Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/24/2007 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 06/07/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. GFI RECEPT ON ROOF BY COOLER MUST BE GFI PROTECTED. 2. CANNOT LAY J-BOXES ON BACK FACING UP ON ROOF. 3. DO NOT USE THE MIDWEST COOLER BOX AS A FEED THRU TO FEED EXHAUST FAN. 4. CONDUIT SUPPORTS ON ROOF WITH DRYWALL SCREW INTO ROOF THRU UNISTRUT NOT SUFFICIENT. 5. HAVE 10' LADDER ON SITE FOR CEILING INSPECTION 6. SEE NOTES LAST INSP. |
|
| 04/18/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SUPPORT CONDUITS, MC CABLES PER CODE 2. LABEL PANEL DIRECTORYS 3. SUPPORT FLOOR BOXES 4. SEAL CABLES (MC) ENTERING WALK IN COOLER 5. PROVIDE LADDER FOR ROOF NEXT INSPECTION |