| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/06/2008 | SITE | 04/17/2008 | COMPLETED |
| 04/17/2008 | REVISION - SITE | 04/17/2008 | COMPLETED |
| 04/17/2008 | OTHER | 04/17/2008 | COMPLETED |
| 05/01/2008 | REVISION - - 1ST | 05/01/2008 | ACTIVE |
| 05/11/2006 | COMMERCIAL TI | 05/15/2006 | COMPLETED |
| 05/15/2006 | 3RD PARTY REVIEW-COMMERCIAL TI | 06/16/2006 | COMPLETED |
| 06/16/2006 | POST 3RD PARTY REVIEW | 11/15/2006 | COMPLETED |
| 08/29/2006 | OTHER | 08/29/2006 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T06CM02811
Permit Status: C of o
Permit Description: S P MARKET
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/11/2006 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T06CM02811
Permit Description: S P MARKET
Total Completed Inspections - 30
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/22/2006 | PLUMBING - GAS PRESSURE TEST | RLEDONNE | Approved | IVRS - Inspection :* |
| 12/13/2006 | FRAMING | AALEGRIA | Approved | IVRS - Inspection :* IN COMPLIANCE WITH SPECIFIC DETAIL ON SHEET S.1 NEW ROOF JOISTS SUPPORTS 2X10 WITH 16d @ 12" O.C STAGGER TOP AND BOTTOM ON 3 LOCATIONS. |
| 12/13/2006 | PLUMBING - INTERMEDIATE | RLEDONNE | Approved | IVRS - Inspection :* 1. ROUGH SOIL OUTSIDE TO GREASE TRAP TEST OK 2. ADD ROUGH SOIL TO ACTIVITY CARD |
| 12/13/2006 | PLUMBING - GAS PRESS TEST FNL | RLEDONNE | Approved | IVRS - Inspection :* |
| 12/13/2006 | PLUMBING - ABOVE CEILING | RLEDONNE | Approved | IVRS - Inspection :* |
| 12/18/2006 | PLUMBING - FINAL | RLEDONNE | Approved | IVRS - Inspection :* 1. PROVIDE SUPPORT FOR WATER HEATER EXPANSION TANK 2. REMOVE FLEX FOR T&P PIPING 3. COMPLETE ALL WORK BEFORE CALLING FOR FINAL 4. COMPLETE VENT PIPING ON EAST SIDE OF BUILDING 5. REPAIR LEAK AT BACKFLOW |
| 01/11/2007 | ROOF NAILING | AALEGRIA | Approved | IVRS - Inspection :* |
| 02/13/2007 | SHEET ROCK NAILING | AALEGRIA | Approved | IVRS - Inspection :* |
| 04/18/2007 | PLUMBING - ROUGH, SOIL | RLEDONNE | Approved | |
| 04/18/2007 | BUILDING ABOVE CEILING | JBURGE | Approved | IVRS - Inspection :* EXISTING CEILING IN PLACE -- NO MODIFICATIONS WERE MADE |
| 10/24/2007 | ELECTRIC - FINAL | DSANTACR | Approved | IVRS - Inspection :* |
| 10/24/2007 | ELECTRIC - RECONNECT | DSANTACR | Approved | IVRS - Inspection :* |
| 10/24/2007 | ELECTRIC - CONSTRUCTION POWER | DSANTACR | Approved | IVRS - Inspection :* |
| 10/24/2007 | ELECTRIC - ABOVE CEILING | DSANTACR | Approved | IVRS - Inspection :* |
| 10/24/2007 | ELECTRIC - INTERMEDIATE | DSANTACR | Approved | IVRS - Inspection :* |
| 10/29/2007 | MECHANICAL - ABOVE CEILING | MRAMBER | Approved | IVRS - Inspection :* |
| 10/29/2007 | MECHANICAL - INTERMEDIATE | MRAMBER | Approved | IVRS - Inspection :* |
| 10/31/2007 | FIRE - FINAL | CSCHULTZ | Approved | 1. NEED ADDRESS NUMBERS ON BUILDING 2. NEED TO INSTALL FIRE DEPARTMENT KEY BOX SYSTEM FOR ROLL DOWN DOORS ON FRONT OF BUILDING 3. REAR EXIT DOOR SHALL HAVE THUMB STYLE DEAD BOLT LOCK AND REMOVE SLIDE BOLT LOCKS FROM DOOR 4. NEED TO COVER BREAKER HOLES IN ELECTRICAL PANEL WITH BLANKS. 5. NEED TO HAVE A ACCEPTANCE TEST DONE ON EXTINGUISHER SYSTEM ON HOOD SYSTEM. NEED TO GET APPROVED PLANS AND PERMIT. |
| 11/09/2007 | MECHANICAL - HOODS | MRAMBER | Approved | IVRS - Inspection :* |
| 12/04/2007 | MECHANICAL - HOOD SYSTEMS | MRAMBER | Approved | IVRS - Inspection :* - PROVIDE BLOCKING FOR PVC CONDENSATE PIPING NOT TO EXCEED 4 FEET - PAINT ALL PVC CONDENSATE PIPING WITH LATEX PAINT THAT IS EXPOSED TO SUNLIGHT - CONDENSING UNITS NOT PROPERLY FUSED - PROVIDE APPROVED COVER AT REMOVE CONDENSING UNIT - SEAL ROOF JACK AT EVAP. COOLER - PROVIDE OUTSIDE AIR PER PLANS - PROVIDE PROPER FLUE PIPE LENGTH ABOVE PARAPET WALL PER 503.5.4 IFGC - PROVIDE BALANCE ON HOOD PER PLANS |
| 12/04/2007 | MECHANICAL - FINAL | MRAMBER | Approved | IVRS - Inspection : See detailed listing on site.| 999* - PROVIDE BLOCKING FOR PVC CONDENSATE PIPING NOT TO EXCEED 4 FEET - PAINT ALL PVC CONDENSATE PIPING WITH LATEX PAINT THAT IS EXPOSED TO SUNLIGHT - CONDENSING UNITS NOT PROPERLY FUSED - PROVIDE APPROVED COVER AT REMOVE CONDENSING UNIT - SEAL ROOF JACK AT EVAP. COOLER - PROVIDE OUTSIDE AIR PER PLANS - PROVIDE PROPER FLUE PIPE LENGTH ABOVE PARAPET WALL PER 503.5.4 IFGC - PROVIDE BALANCE ON HOOD PER PLANS |
| 12/04/2007 | NPPO - FINAL | ACONNOR | Approved | N/A |
| 12/04/2007 | LANDSCAPE - FINAL | ACONNOR | Approved | N/A |
| 03/03/2008 | FIRE - KITCHEN EXH HOOD FINAL | LLAKEY | Approved | |
| 04/21/2008 | RIGHT OF WAY - FINAL | LLOPEZ | Approved | PER EMAIL |
| 04/28/2008 | ENGINEERING - FINAL | MAVERY | Approved | Contractro installed handrail. |
| 04/28/2008 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection :* |
| 06/12/2008 | BUILDING - FINAL | MHENSON | Approved | IVRS - Inspection :* |
| 07/17/2008 | PERMIT FINALED | LJACKSON | Approved | |