Inspection Status: Approved
Inspection History: STEM WALL/RETAINING WALL
Permit Number - T10CM01509
Inspection Description - STEM WALL/RETAINING WALL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/08/2011 | STEM WALL/RETAINING WALL | Approved | ||
01/05/2011 | STEM WALL/RETAINING WALL | Partial Approval | ||
12/30/2010 | STEM WALL/RETAINING WALL | Partial Approval | COLS AND SHEAR WALLS SOUTH PLAZA LEVEL OK | |
12/09/2010 | STEM WALL/RETAINING WALL | Partial Approval | SHEARWALLS NE LEVEL 5 OK TO PLACE | |
12/08/2010 | STEM WALL/RETAINING WALL | Partial Approval | COLUMNS LEVEL 5 NE OK TO CLOSE AND PLACE | |
12/06/2010 | STEM WALL/RETAINING WALL | Partial Approval | COLS LEVEL 4 NW OK TO PLACE | |
12/06/2010 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL 4 NW COLS AND SHEARWALLS OK | |
11/29/2010 | STEM WALL/RETAINING WALL | Partial Approval | SHEARWALLS LEVEL 4 NE OK TO CLOSE | |
11/08/2010 | STEM WALL/RETAINING WALL | Partial Approval | COLS & SHEARWALLS LEVEL B1 SE OK COLS NW LEVEL 2 OK |
|
11/01/2010 | STEM WALL/RETAINING WALL | Partial Approval | COLUMNS AND SHEAR WALLS OK NW LEVEL B1 COLUMNS OK NE LEVEL 2 |
|
10/28/2010 | STEM WALL/RETAINING WALL | Partial Approval | ALL LEVEL 1 COLUMNS AND SHEAR WALLS NORTH SIDE OK TO PLACE | |
10/28/2010 | STEM WALL/RETAINING WALL | Partial Approval | COLS AT B2 - B1 RAMP OK | |
10/19/2010 | STEM WALL/RETAINING WALL | Partial Approval | B2 LEVEL SW COLS OK TO PLACE PLAZA LEVEL NE COLS & SHEARWALLS OK TO PLACE |
|
10/18/2010 | STEM WALL/RETAINING WALL | Partial Approval | OK TO CLOSE COLUMNS PLAZA LEVEL NE QUADRANT | |
10/13/2010 | STEM WALL/RETAINING WALL | Partial Approval | PROGRESS ONLY. NOTHING READY TO PLACE | |
10/12/2010 | STEM WALL/RETAINING WALL | Partial Approval | PROGRESS ONLY. NOTHING READY TO PLACE | |
10/05/2010 | STEM WALL/RETAINING WALL | Partial Approval | COLUMNS AND SHEARWALLS LEVEL B1 A-E/3-11 OK | |
10/01/2010 | STEM WALL/RETAINING WALL | Partial Approval | PLACEMENT OF COLS AND SHEARWALLS LEVEL B1 AREA E-J/3-11 OK. | |
09/29/2010 | STEM WALL/RETAINING WALL | Partial Approval | OK TO CLOSE AND PLACE COLUMNS AND SHEAR WALLS LEVEL B1 @ E-J/3-11 | |
09/27/2010 | STEM WALL/RETAINING WALL | Partial Approval | COLUMNS AND STEMWALLS LEVEL B2 A-E/3-11 | |
09/23/2010 | STEM WALL/RETAINING WALL | Partial Approval | SHOTCRETE WALLS BASEMENT WALLS COMPLETE. NEED TO CLEAN STEEL ON COLUMNS AT LEVEL B2 @ B7 AND E11 |
|
09/21/2010 | STEM WALL/RETAINING WALL | Partial Approval | COMPLETION OF WALL LINE 16 OK. OK TO PLACE LINE A / 11-16 |
|
09/20/2010 | STEM WALL/RETAINING WALL | Partial Approval | OK TO CLOSE COLUMNS LEVEL B2 AREA E-J/3-11. SHEARWALL NOT READY. |
|
09/17/2010 | STEM WALL/RETAINING WALL | Partial Approval | LINE 16 OK TO PLACE SHOTCRETE. | |
09/15/2010 | STEM WALL/RETAINING WALL | Partial Approval | LINE 16 G-J OK TO PLACE SHOTCRETE NEED TO ADDRESS GSN'S FOR C.I.P. CONCRETE KEYNOTE #11, LINE I LEVEL B2 MISSING CHAMFER |
|
09/14/2010 | STEM WALL/RETAINING WALL | Partial Approval | LINE 16 NOT READY FOR INSPECTION. SLAB BARS OUT OF PLACE | |
09/13/2010 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL B3 COLS AREA A-J / 11-16 OK TO CLOSE LINE J / 11-16 OK TO SHOTCRETE |
|
09/09/2010 | STEM WALL/RETAINING WALL | Partial Approval | OK TO CLOSE ALL COLS AREA F-G/11-16 LINE A / 7-11 OK TO SHOTCRETE LINE J / 11-16 REQUIRES MINOR ADJUSTMENTS TO STEEL BEFORE PLACING SHOTCRETE. MAY BE VERIFIED BY SP. INSP. |
|
09/08/2010 | STEM WALL/RETAINING WALL | Partial Approval | 1) SHOTCRETE OK LINE A/TO 7; MISSING GROUNDING CONDUCTOR EXTENSION AT COL 7, LEVEL 11; PLEASE INSTALL BEFORE MOVING FORWARD 2) COL AT 12/G IS INCORRECT NEED C22 NOT C27 3) REMAINING COLS LINE 4 AND LINE 5 OK TO PLACE |
|
09/07/2010 | STEM WALL/RETAINING WALL | Partial Approval | PROGRESS ON LINE 3 / A-E OK. OK TO BEGIN LINE A / 3-6 |
|
09/02/2010 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* 1) COLUMN POURS OK AREA 3-11 2) DO NOT CLOSE C-2 COLUMN AT B/4 58.11 NEED TO EXTEND LIGHTING PROTECTION TO TOP OF COLUMN 3) LINE A WALL STILL NOT READY FOR ? 4) PORTION OF SW8 STILL REQUIRES HOOKS 12" ON CENTER-OK TO CLOSE WHEN SPECIAL INSPECTION VERIFIED |
|
08/31/2010 | STEM WALL/RETAINING WALL | Partial Approval | 1) COLS PLACED TODAY AREA 3-11 OK 2) OK TO CLOSE AND PLACE SWC,SW7,SW8 (SW8 REQUIRES HOOKS AT ENDS) 3) OK TO COLSET AND PLACE REMAINING COLS, EXCEPT NEED ELECTRICAL EXTENSIONS OR TERMINATIONS AT 3 COLS BEFORE CLOSING 4) BASEMENT WALL LINE "A" NOT READY |
|
08/30/2010 | STEM WALL/RETAINING WALL | Partial Approval | 100' OF SHOTCRETE LINE J / 11.5 - 6 LEVELS B3 TO B1 INSTALLED. I STILL NEED VERIFICATION THAT 100' BETWEEN CONSTRUCTION JOINTS IS ACCEPTABLE. 7 COLUMNS PLACED. 7 COLS OK TO CLOSE. OK TO CLOSE SW7, SW8, SWC. |
|
08/26/2010 | STEM WALL/RETAINING WALL | Partial Approval | LEVEL B3-- SW 7,8 & G.4 OK TO PLACE | |
08/25/2010 | STEM WALL/RETAINING WALL | Partial Approval | SHOTCRETE WALL LINE 3 / A-E IN PLACE. NEED TO CLARIFY DETAIL 013 FOR VERITICAL CONTROL JOINTS AND VERIFY EXTRA BARS (#5 X 7' LONG 36" OC) ALONG B2 FLOOR LINE. TIES AT COLUMNS REQUIRE 1" SEPARATION FOR CONCRETE ENCASEMENT. PLEASE HAVE RFI'S TAPED INTO PLAN SET. CLARIFY AMERIDRAIN PLACEMENT BEHIND RETAINING WALL (SHORING WALL) RATHER THAN BEHIND STRUCTURAL WALL. |
|
08/24/2010 | STEM WALL/RETAINING WALL | Partial Approval | PLACEMENT OF PERIMITER STEEL LINE 3/E-J AND LINE J/3-11.5 OK. NEED CLARIFICATION ON TYING COLS LINE J TO WALL. | |
08/16/2010 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* |