Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T10CM00905
Permit Details
Status:
Final
Type:
COMMERCIAL ALTERATION
Address:
1650 W VALENCIA RD
Address NEW:
1650 W VALENCIA RD
Apply Date:
04/06/2010
Applicant:
N/A
Description:
TI: RETAIL (WALMART #1612 REVISION 1: VARIOUS CHANGES, SEE CCD 4 and 6 REVISION 4: VARIOUS CHANGES MOSTLY MECH
Contractors:
- H B I CONSTRUCTION INCORPORATED (FN)
Permit Reviews
Permit Number - T10CM00905
Permit Status: Final
Permit Description: TI: RETAIL (WALMART #1612
REVISION 1: VARIOUS CHANGES, SEE CCD 4 and 6
REVISION 4: VARIOUS CHANGES MOSTLY MECH
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/06/2010 | PLANS OK TO SUBMIT - COMM | 04/06/2010 | COMPLETED |
| 04/07/2010 | COMMERCIAL TI | 05/12/2010 | COMPLETED |
| 05/12/2010 | OTHER | 05/12/2010 | COMPLETED |
| 05/24/2010 | RESUBMITTAL | 06/08/2010 | COMPLETED |
| 06/08/2010 | RESUBMITTAL | 06/10/2010 | COMPLETED |
| 07/08/2010 | REVISION - - 1ST | 07/22/2010 | COMPLETED |
| 07/22/2010 | REVISION - - 1ST | 09/27/2010 | COMPLETED |
| 07/28/2010 | REVISION - - 2ND | 08/23/2010 | COMPLETED |
| 08/23/2010 | REVISION - - 2ND | 09/27/2010 | COMPLETED |
| 09/16/2010 | REVISION - - 3RD | 10/13/2010 | COMPLETED |
| 10/13/2010 | REVISION - - 3RD | 10/18/2010 | COMPLETED |
| 10/18/2010 | REVISION - - 4TH | 10/18/2010 | COMPLETED |
| 11/16/2010 | REVISION - - 5TH | 11/16/2010 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T10CM00905
Permit Description: TI: RETAIL (WALMART #1612
REVISION 1: VARIOUS CHANGES, SEE CCD 4 and 6
REVISION 4: VARIOUS CHANGES MOSTLY MECH
Total Completed Inspections - 39
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/02/2010 | ELECTRIC - UNDERGROUND | RMORENO | Approved | IVRS - Inspection :* 1) FLOOR BOX TO FLOOR BOX 3/4 PVC TO SOUTH WAL FOR FREEZERS ALL OK 2) RECEIVED $150.00 FROM CONTRACTOR FOR AFTER HOURS INSPECTION |
| 12/03/2010 | BUILDING ABOVE CEILING | MHENSON | Approved | IVRS - Inspection :* 1) JUICE AREA CLIPS IN PLACE 2) NO TILES INSTALLED UNTIL ALL TRADES OK |
| 12/06/2010 | MECHANICAL - ABOVE CEILING | MRAMBER | Approved | IVRS - Inspection :* 1) 36" DUCT ABOVE PRODUCE PREP OK TO COVER |
| 12/07/2010 | PLUMBING - GAS PRESSURE TEST | RLEDONNE | Approved | IVRS - Inspection :* 1) 60 PSI TEST OK |
| 12/08/2010 | FIRE SPKLR - FINAL | LTHOMAS | Approved | Hds missing on line 2 hds in exit corr. plywood off 1 painted head 1 hd in dinning closet |
| 12/09/2010 | ELECTRIC - ABOVE CEILING | RHOLLAND | Approved | IVRS - Inspection :* 1) WALL PLUG FOR WATER DISPENSOR IS BEING DELETED 2) HEAT TABLES INSTALLED PER MANUFACTURERS INSTRUCTIONS 3) OK ABOVE CEILING BAKERY/HOT DELI 4) FINISH MAIN BREAKER AND ENCLOSE CHANGE OUT FOR "L4D3" |
| 12/09/2010 | PLUMBING - GAS PRESS TEST FNL | RLEDONNE | Approved | IVRS - Inspection :* 1) UNCOVER ALL AAVS 2) PROVIDE ALL BACKFLOW CERTS 3) COMPLETE ALL SUPPORT ON WATER AND DRAIN PIPING 4) COMPLETE ALL MIXING STATION AT SINKS AND MOP SINKS 5) GAS OK IN BAKERY AREA |
| 12/10/2010 | ELECTRIC - INTERMEDIATE | RHOLLAND | Approved | IVRS - Inspection :* 1) CANCELLED |
| 12/10/2010 | BUILDING - PROGRESS | MHENSON | Approved | IVRS - Inspection :* 1) JUICE BAR OK TO OCCUPY 2) FOR FINAL TRADES, FIRE AND ENGINEERING FINALED 3) SPECIAL INSPECTION CERT DBL STAMPED |
| 12/13/2010 | FIRE - KITCHEN EXH HOOD FINAL | DRAMIREZ | Approved | |
| 12/13/2010 | MECHANICAL - FINAL | MRAMBER | Approved | |
| 12/13/2010 | BUILDING PRE-SLAB | MHENSON | Approved | IVRS - Inspection :* |
| 12/13/2010 | STEM WALL/RETAINING WALL | MHENSON | Approved | IVRS - Inspection :* |
| 12/13/2010 | EXCAVATION/LAYOUT REBAR & ZON | MHENSON | Approved | IVRS - Inspection :* |
| 12/13/2010 | MECHANICAL - INTERMEDIATE | MRAMBER | Approved | IVRS - Inspection :* |
| 12/13/2010 | NPPO - FINAL | DROBERTS | Approved | |
| 12/13/2010 | LANDSCAPE - FINAL | DROBERTS | Approved | |
| 12/14/2010 | ELECTRIC - PROGRESS | RHOLLAND | Approved | IVRS - Inspection :* BAKERY: 1) VERIFY INSTRUCTIONS FOR FREEZER DOOR 2) NEED WATER HEATER INSTALLED 3) FIX DOOR HARDWARE PANELS L4D3-SEC 1, 2 AND 3 4) RECEIVED MONEY ORDER FOR $165.00 |
| 12/14/2010 | PLUMBING - FINAL | RLEDONNE | Approved | IVRS - Inspection :* |
| 12/16/2010 | BUILDING - FINAL | MHENSON | Approved | IVRS - Inspection :* 1) FIRE CAULKING OUT EXIT CORRIDORS NEED TO BE CHECKED |
| 12/16/2010 | SHEET ROCK NAILING | MHENSON | Approved | IVRS - Inspection :* |
| 12/16/2010 | FRAMING | MHENSON | Approved | IVRS - Inspection :* |
| 12/16/2010 | REINFORCED MASONRY PRE-GROUT | MHENSON | Approved | IVRS - Inspection :* |
| 10/20/2011 | MECHANICAL - PROGRESS | MRAMBER | Approved | IVRS - Inspection :* |
| 11/10/2011 | RIGHT OF WAY - FINAL | MCASTRO | Approved | |
| 12/15/2011 | FIRE - FINAL | WMOTTO | Approved | |
| 12/16/2011 | ELECTRIC - FINAL | RHOLLAND | Approved | IVRS - Inspection :* 1) MET WITH JOHN WENT OVER ITEM TO BE DONE 2) REVIEW AND REPAIR |
| 12/20/2011 | PLUMBING - ABOVE CEILING | RMYERS | Approved | IVRS - Inspection :* |
| 12/20/2011 | PLUMBING - INTERMEDIATE | RMYERS | Approved | IVRS - Inspection :* |
| 12/20/2011 | PLUMBING - PRE SLAB | RMYERS | Approved | IVRS - Inspection :* |
| 12/20/2011 | PLUMBING - PROGRESS | RMYERS | Approved | IVRS - Inspection :* |
| 12/20/2011 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | IVRS - Inspection :* |
| 12/21/2011 | MECHANICAL - HOODS | MRAMBER | Approved | IVRS - Inspection :* |
| 12/21/2011 | MECHANICAL - UNDERGROUND | MRAMBER | Approved | IVRS - Inspection :* |
| 12/22/2011 | SIGN - FINAL | RLEDONNE | Approved | NA TO THIS ACTIVITY. |
| 12/22/2011 | ENGINEERING - FINAL | RLEDONNE | Approved | TALK WITH JOHN TO COMPLET AP PLANS FOR ENGNEERING FINAL. |
| 01/19/2012 | FIRE - ALARM FINAL | CSCHULTZ | Approved | No alarm work done |
| 01/23/2012 | ELECTRIC - UFER | RHOLLAND | Approved | IVRS - Inspection :* |
| 03/05/2012 | HEALTH DEPT - FINAL 724-7908 | AKincaid | Approved |