* |
08/02/2012 | PLUMBING - FINAL | BBENEDON | Approved | IVRS - Inspection :* |
08/02/2012 | PLUMBING - PROGRESS | BBENEDON | Approved | IVRS - Inspection :* |
08/03/2012 | BUILDING - FINAL | DWALKER | Approved | IVRS - Inspection :* |
08/03/2012 | BUILDING - PROGRESS | DWALKER | Approved | IVRS - Inspection :* |
08/03/2012 | BUILDING ABOVE CEILING | DWALKER | Approved | IVRS - Inspection :* |
08/07/2012 | RIGHT OF WAY - FINAL | P.Whiddon | Approved | |
08/07/2012 | NPPO - FINAL | RLEDONNE | Approved | NA TO THIS ACTIVITY. |
08/07/2012 | SIGN - FINAL | RLEDONNE | Approved | NA TO THIS ACTIVITY. |
08/07/2012 | LANDSCAPE - FINAL | RLEDONNE | Approved | NA TO THIS ACTIVITY. |
08/07/2012 | ENGINEERING - FINAL | RLEDONNE | Approved | NO CHANGE TO OUT SIDE OF BUILDING PER AP PLANS. |