Permit: T07CM00069
Permit Details
Apply Date:
01/04/2007
Applicant:
INTERTECH
Description:
NEW BANKING FACILITY
Architects:
- SWAN WAYNE E
Contractors:
- WOODBURN CONSTRUCTION CO
Permit Reviews
Permit Number - T07CM00069
Permit Status: C of o
Permit Description: NEW BANKING FACILITY
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/04/2007 | PLANS OK TO SUBMIT - 3RD PARTY | 01/05/2007 | COMPLETED |
01/05/2007 | 3RD PARTY REVIEW-COMMERCIAL | 02/16/2007 | COMPLETED |
02/16/2007 | POST 3RD PARTY REVIEW | 06/20/2007 | COMPLETED |
04/11/2007 | SITE | 06/20/2007 | COMPLETED |
07/19/2007 | RESUBMITTAL - SITE ALL | 08/21/2007 | COMPLETED |
07/19/2007 | RESUBMITTAL | 08/21/2007 | COMPLETED |
08/29/2007 | RESUBMITTAL | 09/14/2007 | COMPLETED |
08/29/2007 | RESUBMITTAL - SITE ALL | 09/13/2007 | COMPLETED |
09/11/2007 | RESUBMITTAL - SITE | 09/14/2007 | COMPLETED |
09/14/2007 | RESUBMITTAL | 10/29/2007 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T07CM00069
Permit Status: C of o
Permit Description: NEW BANKING FACILITY
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
01/04/2007 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T07CM00069
Permit Description: NEW BANKING FACILITY
Total Completed Inspections - 35
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/14/2007 | PLUMBING - ROUGH, SOIL | BBENEDON | Approved | |
11/14/2007 | ELECTRIC - UFER | RJIROUDE | Approved | IVRS - Inspection :* 1/0 COPPER MORE THAN 20' IN FOOTING |
11/14/2007 | PLUMBING - PRE SLAB | BBENEDON | Approved | IVRS - Inspection :* USE TAPE TO HOLD WRAPS IN PLACE WRAPS MUST BE VISIBLE AFTER CONCRETE |
11/14/2007 | EXCAVATION/LAYOUT REBAR & ZON | GDABBS | Approved | IVRS - Inspection :* 1. 7 PIER FOOTINGS AS PER DETAIL S1.0/102 & 102A 4 ON SOUTH & 3 ON NORTH 2. 100 L.F FOOTING FOR WEST SCREEN WALL |
11/14/2007 | BUILDING PRE-SLAB | GDABBS | Approved | IVRS - Inspection :* |
11/29/2007 | STEM WALL/RETAINING WALL | GDABBS | Approved | IVRS - Inspection :* |
12/06/2007 | REINFORCED MASONRY PRE-GROUT | GDABBS | Approved | IVRS - Inspection :* DUMPSTER ENCLOSURE AND 40" SITE WALL AT N/W CORNER OF SITE |
12/10/2007 | FRAMING | GDABBS | Approved | IVRS - Inspection :* |
12/10/2007 | ROOF NAILING | GDABBS | Approved | IVRS - Inspection :* |
12/12/2007 | EXT METAL CLIPS/EXT SHEATHING | GDABBS | Approved | IVRS - Inspection :* |
12/13/2007 | PLUMBING - INTERMEDIATE | RRICH | Approved | IVRS - Inspection :* DWV WATER TEST THRU ROOF OK WATER PIPING THRU BUILDING FROM STUB TO EXTERIOR OK 1. SHALL INSPECT CORRECT CLOSET FLANGE CORRECTLY |
12/18/2007 | ELECTRIC - UNDERGROUND | RJIROUDE | Approved | IVRS - Inspection :* 1. OK WALLS 2. OK 2 1/2" PVC FROM TEP PULL BOX TO SES 3. OK 3/4" PVC FOR WALL LIGHT 4. OK 3/4" PVC FOR BALLARD LIGHT FROM BUILDING TO 1ST LIGHT 5. PROVIDE LETTER FROM ENGINEERING APPROVING CHANGE IN PVC SIZE 6. INSTALL WARNING RIBBON ABOVE SERVICE CONDUCTORS PER NEC 300.5 |
12/18/2007 | ELECTRIC - INTERMEDIATE | RJIROUDE | Approved | IVRS - Inspection :* |
12/19/2007 | STUCCO MESH | GDABBS | Approved | IVRS - Inspection :* |
12/20/2007 | SHEET ROCK NAILING | GDABBS | Approved | IVRS - Inspection :* |
01/18/2008 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* - FLEX DUCTS NOT INSTALLED PER DETAILS ON PLANS - USE ONLY UL LISTED DUCT TAPE AS PER IMC - PROVIDE OVERFLOW SENSORS AS PER PLAN - PROVIDE BUSHINGS AROUND REFER LINE CONNECTIONS TO FAN COIL - READJUST SUPPORTS ON FC-1 BLOCKING SERVICE PANEL - SECURE SUPPORTS TO STRUCTURE - FINISH INSULATING REFER LINES - T-STATS TO BE ADA HEIGHT 48" MAX - REVISE PLANS SHOWING PROPER LOCATION OF CONDENSORS |
01/24/2008 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* OK FOR CEILING TILES |
01/31/2008 | PLUMBING - YARD WTR LINE/TEST | RRICH | Approved | IVRS - Inspection :* |
02/08/2008 | BUILDING ABOVE CEILING | GDABBS | Approved | IVRS - Inspection :* |
02/13/2008 | MECHANICAL - FINAL | MRAMBER | Approved | IVRS - Inspection :* |
02/20/2008 | SIGN - FINAL | JSONKIN | Approved | |
02/21/2008 | U VALUE FOR WINDOW | JBURGE | Approved | IVRS - Inspection :* TEMPERED GLASS SYSTEM |
02/21/2008 | PLUMBING - ABOVE CEILING | RRICH | Approved | IVRS - Inspection :* |
02/22/2008 | RIGHT OF WAY - FINAL | PWHIDDON | Approved | PER EMAIL |
02/26/2008 | PLUMBING - FINAL | RRICH | Approved | IVRS - Inspection :* RECEIVED CLEAN BACTERIA REPORT FOR POTABLE WATER SYSTEM |
05/19/2008 | ELECTRIC - FINAL | RJIROUDE | Approved | IVRS - Inspection :* |
05/19/2008 | OUTDOOR LIGHTING FINAL | RJIROUDE | Approved | IVRS - Inspection :* |
05/19/2008 | ELECTRIC - OUTDOOR LIGHTING | RJIROUDE | Approved | IVRS - Inspection :* |
05/19/2008 | ELECTRIC - ABOVE CEILING | RJIROUDE | Approved | IVRS - Inspection :* |
05/19/2008 | ELECTRIC - CABLE DROP | RJIROUDE | Approved | IVRS - Inspection :* |
05/19/2008 | FIRE - FINAL | LTHOMAS | Approved | |
08/14/2008 | LANDSCAPE - FINAL | ACONNOR | Approved | |
08/28/2008 | ENGINEERING - FINAL | NKALAHAR | Approved | PER N KALAHAR - SITE NOW MATCHES STAMPED PLAN PROVIDED BY PATRICIA GEHLEN |
09/02/2008 | PERMIT FINALED | NKALAHAR | Approved | |
09/16/2008 | BUILDING - FINAL | LHANLY | Approved |