Review Status: Completed
Review Details: SITE
Permit Number - T06CM02271
Review Name: SITE
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/21/2006 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 05/02/2006 | ANDREW CONNOR | NPPO | REVIEW | Denied | Submit NPPO plan or Application for Exception per DS 2-15.2.0.C |
| 05/02/2006 | ANDREW CONNOR | LANDSCAPE | REVIEW | Denied | 1. All improvements and site information, such as adjacent rights-of-way and property lines, shown on the site plan will be shown on landscape plan as well. Include the following information on the landscape plan per DS 2-07: 2. Legal description and address of site. 3. Square footage of the site. 4. Show the minimum width and square footage measured from the inside edge of tree planters in the vehicular use area on the landscape and site plans. 5. Materials used to construct plant protection within vehicle use area such as curbs, bollards, or walls. 6. Include grade changes across the site indicated with interval contour lines or by spot elevations, also the percent slope across the site and the direction of the slope of paved areas. 7. If a new development is using an existing screen on an adjacent property to meet screening requirements, a copy of the recorded covenant locating the existing screen(s) on adjacent property is required. 8. Areas of detention/retention, depths of basins, and percentage of side slope, Landscaping is required along retention basin side slopes, bottom and periphery. Plant materials used in basins shall withstand periodic inundation. A minimum of 20 trees per acre must be provided, 33% of tress shall be 24" box or larger. A minimum of 2 shrubs for each tree is required per DS 10.01. Revise landscape plan to include basin(s) treatment. 9. Identify the locations for inert ground cover such as decomposed granite. 10. Trees are to be planted an appropriate distance from refuse dumpster locations and loading spaces so that the tree canopy, at maturity, does not obstruct service. Trees within refuse enclosure area may need to be relocated depending upon the storage placement. 11. Submit NPPO plan or Application for Exception per DS 2-15.2.0.C 12. Additional comments may apply. |
| 05/12/2006 | JASON GREEN | ENGINEERING | REVIEW | Denied | DATE: May 15, 2006 SUBJECT: Retail Store- Site Plan Review TO: Philip Veneriano LOCATION: 155 W Valencia, T14S R13E Sec24, Ward 5 REVIEWERS: Jason Green and Elizabeth Eberbach, P.E. ACTIVITY: T06CM02271 SUMMARY: Engineering Division of Development Services Department has received and reviewed the submitted site plan and Geotechnical Engineering Report. The site plan is not approved at this time. Please address the following comments: DRAINAGE REPORT: 1) DS Sec.10-02.2.1.1: A Drainage Report is required for any site greater than one acre and for any site that is subject to detention requirements. The subject property is located in a balanced basin area the submitted Drainage Report must show that the post developed Q100 discharge is less than the existing Q100 discharge. 5-year threshold retention must be incorporated within all commercial developments larger than 1 acre in size. Please refer to DS Sec.10-02.2.3.1 for Drainage Report content and format requirements. 2) DS Sec. 10-02.14.5.9: The Drainage Report must show a factor of safety of 2 for the dry well within the basin. For detention/retention systems, which utilize a method of subsurface disposal the Drainage Report must show that the basin meet the minimum criteria, items 1-9 in DS Sec.10-02.14.5 and items 1-7 in DS Sec.10-01.3.5.5. If the Drainage Report does not include the dry well then it must be closed off and infiltration rates need to be addressed. 3) DS Sec.2-03.2.4.K: Either provide separately, or show a conceptual grading plan on the Site Plan, with the resubmittal of the Site Plan and 1st submittal of the Drainage Report. The conceptual grading plan is required on this project due to the subsurface disposal system and detention basins with the proximity to building setbacks. A revised Geotechnical Report is required. The soils report needs to discuss suitability and feasibility of the project. Description of existing soil constraints for the site, structural design recommendations, pavement design section, and other typical geotechnical data is needed. The soils report shall provide identification / assessment of any potentially hazardous geotechnical areas, provide proposed recommendations for setbacks from building to drainage areas include minimum distance from foundations to drainage swales, and provide infiltration test results. The geotechnical report shall specifically address all criteria listed in this section. See last sentence of this section for items 6 (c) & (d) regarding hydro-collapsing soils and 30-foot test boring for basin design. Recommendations need to be incorporated into the conceptual grading plan, Site Plan, and Drainage Report. SITE PLAN COMMENTS: 4) DS Sec.2-02.2.1.A.2: Provide the property description (legal description, Subdivision Plat Map with Book and Page) on the project location map located on Sheet G1. 5) DS Sec.2-02.2.1.A.4: Identify conditions within the square mile area shown on the project location map located on Sheet G1, such as subdivisions, major streets, and major watercourses. Reference recorded subdivision plats by book and page numbers. 6) DS Sec.2-02.2.1.A.5: Provide the basis of bearing used for the lot dimensions and bearings. 7) DS Sec.2-02.2.1.A.10: Show existing and future sight visibility triangles on plan view. Refer to DS Sec3-01.5.1 for sight visibility triangle procedures and criteria. Signs, landscape and walls will not be approved within the future right-of-way. Provide a note on the site plan to state no structures and vegetation is allowed within 30" to 72" in height and will not be placed within the sight visibility triangles. Revise the Landscape Plan to reflect the sight visibility triangles. 8) DS Sec.2-01.2.1.A.12: Provide vehicular, bicycle, pedestrian, and handicapped circulation, clearly identified on the site plan. Refer to DS Sec.3-01.3.3 for pedestrian circulation paths and DS Sec.3-05.2.2 for Vehicular Use Are design and circulation. Specifically a continuous pedestrian circulation path must connect all public access areas of the development and the circulation path located in any adjacent street. For the vehicular use area provide a back-up spur at the end of the row of parking with a minimum of 3 feet in depth, a 3-foot radii, and a wheel barrier to prevent encroachment onto any unsurfaced area. 9) DS Sec.2-01.2.1.A.14: Provide fully dimensioned loading space(s) and maneuvering area(s) on site plan. 10) DS Sec.2-01.2.1.A.17: Provide estimated cut and fill quantities on site plan for grading plan purposes. 11) DS.2-01.2.1.A.19: Provide dimensioned right-of-ways, including Major Streets and Routes Plan right-of-way for Valencia Road. 12) DS Sec.2-02.2.1.A.20: Provide recording information for the existing right-of-ways for Valencia Road and Missiondale Road. 13) DS Sec.2-01.2.1.A.21: Provide dimensions from the street monument lines to the existing and proposed curbs, sidewalks, driveways and utility lines. 14) DS Sec.2-01.2.1.A.23: Provide existing topographic contours at intervals not exceeding two (2) feet and/or spot elevations as pertinent and Bench Mark based on City of Tucson Datum, including City Field Book and page number. 15) DS Sec.2-02.2.1.A.32: Provide dimensions for refuse container, show or label gates or doors for trash enclosures. The enclosure must have a minimum inside clear dimension of 10 feet by 10 feet between steel pipes that are required between the container and the enclosure's rear and sidewall. Refer to DS Sec.6-01.4.2 for specifications and requirements on access, placement of containers, bin enclosure and construction. Show maneuverability for refuse vehicles in plan view. 16) DS Sec.2-01.2.2.A.1: Provide the gross and net lot area on the site plan. 17) DS Sec.2-01.2.2.A.4: Provide bicycle-parking spaces showing dimensions and details in plan view. 18) DS 10-02.0, Section 14.3.2: Provide a note on the site plan stating that, (a) the owner or owners shall be solely responsible for operation, maintenance, and liability for drainage structures and detention basins; (b) that the owner or owners shall have an Arizona Registered Professional Civil Engineer prepare a certified inspection report for the drainage and detention/retention facilities at lease once each year, and that these regular inspection reports will be on file with the owner for review by City staff, upon written request; (c) that City staff may periodically inspect the drainage and retention/detention facilities to verify that scheduled and unscheduled maintenance activities are being performed adequately; and (d) that the owner or owners agree to reimburse the City for any and all costs associated with the maintaining of the drainage and detention/retention facilities, should the City find the owner or owners deficient in their obligation to adequately operate and maintain their facilities." 19) DS Sec.2-02.2.1.A.15: Provide on the site plan all information associated with the drainage report. The following information must be indicated on the site plan: a) show the areas of detention including the 100-year floodplain and ponding limits with water surface elevations; b) indicate the proposed method of collecting and containing flow from onsite drainage into the proposed detention basin by providing a detail for the PAAL; c) provide a detail for the location and type of drainage structure, label and dimension any proposed scupper that is used for the detention basin inlet at the pedestrian sidewalk. Proposed scuppers under the sidewalk will be designed and constructed to convey the 10-year flood flow. Provide a Drainage Report showing scupper calculations that demonstrate that the 10-year flood flow is contained under the sidewalk; d) indicate proposed ground elevations at different points on the lot, both onsite and offsite, to provide reference to future site drainage. Specifically along the PAAL and any scupper location at the basin; e) provide the location for any off-site runoff acceptance points stating that overflow is to continue through the parking area and/or onsite runoff discharge points such as roof drainage. GEOTECHNICAL REPORT: 20) DS Sec.10-02.14.5: A revised Geotechnical Report needs to specifically address each items, 1-9 in the Stormwater-Infiltration Systems Section to insure that all of the minimum criteria are met for this type of subsurface disposal system. 21) DS Sec.10-01.III.3.5.1.3.a, 10-02.14.2.6: The revised geotechnical evaluation needs to be submitted for review, addressing the following: a) Soils report should provide conformance with DS section 10-02.14.2.6 regarding 30-foot boring for basin, and provide discussion of potential for hydro-collapsible soils and any recommendation for setbacks from building to basin. b) The soils report shall provide identification / assessment of any potentially hazardous geotechnical areas, and state any geotechnical recommendations and whether there are special provisions for the soil preparation for this development. c) Provide slope stability recommendations for any proposed constructed slopes. GRADING PLAN: 22) DS Sec.11-01.2.1: A grading permit will be required for this project. Submit a copy of the Grading Plan with the grading permit application. A grading permit may not be issued prior to site plan approval. Subsequent Grading Plan comments may be necessary, depending upon the nature and extent of revisions that occur to the plans 23) Please ensure the grading plan is consistent with the Site Plan and Drainage Report. Grading standards may be accessed at: http://www.ci.tucson.az.us/dsd/DevStandsTOC.pdf 24) Provide a general grading note-specifying conformance with City of Tucson Development Standard 11-01.0 (excavation and grading requirements). 25) DS Sec.10-01.5.2.6: Be advised that the Grading Plan must accurately reflect the proposed detention/retention basin design and dimensions as called out in the Drainage Report. Provide these details on the Grading Plan and label the details according to the requirements and dimensions of the Drainage Report. 26) DS Sec.11-01.4.1.C.7: Provide a General Note referencing the Geotechnical Report, provide the name, address, job number, date, and phone numbers of the firms or individuals who prepared the report. State that the grading plan shall comply with recommendations within the report as well as any subsequent geotechnical addenda. GENERAL COMMENTS: Please provide a Drainage Report, a revised Site Plan, a revised Geotechnical Report and a revised Landscape Plan that address the comments provided above. A Grading Plan application needs to be submitted at this time. Include a comprehensive response letter addressing in detail responses to all of the above comments. Further comments may be generated upon resubmittal of the Site Plan, Drainage Report, Geotechnical Report, and Landscape Plan. Please enclose "redlines" with the resubmittal package for reference. For any questions or to schedule a meeting, call me at 791-5550, extension 1189. Jason Green, CFM Senior Engineer Associate Engineering Division Development Services |
| 06/16/2006 | HEATHER THRALL | ZONING | REVIEW | Denied | TO: Development Services Department Plans Coordination Office FROM: Heather Thrall Senior Planner PROJECT: T06CM02271 155 W. Valencia, New Dollar General Retail Store Commercial Site Plan TRANSMITTAL DATE: June 16, 2006 COMMENTS: Please resubmit revised drawings along with redlines and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. This project was reviewed for compliance with the Land Use Code (LUC), Development Standard (DS), American National Standard Institute (ANSI) and International Building Code 2003 (IBC). Specifically, this project was reviewed for compliance with site plan requirements of DS 2-02. 2. For record keeping purposes, please enlarge all typeface to 12 point lettering. 3. Per DS 2-02.2.1.2, please provide a legal description for the property. Staff noted the property is listed as being subject to a lot split in 2005 under Pima County Assessor's records. Please provide any lot split plans that have been approved through the city review process, as required. 4. Please revise the location map to meet standards outlined in DS 2-05 - this list will assist with drawing the location map for the site plan. 5. Per DS 2-02.2.1.6, provide height notation - design grade to top of roof, clarify if any parapet walls are proposed and give their overall height from design grade. The C-1 allows a maximum building height of 30 feet. 6. Per DS 2-02.2.1.7, keep in mind after addressing comment 5, the south building setback, at minimum, must be equal to 1.5 times the height of the exterior building wall, as the adjacent site to the south is zoned R-3. Call out the nearest edge of travel lane on Missiondale. The setback off a developing area street (Missiondale connects to a Major Streets and Routes) is the greater of 21 feet or the height of the structure from the nearest edge of travel lane. Call out the future curb location along Valencia. The north setback for the building is the greater of 21 feet or the height of the structure from the back of the future curb. (Staff acknowledges the north setback distance is not an issue.) Provide actual building setback dimensions for all sides of the buildings, for consistency with records keeping. 7. Per DS 2-02.2.1.8, with regards to parking: A) provide parking bumpers on west side of building to ensure 4' wide pedestrian access between the parking and the building area is not compromised. B) Provide typical detailed drawing example of all parking spaces to a dimension of 8.5 feet wide (minimum) and 18 feet in length (minimum). C) Parking areas must be a minimum of 15.5 deep in length with an additional 2.5 feet of vehicle overhang accommodated for - a total of 18 feet in length. Revise the parking spaces that have a 4 feet deep "interruption" at the north and west side of the site to meet these requirements (parking spaces 44/45 and 21/22). D) Parking space 12 appears to be insufficient in length due to the adjacent dumpster's position conflicting with maneuverability when the dumpster enclosure doors are opened. E) Provide back up spur to standards of 3-05 at the east end of the east parking lot. F) Provide parking calculations for retail use, per LUC 2.3.4. (1:200 ratio) G) Provide wheel stops for handicapped parking spaces to ensure signs are not compromised. H) Provide 7' height notations for post between grade and bottom of handicapped parking sign I) Provide $518.00 fine notation for handicapped parking sign 8. Per DS 2-02.2.1.9, provide bicycle parking per LUC 2.3.4. parking ratios for retail establishments. Be sure to provide typical detail drawings for both the class 1 and class 2 bicycle storage areas - with dimensions. 9. Per DS 2-02.2.1.11, provide width of the PAAL at south side of site near dumpster location. 10. Per DS 2-02.2.1.12 and Per DS 2-08, regarding sidewalks: A) provide pedestrian access from each street to the building. B) Provide clarification if sidewalks are raised from asphalt - with height difference (sidewalks must have physical separation from the asphalt) C) Provide early warning systems (truncated domes) on the handicapped ramps D) Dimension landing adjacent to handicapped ramp, include distance from ramp edge to edge of open door (to building). ANSI access stipulates a 4' clear landing. 11. Per DS 2-02.2.1.13, clarify if any free-standing signage is proposed with dimensions. 12. Per DS 2-02.2.1.14, this use/building size requires 1 loading zone, striped at a dimension of 12x35 feet at minimum. Revise plan to provide loading zone. 13. Per DS 2-02.2.1.19, per the Major Streets and Routes map, the maximum right of way for Valencia Road is 150 feet. Please provide a future site plan detail to show how the site will meet code should Valencia widen. Please identify where the centerline, travel lane, and curb are - with the distance between the curb and the property line clarified. 14. Per DS 2-02.2.1.20, please show any easements with related recordation information. 15. Per DS 2-02.2.1.25, please show any free-standing lighting with measurements and elevation details. 16. Per DS 2-02.2.1.28, please show the zoning of adjacent parcels. 17. Per DS 2-02.2.1.31, please identify the site as currently vacant. 18. Per DS 2-02.2.2.A.2. please provide Floor Area Ratio calculations, not to exceed .35, and include lot size information. 19. Please provide a note "this project is subject to requirements of LUC 2.5.3.6.B, all uses must be contained entirely within an enclosed building." 20. Depending upon the responses provided, further review comments may be forthcoming. Should you have any questions on this review, please contact me via email at Heather.Thrall@tucsonaz.gov or at 791-4541x1156. If you have any questions about this transmittal, please call (520) 791-5608. HCT C:\planning\site\DSD\T06CM02271 155 w valencia.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan and additional requested documents |
| 06/20/2006 | HEATHER THRALL | ZONING HC SITE | REVIEW | Denied | Please see zoning review comments |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 06/23/2006 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
| 06/23/2006 | SUE REEVES | REJECT SHELF | Completed |