Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Address NEW:
6671 E LITTLETOWN RD
Apply Date:
02/14/2006
Applicant:
N/A
Description:
NEW BUILDING
Contractors:
  • AGATE INC

Permit Reviews

Permit Number - T06CM00914
Permit Status: C of o
Permit Description: NEW BUILDING
Start Date Submittal Complete Date Status  
02/14/2006 PLANS OK TO SUBMIT - 3RD PARTY 02/15/2006 COMPLETED Review Details
02/15/2006 PLANS OK TO SUBMIT - SITE 02/15/2006 COMPLETED Review Details
02/15/2006 3RD PARTY REVIEW-COMMERCIAL 03/29/2006 COMPLETED Review Details
02/15/2006 POST 3RD PARTY REVIEW 03/30/2006 COMPLETED Review Details
03/31/2006 POST 3RD PARTY REVIEW 03/31/2006 COMPLETED Review Details
06/29/2006 3RD PARTY REVIEW-REVISION/OTHER 06/30/2006 COMPLETED Review Details
07/13/2006 3RD PARTY REVIEW-REVISION/OTHER 07/24/2006 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T06CM00914
Permit Status: C of o
Permit Description: NEW BUILDING
Total Outstanding Activity Conditions - 1
Date Name
02/14/2006 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T06CM00914
Permit Description: NEW BUILDING
Total Completed Inspections - 36
Date Description Inspector Results Comments
05/24/2006 ELECTRIC - UFER RSUBA Approved IVRS - Inspection :*
PLANS CALL FOR 3/0 CU
NEED LETTER FROM ENGINEER ON THIS REVISION.
THIS IS ALLOWED PER N.E.C
05/24/2006 SITE - SEWER RRICH Approved IVRS - Inspection :*
CONNECTION TO EXISTING CLAY FROM EXISTING PIMA COUNTY MANHOLE OK
SEE NOTE #2 FROM 5/22/06 INSPECTION.
05/24/2006 BUILDING PRE-SLAB LHANLY Approved IVRS - Inspection :*
07/19/2006 FRAMING GDABBS Approved IVRS - Inspection :*
INTERIOR FRAMING
07/26/2006 PLUMBING - INTERMEDIATE RRICH Approved IVRS - Inspection :*
07/28/2006 ELECTRIC - INTERMEDIATE RSUBA Approved IVRS - Inspection :*
08/10/2006 SHEET ROCK NAILING GDABBS Approved IVRS - Inspection :*
DOWNSTAIRS SHEETROCK OK
09/08/2006 PLUMBING - ABOVE CEILING RRICH Approved IVRS - Inspection :*
THIS INSPECTION ALSO FOR CLOSET FLANGES OK
09/14/2006 EXCAVATION/LAYOUT REBAR & ZON GDABBS Approved IVRS - Inspection :*
THE F-1A-1 FOOTING @ SOUTH INTERIOR BLDG. WALL
09/19/2006 PLUMBING - YARD WTR LINE/TEST RRICH Approved IVRS - Inspection :*
09/21/2006 MECHANICAL - INTERMEDIATE JMILITEL Approved IVRS - Inspection :*
09/26/2006 ELECTRIC - UNDERGROUND RSUBA Approved IVRS - Inspection :*
OK SWITCH GEAR & TRAILER
U.G
1 1/2"
4 2 1/2"
1 2"
09/26/2006 PLUMBING - SEWER HCS CONNECT RRICH Approved IVRS - Inspection :*
09/26/2006 PLUMBING - ROUGH, SOIL RRICH Approved IVRS - Inspection :*
10/09/2006 MECHANICAL - FINAL CWILLIAM Approved IVRS - Inspection :*
10/10/2006 PLUMBING - FINAL RRICH Approved IVRS - Inspection :*
1. SEE NOTE #2 & #3 AND COMPLY
PLUMBER TAPE IS NOT APPROVED FOR SECURING ANY MATERIALS.
2. ALL EXTERIOR CLEANOUTS TO BE TO GRADE AND HAVE TRAFFIC RATED COVERS IF REQUIRED.
3. MAKE WATER TIGHT JANITOR SINK. T&P TO TERMINATE OVER JANITOR SINK AND BE SECURED.
4. PROVIDE INFORMATION ON POSSIBLE NEED FOR BACKFLOW PROTECTION FOR 1 1/2 TO FEED EQUIPMENT (H20 SUPPLY)
12/19/2006 ELECTRIC - FINAL RMAJUTA Approved IVRS - Inspection :*
1. TRAILER PNL OK, PNL LE-OK
2. TRAILER TRANSFORMER REQUIRES A WP COVER BEFORE RELEASE.
3. HIGH BAY LIGHT FIXTURES VERIFIED OR WEIGHING 21 POUNDS EACH OK ON BOX.
4. ALL OUTSIDE POLE BASES OK
5. ALL INSIDE LIGHTING OK
6. PNL HA CIRCUITRY OK
7. JUST NEED COMPRESSOR HOOKED UP
01/11/2007 OUTDOOR LIGHTING FINAL RMAJUTA Approved IVRS - Inspection :*
01/11/2007 ELECTRIC - OUTDOOR LIGHTING RMAJUTA Approved IVRS - Inspection :*
01/11/2007 ELECTRIC - CABLE DROP RMAJUTA Approved IVRS - Inspection :*
01/11/2007 ELECTRIC - ABOVE CEILING RMAJUTA Approved IVRS - Inspection :*
01/12/2007 ELECTRIC - TEMP POWER FOR TEST RMAJUTA Approved
01/16/2007 MECHANICAL - ABOVE CEILING CWILLIAM Approved
01/17/2007 BUILDING - FINAL GDABBS Approved IVRS - Inspection :*
01/23/2007 NPPO - FINAL ACONNOR Approved
01/23/2007 LANDSCAPE - FINAL ACONNOR Approved
02/15/2007 RIGHT OF WAY - FINAL SDAMRON Approved PER EMAIL
02/15/2007 SIGN - FINAL JYBARRA Approved IVRS - Inspection :*
02/15/2007 U VALUE FOR WINDOW GDABBS Approved IVRS - Inspection :*
02/15/2007 BUILDING ABOVE CEILING GDABBS Approved IVRS - Inspection :*
02/15/2007 ROOF NAILING GDABBS Approved IVRS - Inspection :*
02/15/2007 EXT METAL CLIPS/EXT SHEATHING GDABBS Approved IVRS - Inspection :*
02/15/2007 STEM WALL/RETAINING WALL GDABBS Approved IVRS - Inspection :*
02/15/2007 FIRE - FINAL LTHOMAS Approved
02/15/2007 ENGINEERING - FINAL NKALAHAR Approved HOLD OUTSTANDING ISSUES TO GRADING PERMIT T04BU02306
02/22/2007 PERMIT FINALED LJACKSON Approved

Documents

File Name Document Type  
None CERT OF OCC VIEW
FOUNDATIONCALCS_01.TIF DOCUMENTS VIEW
FOUNDATIONCALCS_02.TIF DOCUMENTS VIEW
FOUNDATIONCALCS_03.TIF DOCUMENTS VIEW
FOUNDATIONCALCS_04.TIF DOCUMENTS VIEW
FOUNDATIONCALCS_05.TIF DOCUMENTS VIEW
FOUNDATIONCALCS_06.TIF DOCUMENTS VIEW
FOUNDATIONCALCS_07.TIF DOCUMENTS VIEW
STORMWATERPPP_01.TIF DOCUMENTS VIEW
STORMWATERPPP_02.TIF DOCUMENTS VIEW
STORMWATERPPP_03.TIF DOCUMENTS VIEW
STORMWATERPPP_04.TIF DOCUMENTS VIEW
STRUCCALCLOADINGDOCK.TIF DOCUMENTS VIEW
None DOCUMENTS VIEW