Permit: T08BU02059
Permit Details
Apply Date:
11/24/2008
Applicant:
STEVE MELTON
Description:
GRADING: 1118 CUT 2335 FILL
Contractors:
- HUNTER CONTRACTING CO
Permit Reviews
Permit Number - T08BU02059
Permit Status: Issued
Permit Description: GRADING: 1118 CUT 2335 FILL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/24/2010 | RESUBMITTAL - GRADING | 01/05/2011 | COMPLETED |
| 02/25/2009 | RESUBMITTAL - GRADING ALL | 04/07/2009 | COMPLETED |
| 06/28/2012 | REVISION - GRADING | 10/04/2013 | COMPLETED |
| 10/16/2009 | RESUBMITTAL - GRADING ALL | 11/16/2009 | COMPLETED |
| 11/24/2008 | PLANS OK TO SUBMIT - GRADING | 12/05/2008 | COMPLETED |
| 12/05/2008 | GRADING | 01/12/2009 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T08BU02059
Permit Status: Issued
Permit Description: GRADING: 1118 CUT 2335 FILL
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 11/24/2008 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Issued
Permit Number: T08BU02059
Permit Description: GRADING: 1118 CUT 2335 FILL
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/14/2011 | NPPO PRE PERMIT INSPECTION | DROBERTS | Approved | MET WITH THE CONTRACTOR AND DISCUSSED WHAT WILL BE REQUIRED TO SATISFY THE NPPO PORTION OF THIS PERMIT. THE SITE HAS BEEN MODIFIED BY THE CONTRACTOR AND WILL BE NOTED ON REVISED DRAWINGS TO REFLECT THE ALIGNMENT CHANGES THAT HAVE BEEN MADE. |
| 01/17/2011 | ENGINEERING PRE-CONSTRUCTION | DROBERTS | Approved | PRECON PAPERWORK HAS BEEN DELIVERED TO THE CONTRACTOR AND WILL BE PICKED UP ONCE ALL OF IT HAS BEEN COMPLETED FOR ALL THE SUB-CONTRACTORS. |
| 01/31/2011 | STORMWATER INSTALL OF CONTROLS | DROBERTS | Approved | MET OUT ONSITE WITH THE CONTRACTOR, THEY ARE CURRENTLY WORKING ON THE COMFORT STATION FOOTER LAYOUT AND ON THE PIPE INSTALLATIONS EAST OF KOLB ROAD. ALSO A CREW FROM AAA LANDSCAPING IS WORKING ON THE REMOVAL OF VEGETATION ON THE EAST HALF OF THE SITE, THIS WORK SHALL CONTINUE THROUGH THE WEEK. THEY ARE INSTALLING THE STORMWATER CONTROLS AS THEY CLEAR THE AREAS, AND ARE ALSO PLACING BLOW RIBBON ALONG THE PATHWAYS TO ENSURE THAT THE MACHINERY STAYS WITHIN THE DESIGNATED AREAS. THESE AREAS WILL BE CHECKED NEXT WEEK ONCE THEY HAVE BEEN COMPL;ETED. |
| 06/21/2011 | GRADING - INTERMEDIATE | DROBERTS | Approved | |
| 06/21/2011 | GRADING - CHECK FOR ACTIVITY | DROBERTS | Approved | |
| 06/21/2011 | GRADING - REBAR | DROBERTS | Approved | |
| 12/05/2011 | GRADING - FINAL | DROBERTS | Approved | DROVE THE SITE AND THE FOLLOWING ITEMS NEED TO BE ADDRESSED: 1) PROVIDE APPROVED AS-BUILT DRAWINGS FOR ALL CHANGES THAT HAVE BEEN MADE TO THIS SITE. 2) PROVIDE A LETTER OF CERTIFICATION STATING THAT THE SITE HAS BEEN COMPLETED PER THE APPROVED DRAWINGS FOR THIS SITE. 3) PROVIDE ALL OTHER CERTIFICATION LETTERS TO ELIZABETH LEIBOLD AND NOTED DURING THE REVIEW PROCESS IN REGARDS TO THE APPROVAL FROM ALL PARTIES CONCERNED IN OWNERSHIP OF CURRENT PROPERTIES. RESHEDULE THIS INSPECTION ONCE ALL OF THE APPROVED DOCUMENTS HAVE BEEN PROVIDED AND ACCEPTED BY THIS DEPARTMENT. |
| 12/05/2011 | LANDSCAPE INSPECTION | DROBERTS | Approved | |
| 12/05/2011 | STORMWATER FOLLOW-UP INSP | DROBERTS | Approved |