Inspection Status: Approved
Inspection History: LANDSCAPE INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 12/05/2011 |
LANDSCAPE INSPECTION |
|
Approved |
|
| 12/02/2011 |
LANDSCAPE INSPECTION |
|
Continued |
SEE ABOVE NOTED COMMENTS FOR 12/01/2011, SITE WILL BE RECHECKED ON 12/05/2011. |
| 12/01/2011 |
LANDSCAPE INSPECTION |
|
Continued |
DROVE TO THE SITE TOO SEE IF IT COULD BE INSPECTED AT THIS TIME FOR THE FINAL INSPECTIONS. DUE TO THE RAINS LAST NIGHT AND THIS MORNING THE SITE IS TOO WET TO DRIVE FOR THE FINAL INSPECTION. THIS SITE WILL BE RECHECKED ON 12/02/2011 TOO SEE IF IT HAS DRIED ENOUGH TO INSPECT THE SITE. |
| 06/21/2011 |
LANDSCAPE INSPECTION |
|
Partial Approval |
FINAL IS NOT TO BE GIVEN ON THIS SITE UNTIL THE FOLLOWING ITEMS HAVE BEEN COMPLETED: 1) COMPLETE THE INSTALLATION OF ALL PLANTS AND LANDSCAPE MATERIALS AS SHOWN ON THE APPROVED PLANS. EMPTY HOLES WITH IRRIGATION TUBING HAS BEEN NOTED ON THIS SITE DURING TODAYS INSPECTION. 2) PROVIDE A LANDSCAPE MONITORING REPORT NOTING WHAT HAS BEEN DONE WITH ALL OF THE PLANTS THAT WERE TO BE PRESERVED IN PLACE OR TRANSPLANTED ON SITE. S0ME OF THIS WORK WAS NOT DONE PER THE APPROVED PLANS BUT WAS CHANGED WITH THE FULL AGREEANCE/RECOMMENDATIONS FROM THE LANDSCAPE ARCHITECT AND THE OWNER. I WILL ACCEPT A STAMPED AND SEALED LETTER FROM THE ACHITECTURE NOTING THAT CHANGES WERE MADE TO PRESERVE THE LIFE OF PLANTS THAT WERE TO BE MOVED. 3) REPLANT ALL PLANTS THAT HAVE EITHER BEEN KNOCKED OVER OR THAT HAVE DIED IN THE FIELD SINCE THE INITIAL PLANTING. 4) REMOVE ALL EXCESS MATERIAL FROM THE SITE THAT IS NOT TO BE UTILIZED IN THE FUTURE. THIS WILL INCLUDE ALL EXCESS TIMBERS, PLANTS, STOCKPILE OF D.G., ALL SPOIL PILES, AND ALL REMAINING TRASH AND DEBRIS. SOME OF THE ORIGINAL PILES OF DESTROYED PLANT MATERIAL HAS BEEN SPREAD IN AREAS THROUGHOUT THE SITE. EXCESS LARGE PLANT MATERIAL SHOULD BE REMOVED FROM THESE AREAS UNLESS THE OWNER HAS SPECIFIED THAT THEY REMAIN ON THIS SITE AND ALLOWED TO DECOMPOSE. 5) COMPLETE THE PLACEMENT OF MATERIALS ON THIS SITE AS NOTED ON THE APPROVED PLANS. THIS WILL INCLUDED COMPLETING ALL STRUCTURAL BACKFILL THAT IS NOT COMPLETE AT THIS TIME. 6) ALL DISTURBED AREAS NEEDS TO BE RESEEDED PRIOPR TO THE FINAL ACCEPTANCE OF THIS SITE. CONTACT THE LANDSCAPE ARCHITECT FOR THIS SITE, OR JOSEPH LINVILLE AT (520) 837-4947 FOR THE ALLOWABLE MIX DESIGN FOR THIS AREA. 7) PROVIDE APPROVED AS-BUILT DRAWINGS FOR THIS SITE TO 201 N. STONE SO THAT THEY CAN BE PLACED INTO THE RECORDS NOTING ALL CHANGES THAT HAVE BEEN MADE DURING CONSTRUCTION. |
| 06/13/2011 |
LANDSCAPE INSPECTION |
|
Continued |
LOOKED AT SOME OF THE PLANTING AREAS THAT HAVE BEEN COMPLETED AT THIS TIME, I WILL SPEND SOME TIME THIS WEEK AND START THE INSPECTIONS FOR THE LANDSCAPE FINAL. |
| 05/11/2011 |
LANDSCAPE INSPECTION |
|
Continued |
AAA IS WORKING ON HEAVY PLANT PLACEMENT BETWEEN KOLB ROAD AND THE WASH. THIS AREA WILL BE CHECKED IN THE NEXT TWO WEEKS FOR THE OFFICIAL PLANT COUNT IN THE COMPLETED AREAS. |
| 03/09/2011 |
LANDSCAPE INSPECTION |
|
Continued |
AAA LANDSCAPING IS WORKING ON INSTALLATION OF THE IRRIGATION LINES. SOME OF THE MAINLINES HAVE BEEN PREVIOUSLY PLACED, CURRENTLY THEY ARE INSTALLING SOME OF THE FEEDER LINES. |
| 02/10/2011 |
LANDSCAPE INSPECTION |
|
Continued |
COntractor requested a LS inspection as work begun, had questions for the water dept about connection to the main, I told him he needed to speak to the water dept. and gave him a name to contact. |