Permit: T06CM02271
Permit Details
Apply Date:
04/20/2006
Applicant:
PHILIP VENEZIANO
Description:
NEW: RETAIL BLDG
Architects:
- VENEZIANO, PHILIP JOHN
Contractors:
- RABB S CONSTRUCITON L L C
Permit Reviews
Permit Number - T06CM02271
Permit Status: C of o
Permit Description: NEW: RETAIL BLDG
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/09/2007 | RESUBMITTAL - SITE ALL | 05/08/2007 | COMPLETED |
| 03/14/2007 | POST 3RD PARTY REVIEW | 05/08/2007 | COMPLETED |
| 04/20/2006 | PLANS OK TO SUBMIT - 3RD PARTY | 04/20/2006 | COMPLETED |
| 04/20/2006 | PLANS OK TO SUBMIT - SITE | 04/20/2006 | COMPLETED |
| 04/20/2006 | SITE | 06/23/2006 | COMPLETED |
| 04/20/2006 | 3RD PARTY REVIEW-COMMERCIAL | 12/26/2006 | COMPLETED |
| 05/10/2007 | RESUBMITTAL - SITE ALL | 07/09/2007 | COMPLETED |
| 05/10/2007 | RESUBMITTAL | 06/11/2007 | COMPLETED |
| 06/11/2007 | RESUBMITTAL | 06/12/2007 | COMPLETED |
| 07/13/2006 | OTHER | 08/30/2006 | COMPLETED |
| 10/29/2007 | 3RD PARTY REVIEW-REVISION/OTHER | 10/31/2007 | COMPLETED |
| 11/07/2006 | RESUBMITTAL - SITE ALL | 12/29/2006 | COMPLETED |
| 12/26/2006 | POST 3RD PARTY REVIEW | 12/29/2006 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T06CM02271
Permit Status: C of o
Permit Description: NEW: RETAIL BLDG
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 04/20/2006 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T06CM02271
Permit Description: NEW: RETAIL BLDG
Total Completed Inspections - 34
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/09/2007 | BUILDING PRE-SLAB | AQUIROZ | Approved | IVRS - Inspection :* |
| 08/09/2007 | EXCAVATION/LAYOUT REBAR & ZON | AQUIROZ | Approved | IVRS - Inspection :* |
| 08/10/2007 | ELECTRIC - UFER | DSANTACR | Approved | IVRS - Inspection :* |
| 09/05/2007 | PLUMBING - YARD WTR LINE/TEST | RLEDONNE | Approved | IVRS - Inspection :* PER REDLINE DRAWING PROVIDE APPROVED SITE PLANS |
| 09/06/2007 | PLUMBING - ROUGH, SOIL | RLEDONNE | Approved | IVRS - Inspection :* PROVIDE 4" CLEANOUT AT BUILDING FOR SITE SEWER 4" |
| 09/06/2007 | SITE - SEWER | RLEDONNE | Approved | IVRS - Inspection :* |
| 10/11/2007 | EXT METAL CLIPS/EXT SHEATHING | LHANLY | Approved | S, E, W OK |
| 11/01/2007 | FRAMING | GDABBS | Approved | IVRS - Inspection :* INSTALL BACKING FOR RESTROOM GRAB BARS |
| 11/01/2007 | ROOF NAILING | GDABBS | Approved | IVRS - Inspection :* VIEWED SHOP DRAWINGS (APPROVED) FOR METAL BLDG. |
| 11/06/2007 | PLUMBING - ABOVE CEILING | RLEDONNE | Approved | IVRS - Inspection :* |
| 11/07/2007 | LANDSCAPE - FINAL | ACONNOR | Approved | On-site questions |
| 11/08/2007 | SHEET ROCK NAILING | LHANLY | Approved | IVRS - Inspection :* |
| 11/27/2007 | RIGHT OF WAY - FINAL | LLOPEZ | Approved | |
| 11/27/2007 | NPPO - FINAL | ACONNOR | Approved | N/A |
| 11/27/2007 | U VALUE FOR WINDOW | MHENSON | Approved | IVRS - Inspection :* |
| 11/28/2007 | MECHANICAL - INTERMEDIATE | MRAMBER | Approved | IVRS - Inspection :* |
| 12/03/2007 | ENGINEERING - FINAL | MAVERY | Approved | Punch List: 1- Provide letter from engineer in regards to chapter XIV, section 14.2 (7). 2- Remove all temp fencing. 3- Remove all SWPPP controls. 4- Install gates on trash enclosure, paint bollards. 5- Complete all grading, stabilize all areas disturbed by construction. Contact inspector (240-9871) in regards to slopes steeper then 2to1. Complete all basin work per the approved drawings. 6- Install all parking lot lighting. 7- Remove trash dumpster. 8- Obtain permit for mini mobile or remove. 9- Remove asphalt ramp southeast corner. 10- Sweep street around project. 11- Clean all construction debris. 12- Install splash pads for roof drains eastside of building. 13- Install water harvesting where needed. 14- Install bike parking. Spoke to Ward site super in regards to punch list. |
| 12/07/2007 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection :*TEMP C/O; MUST FINAL ELEC ON INSTALLED SIGNS T07OT02300 FOR FINAL C/O TO BE ISSUED |
| 12/07/2007 | BUILDING ABOVE CEILING | MHENSON | Approved | IVRS - Inspection :* |
| 12/07/2007 | PLUMBING - INTERMEDIATE | RLEDONNE | Approved | IVRS - Inspection :* |
| 12/07/2007 | PLUMBING - PRE SLAB | RLEDONNE | Approved | IVRS - Inspection :* |
| 12/10/2007 | MECHANICAL - ABOVE CEILING | MRAMBER | Approved | IVRS - Inspection :* |
| 12/19/2007 | ELECTRIC - CABLE DROP | DSANTACR | Approved | IVRS - Inspection :* 1) SUBJECT TO POSTING OF BOND 2) SERVICE OK-GROUNDING OK |
| 12/19/2007 | ELECTRIC - OUTDOOR LIGHTING | DSANTACR | Approved | IVRS - Inspection :* |
| 12/20/2007 | TEP CLEARANCE - AM | JWEATHER | Approved | TEC CLEARED PER D. SANTACRUZ |
| 12/28/2007 | ELECTRIC - INTERMEDIATE | RJIROUDE | Approved | IVRS - Inspection :* OK POWER POLE AT CASH REGISTER |
| 12/28/2007 | ELECTRIC - ABOVE CEILING | RJIROUDE | Approved | IVRS - Inspection :* |
| 01/07/2008 | OUTDOOR LIGHTING FINAL | DSANTACR | Approved | IVRS - Inspection :* |
| 01/07/2008 | ELECTRIC - FINAL | DSANTACR | Approved | IVRS - Inspection :* |
| 01/09/2008 | FIRE - FINAL | DRAMIREZ | Approved | |
| 01/09/2008 | FIRE - FINAL | IVR USER | Approved | IVRS - RI canceled |
| 01/14/2008 | MECHANICAL - FINAL | MRAMBER | Approved | IVRS - Inspection :* |
| 01/14/2008 | PLUMBING - FINAL | RLEDONNE | Approved | IVRS - Inspection :* |
| 01/15/2008 | BUILDING - FINAL | MHENSON | Approved | IVRS - Inspection :* |