Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/16/2008 | PLUMBING - ROUGH, SOIL | Approved | ||
| 09/16/2008 | PLUMBING - ROUGH, SOIL | Approved | per PL FINAL | |
| 01/23/2008 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. VENT FITTING TO BE INSTALLED TO DRAIN BACK TO DIRECTION OF SEWER FLOW 2. NO THREADED ABS FITTING SHALL BE IN AN UNACCESSIBLE LOCATION. 3. VENT TO BE EQUAL TO CROSS-SECTIONAL AREA OF REQUIRED BUILDING SEWER 4. VENT FITTING BELOW FLOOD LEVEL RIM TO BE LONG RADIUS |
|
| 01/18/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | - FROM SEWER MAIN 4" BACK TO EXISTING BUILDING - SEWER CONNECTION WATER TEST OK - SHALL SEE FINAL CONNECTION AND VENT FOR BACKWATER VALVE |
|
| 01/10/2008 | PLUMBING - ROUGH, SOIL | Partial Approval | INSTALLATION OF BACKWATER VALVE PER PLAN WITH WATER TEST TO 2' PAST IN LINE CLEANOUT OK NOTE: PLEASE SEE CHAPTER 9 2003 UPC FOR SECTION 904.1 FOR REQUIREMENT FOR VENTING OF SANITARY SYSTEMS WITH BACKWATER VALVES. |
|
| 11/14/2007 | PLUMBING - ROUGH, SOIL | Approved | ||
| 11/07/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 4" FROM 2' BUILDING EXTERIOR WEST SIDE THRU BUILDING PER PLAN 1. SHALL SEE REDLINE & CONTINUATION OF SEWER THRU BACKWATER VALVE CLEANOUTS TO EXISTING. |