Address Search: 155 W VALENCIA RD
Search
Parcel Attributes
| Parcel | 13819029B |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | C-1 |
| Tucson Ward | Ward 1 |
| Tucson Registered Neighborhood | Barrio Nopal |
| Major Street & Route | Gateway Route |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Historic Records Requests
Address: 155 W VALENCIA RD
Date - 11/09/2026 9:49 a.m.
Total Number Of Historic Records Requests - (1)
| Name | Action |
|---|---|
| Address: 155 W VALENCIA RD - Doc Type: CERT OF OCC |
Annexations & Original City Zoning (OCZ)
Address: 155 W VALENCIA RD
Date - 11/09/2026 9:49 a.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 155 W VALENCIA RD
Date - 11/09/2026 9:49 a.m.
Total Number Of Permits - (25)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-UTL-0723-02093 | Complete | 07/20/2023 | 10/09/2023 | Right-of-Way (ROW) - Utility | COX-PRJ254293-1-Cox to bore total 341' & trench 13', place 2" conduit, place vault, for system tie in. | |
| TR-UTL-0723-01990 | Complete | 07/10/2023 | 09/29/2023 | Right-of-Way (ROW) - Utility | COX-PRJ254293-2-Cox to overlash total 668ft of 288ct fiber optic cable. | |
| TR-ROW-0123-00203 | Complete | 01/03/2023 | 03/02/2023 | Right-of-Way (ROW) | Abandonment of groundwater monitoring well by grouting and removing the well vault, removing the concrete apron around the well vault, and patching the surface. Only excavation is of the existing traffic vault, concrete around it, and up to approximately 1-foot of soil to achieve surface restoration. | |
| T06AN00448 | ISSUED | 04/20/2006 | N/A | ADDRNEW | ||
| T06CM02271 | C OF O | 04/20/2006 | 07/14/2008 | COMBO | NEW: RETAIL BLDG | |
| T07BU01029 | FINAL | 05/08/2007 | 10/13/2008 | GRADING | GRADING: DOLLAR GENERAL STORE | |
| T07EX00713 | CLOSED | 07/11/2007 | 09/09/2007 | EXCAV | EXCA:1-24' DRIVEWAY W/2-25'CURB RETURNS & 2-ACCESS RAMPS | |
| T07OT02300 | FINAL | 10/09/2007 | 07/13/2008 | SIGN | 13842 | |
| T15EX03143 | FINAL | 10/28/2015 | 01/02/2016 | EXCAV | We will be hole clearing, drilling, and installing one groundwater monitoring well to approximately 130 feet below ground surface. We will be returning to the well quarterly for groundwater monitoring which will last less than 30 minutes each quarter. | |
| T15TC02465 | FINAL | 10/28/2015 | N/A | BARRICAD | We will be hole clearing, drilling, and installing one groundwater monitoring well to approximately 130 feet below ground surface. We will be returning to the well quarterly for groundwater monitoring which will last less than 30 minutes each quarter. | |
| T17RW02139 | EXPIRED | 05/19/2017 | 06/22/2017 | ROW | We will be surveying an offsite groundwater monitoring well.The two eastbound inside lanes on Valencia will be blocked temporary for approximately 30 minutes. | |
| T17RW02307 | EXPIRED | 05/30/2017 | 07/05/2017 | ROW | We will be taking an offsite groundwater well sample once a quarter for 30 minutes each. The eastbound inside turn lane on Valencia Rd will be blocked temporarily. This permit reflects the second quarter 2017 monitoring event. | |
| T17RW04362 | FINAL | 10/04/2017 | 10/29/2017 | ROW | EMERGENCY 25 LF INTERSECTION S MISSIONDALE RD AND W VALENCIA RD 350 LF SOUTH OF VALENCIA RD ON S MISSIONDALE IN ASPHALT REPAIR LEAKING MAIN | |
| T17RW05051 | FINAL | 11/14/2017 | 12/15/2017 | ROW | ON MISSIONDALE, APPROX. 400' SOUTH OF VALENCIA RD IN ASPHALT FOR PERM PATCH | |
| T17RW05147 | FINAL | 11/20/2017 | 01/05/2018 | ROW | WE WILL BE TAKING AN OFFSITE GROUNDWATER MONITORING WELL SAMPLE ONCE A QUARTER FOR 30 MINUTES EACH EVENT FOR A TOTAL OF 2 HRS OF BARRICADING A YEAR; THE EASTBOUND INSIDE TURN LANE ON VALENCIA WILL BE BLOCKED TEMPORARY. THIS PERMIT REFLECTS THE FOURTH QUARTER 2017 MONITORING EVENT. | |
| T18RW01054 | FINAL | 03/05/2018 | 04/11/2018 | ROW | WE WILL BE TAKING AN OFFSITE GROUNDWATER MONITORING WELL SAMPLE ONCE A QUARTER FOR 30 MINUTES EACH EVENT FOR A TOTAL OF 2 HRS OF BARRICADING A YEAR; THE EASTBOUND INSIDE TURN LANE ON VALENCIA WILL BE BLOCKED TEMPORARY. THIS PERMIT REFLECTS THE FIRST QUARTER 2018 MONITORING EVENT. | |
| T18RW02226 | FINAL | 05/14/2018 | 05/24/2018 | ROW | WE WILL BE TAKING AN OFFSITE GROUNDWATER MONITORING WELL SAMPLE ONCE A QUARTER FOR 30 MINUTES EACH EVENT FOR A TOTAL OF 2 HRS OF BARRICADING A YEAR; THE EASTBOUND INSIDE TURN LANE ON VALENCIA WILL BE BLOCKED TEMPORARY. THIS PERMIT REFLECTS THE SECOND QUARTER 2018 MONITORING EVENT. | |
| T19RW02644 | FINAL | 05/10/2019 | 06/20/2019 | ROW | WE WILL BE TAKING AN OFFSITE GROUNDWATER MONITORING WELL SAMPLE ONCE A QUARTER FOR 30 MINUTES EACH EVENT FOR A TOTAL OF 2 HRS OF BARRICADING A YEAR; THE EASTBOUND INSIDE TURN LANE ON VALENCIA WILL BE BLOCKED TEMPORARY. THIS PERMIT REFLECTS THE SECOND QUARTER 2017 MONITORING EVENT. ADDRESS ON APPLICATION-115 W VALENCIA RD | |
| T19RW05063 | VOID | 09/10/2019 | N/A | ROW | THE EASTBOUND INSIDE TURN LANE ON VALENCIA RD WILL BE BLOCKED TEMPORARY FOR OFFSITE GROUNDWATER MONITORING WELL SAMPLE FOR APPROXIMATELY 2 HRS. PERMIT VALID FOR DATES OF SEPTEMBER 17 - 18, 2019. BARRICADE SET-UP SHALL NOT START PRIOR TO 9:00 A.M. AND SHALL BE REMOVED PRIOR TO 3:30 P.M. | |
| T19RW06922 | FINAL | 11/12/2019 | 11/19/2019 | ROW | THE EASTBOUND INSIDE TURN LANE ON VALENCIA RD WILL BE BLOCKED TEMPORARY FOR OFFSITE GROUNDWATER MONITORING WELL SAMPLE FOR APPROXIMATELY 2 HRS. PERMIT VALID FOR DATE OF NOVEMBER 19, 2019 ONLY. BARRICADE SET-UP SHALL NOT START PRIOR TO 9:00 A.M. AND SHALL BE REMOVED PRIOR TO 3:30 P.M. | |
| T20RW00957 | FINAL | 02/14/2020 | 04/24/2020 | ROW | Starting in front of residence at TEP pole, riser down pole and trench/bore North 50' then West 15' to out of row WORK LOCATION IS ON MISSIONDALE RD | |
| T20RW01821 | FINAL | 03/23/2020 | 04/24/2020 | ROW | WE WILL BE TAKING AN OFFSITE GROUNDWATER MONITORYING WELL SAMPLE ONCE A QUARTER FOR 30 MINUTES EACH EVENT FOR A TOTAL OF 2HRS OF BARRICADING A YEAR. THE EASTBOUND INSIDE TURN LANE ON VALENCIA WILL BE BLOCKED TEMPORARY. THIS PERMIT REFLECTS THE FIRST QUARTER 2020 MONITORING EVENT. | |
| T20RW04627 | FINAL | 08/13/2020 | 10/14/2020 | ROW | Groundwater monitoring well sampling on the north side of eastbound Valencia Road, west of Missiondale Road. The lane closure and well sampling activities will take approximately 2 hours. | |
| T21RW01038 | FINAL | 03/05/2021 | 04/15/2021 | ROW | GROUNDWATER MONITORING WELL SAMPLING ON THE NORTH SIDE OF EASTBOUND VALENCIA ROAD, WEST OF MISSIONDALE ROAD. THE LANE CLOSURE AND WELL SAMPLING ACTIVITIES WILL TAKE APPROX. 2 HOURS. NOTE: Valencia Road is under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50’ in each direction from the outside of the cut for all effected travel lanes. | |
| T21RW02689 | FINAL | 06/03/2021 | 07/15/2021 | ROW | LANE CLOSURE DUE TO AN OFFSITE GROUNDWATER MONITORING WELL SAMPLE ON THE NORTH SIDE OF EASTBOUND VALENCIA RD, WEST OF MISSIONDALE ROAD. LANE CLOSURE AND WELL SAMPLING ACTIVITIES WILL TAKE APPROXIMATELY 2HRS. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Plans
Address: 155 W VALENCIA RD
Date - 11/09/2026 9:49 a.m.
Total Number Of Plans - (2)
| Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T08BA00045 | Approved | 05/28/2008 | N/A | -- Stormwater Basin | ||
| T08BA00046 | Approved | 05/28/2008 | N/A | -- Stormwater Basin |