Permit: T10CM01509
Permit Details
Apply Date:
06/02/2010
Applicant:
N/A
Description:
FOUNDATION ONLY FOR FUTURE OFFICE BUILDING
Contractors:
- RYAN COMPANIES U S INC
Permit Reviews
Permit Number - T10CM01509
Permit Status: Final
Permit Description: FOUNDATION ONLY FOR FUTURE OFFICE BUILDING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/02/2010 | PLANS OK TO SUBMIT - COMM | 06/02/2010 | COMPLETED |
| 06/02/2010 | COMMERCIAL-BLDG/FIRE/ZONING/ENG | 06/29/2010 | COMPLETED |
| 06/29/2010 | RESUBMITTAL | 07/14/2010 | COMPLETED |
| 07/14/2010 | RESUBMITTAL | 07/28/2010 | COMPLETED |
| 07/28/2010 | OTHER | 07/28/2010 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T10CM01509
Permit Status: Final
Permit Description: FOUNDATION ONLY FOR FUTURE OFFICE BUILDING
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 06/02/2010 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T10CM01509
Permit Description: FOUNDATION ONLY FOR FUTURE OFFICE BUILDING
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/02/2010 | PLUMBING - PRE SLAB | RLEDONNE | Approved | 1) FROM EAST SIDE AREA DOWN TO CLEANOUT, PRE-SLAB OK |
| 09/07/2010 | PLUMBING - ROUGH, SOIL | LHANLY | Approved | 2" SUMP DRAINS LEVEL B-3 AREA A-C/14-16 OK |
| 09/08/2010 | PLUMBING - INTERMEDIATE | RLEDONNE | Approved | IVRS - Inspection :* 1) P201B PER HIGHLIGHT |
| 09/09/2010 | ELECTRIC - UFER | RHOLLAND | Approved | IVRS - Inspection :* 1) OK CADWELDS UP COLUMNS MARKED |
| 10/26/2010 | EXCAVATION/LAYOUT REBAR & ZON | LHANLY | Approved | COMPLETION OF CAISSONS LEVEL 1 GRIDLINE 1-3 OK |
| 12/20/2010 | FIRE SPKLR - UG, PIPING, HYDRO | CSCHULTZ | Approved | 1. WILL NEED SEPARATE PERMIT FOR UNDERGROUND SERVICE 2. 40 FEET OF 8" DUCTILE PIPING IN GROUND 4 FEET WITH END CAPS OKAY TO COVER 3. WILL NEED TO PRESSURE TEST AT 200 PSI FOR 2 HOURS 4. WILL NEED TO FLUSH PIPING |
| 12/30/2010 | ELECTRIC - UNDERGROUND | LHANLY | Approved | NEED TO RELOCATE OUTLETS AND CONDUITS IN BEAM LINE 15 FROM A-C. CANNOT HAVE PLASTIC IN CRUSH ZONES OF TENDONS. CONDUIT BURNING DECK AT J14 AND TOO CLOSE TO TOP OF SLAB AT I13. |
| 12/30/2010 | BUILDING - PROGRESS | LHANLY | Approved | MAN LIFT REPORTS REVIEWED. OPERATION ALLOWED TO 3RD LEVEL. |
| 12/30/2010 | BUILDING PRE-SLAB | LHANLY | Approved | SOUTH PLAZA LEVEL REQUIRES CORRECTIONS TO ELECTRICAL INSTALLATION PRIOR TO OUTSIDE POURS. |
| 12/30/2010 | STEM WALL/RETAINING WALL | LHANLY | Approved | COLS AND SHEAR WALLS SOUTH PLAZA LEVEL OK |
| 02/08/2011 | FIREWALL/FIREBARRIER/FIRESTOP | LHANLY | Approved | SEE SHELL PERMIT FOR ALL REMAINING INSPECTION RESULTS |
| 02/25/2011 | BUILDING - FINAL | LHANLY | Approved | |
| 03/04/2011 | ELECTRIC - FINAL | LHANLY | Approved | |
| 07/15/2011 | PLUMBING - PROGRESS | LHANLY | Approved | |
| 09/13/2011 | PLUMBING - FINAL | LHANLY | Approved | |
| 09/13/2011 | PLUMBING - ROOF DRAINS | LHANLY | Approved |