Inspection Status: Approved
Inspection History: PLUMBING - PROGRESS
Permit Number - T11CM02865
Inspection Description - PLUMBING - PROGRESS
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/02/2012 | PLUMBING - PROGRESS | Approved | IVRS - Inspection :* | |
07/30/2012 | PLUMBING - PROGRESS | Not ready for Inspection | LOCATE MISSING CLEAN OUTS AND WATER HAMMER ARRESTERS AT FLUSH O METERS (NOT SHOWN ON PLAN) COMPLETE ALL NOTED ITEMS | |
07/27/2012 | PLUMBING - PROGRESS | Denied | PROVIDE DOCUMENTATION OF WATER SYSTEM STERILIZATION AND CLEAN BAC T REPORT. PROVIDE BACKFLOW CERTIFICATIONS FOR ALL INTERNAL ASSEMBLIES, INSTALL ASSEMBLIES AT 5' MAXIMUM HEIGHT AND PIPE FUNNEL DRAINS. SECURE ALL ASSEMBLIES AND PIPING WITH APPROVED PIPE CLAMPS. EACH BCSV EQUIPMENT REQUIRES BACKFLOW PROTECTION. ALL PVC DRAINS REQUIRE PRIMER AT FITTINGS. PROVIDE TRAFFIC RATES CO COVERS. LOCATE AND MAKE ACCESSIBLE ALL CLEAN OUTS. PROVIDE PLUGS LISTES TO RECEIVE THE SCREW. SEAL ALL PLUGS. PIPE INTERCEPTOR VENT IN METAL OR PROVIDE PHYSICAL PROTECTION. PROVIDE PROPER DRAINAGE FITTINGS AT 3 COMP SINK. MAKE ALL CO COVERS AND FDS FINISHED FLOOR HEIGHT. GAS SAFETY CABLES ETC. LIST MAY NOT BE COMPLETE. MISSING A A V AT BUFFET. | |
02/15/2012 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE WASTE PIPE SHOWN FOR ? COMP SINK DIRECT CONNECTION 704.3 2) PROVIDE MINIMUM 10' CLEAR BETWEEN VTR AND AIR INTAKE 3) INSTALL FLASHINGS ON ROOF PENETRATIONS, REMOVE ABANDON C1 4) WIPE OFF EXCESS FLUX 5) PROVIDE MINIMUM REQUIRED SUPPORTS OVERHEAD 6) INSTALL BACKING FOR MOP SINK FAUCET 7) PROVIDE PLAN REVISIONS FOR CHANGES OF WATER SYSTEM; PIPE INSULATION, WATER HEATER AND ANY OTHER CHANGES 8) 3" GAS PIPE IN WALL OK SUBJECT TO TEST |
|
02/07/2012 | PLUMBING - PROGRESS | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
01/18/2012 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* 1) SHOW CHANGES OF WATER SYSTEM WITH RD ON YOUR APPROVED PLAN |
|
01/17/2012 | PLUMBING - PROGRESS | Denied | 1) OK TO COVER SOIL PIPING 2) DWV TEST TO ABOVE WALL OK-INSTALLED PER RWS REVISION 3) INSTALL FOAM WRAPS ON ALL PIPING PENETRATING CONCRETE 4) COPPER SHOWN AS OVERHEAD EXCEPT AT BUFFET 5) PROVIDE LETTER OF ENGINEER APPROVAL FOR CW UNDER SLAB 6) PIPING IN WALLS REQUIRE SUPPORT AND ALL COPPER JOINTS SHALL BE REAMED & TESTED 7) LETTER PROVIDED FOR USE OF TYPE L CU BELOW SLAB |
|
01/11/2012 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* 1) NO TEST ON SYSTEM (DWV)-CONTINUED NOT READYS WILL RESULT IN REINSPECTION FEES |
|
01/03/2012 | PLUMBING - PROGRESS | Denied | 1) ADDRESS IS COVERED BY YOUR BANNER 2) COMPLETE ALL NOTED CORRECTIONS; CORRECT SLOPE, CORRECT SIZING AND CORRECT VENT TAKE OFFS 3) POINT OF VENT MAY NOT BE BELOW TRAP WEIR 4) OK TO INSTALL FOAM WRAPS 5) TROUGH DRAINS REQUIRE A WATER TEST |