Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/12/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* RECEIVED (2) IN HOUSE BACKFLOW CERTIFICATIONS |
|
| 01/10/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SHALL PROVIDE TRAFFIC RATED CLEANOUT COVERS IN CONVEYOR AREA & HAVE TRACER WIRE TO GRADE SOUTHSIDE 2. SHALL PROVIDE CORRECT BACKFLOW PROTECTION FOR 1 1/2 FEED TO CONVEYOR SYSTEM POTABLE COLD WATER WITH CERTIFICATION AND CERTIFICATION OF LANDSCAPING BACKFLOW DEVICE. 3. PUBLIC USE LAVS REQUIRE ADDITIONAL MEANS FOR HOT WATER SUPPLY NOT TO EXCEED 120 DEG. BESIDES THE WATER HEATER (TEMPERING VALVES) |
|
| 10/10/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SEE NOTE #2 & #3 AND COMPLY PLUMBER TAPE IS NOT APPROVED FOR SECURING ANY MATERIALS. 2. ALL EXTERIOR CLEANOUTS TO BE TO GRADE AND HAVE TRAFFIC RATED COVERS IF REQUIRED. 3. MAKE WATER TIGHT JANITOR SINK. T&P TO TERMINATE OVER JANITOR SINK AND BE SECURED. 4. PROVIDE INFORMATION ON POSSIBLE NEED FOR BACKFLOW PROTECTION FOR 1 1/2 TO FEED EQUIPMENT (H20 SUPPLY) |
|
| 09/21/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. EXPOSE & PROVIDE ALL CLEANOUTS, PROVIDE TAPED PLUGS AND MACHINE SCREW WITH COVERS. 2. EXPOSE TRAP PRIMERS. 3. SECURE EXPANSION TANK. HAVE ALL OTHER PLUMBING INSPECTIONS APPROVED FOR FINAL. |