Permit: T02CM04244
Permit Details
Apply Date:
09/10/2002
Applicant:
LARRY WILSON
Description:
NEW:RESTAURANT
Contractors:
- WILSON AND ASSOCIATES DESIGN GRO
Permit Reviews
Permit Number - T02CM04244
Permit Status: C of o
Permit Description: NEW:RESTAURANT
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/19/2003 | REVISION | 03/19/2003 | COMPLETED |
09/10/2002 | COMMERCIAL NEW | 10/14/2002 | COMPLETED |
11/01/2002 | RESUBMITTAL | 11/18/2002 | COMPLETED |
11/19/2002 | RESUBMITTAL | 11/19/2002 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T02CM04244
Permit Status: C of o
Permit Description: NEW:RESTAURANT
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
09/10/2002 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T02CM04244
Permit Description: NEW:RESTAURANT
Total Completed Inspections - 42
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/20/2002 | ELECTRIC - UFER | MCAPISTR | Approved | IVRS - Inspection 0000*3/0 TO REBAR OK. |
11/20/2002 | EXCAVATION/LAYOUT REBAR & ZON | HLEYVA | Approved | OK EXT FTGS @ MAIN BLDG. |
11/22/2002 | STEM WALL/RETAINING WALL | HLEYVA | Approved | IVRS - Inspection 0000* |
11/27/2002 | PLUMBING - YARD WTR LINE/TEST | RMYERS | Approved | 1.) ABS DWV UNDERGROUND INSTALLED PER PLAN WATER TEST ON TEN FOOT HEAD OK 2.) GREASE WASTE PIPING INSTALLED PER PLAN WATER TEST ONE RISER TO TEN FEET OK 3.) 1 1/2" PVC YARD WATER OK NEED TO SEE FINAL CONNECTION AT RPPBP AND BLDG. 4.) OK TO COVER ALL AREAS. |
11/27/2002 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | |
12/19/2002 | ELECTRIC - CABLE DROP | MCAPISTR | Approved | IVRS - Inspection 0000*TEP PRIMARY ONLY. |
12/19/2002 | ELECTRIC - UNDERGROUND | MCAPISTR | Approved | IVRS - Inspection 0000* 1.) SECONDARY FEED PVC 2.) UNDERSLAB FEED PVC FOR PANELS & VARIOUS LOCATIONS. |
12/20/2002 | PLUMBING - PROGRESS | RMYERS | Approved | IVRS - Inspection 0000*1.) PRE POUR INSPECTION OK TRENCH DRAINS. FLOOR DRAINS W/TRAP PRIMERS FLOOR SINKS 2.) OK FOR CONCRETE. 2.) OK TO CONCRETE. |
12/20/2002 | BUILDING PRE-SLAB | RSUBA | Approved | IVRS - Inspection 0000* |
01/09/2003 | ELECTRIC - TEMPORARY SERVICE | JORTA | Approved | IVRS - Inspection 0000*SENT TO TEP ON 1/9/03 AT 9:15AM |
01/09/2003 | ELECTRIC - TEMPORARY POLE | JORTA | Approved | IVRS - Inspection 0000* |
01/23/2003 | REINFORCED MASONRY PRE-GROUT | LHANLY | Approved | IVRS - Inspection 0000* |
02/10/2003 | FRAMING | LHANLY | Approved | IVRS - Inspection 0000*DELTA 1 NOTE PP A3 CALLS FOR 5/8" PLYWOOD FOR EXTERIOR SHEATHING REVISE FOR 1/2" O.S.B. AS BUILT |
03/06/2003 | PLUMBING - SEWER HCS CONNECT | TRINIVJR | Approved | IVRS - Inspection 0000* 1.) SOIL WATER TEST IS OK. 2.) HCS CONNECTION IS OK 3.) CONNECTION TO GREASE TRAP IS OK 4.) OK TO BACKFILL TRENCH. |
03/17/2003 | STUCCO MESH | LHANLY | Approved | IVRS - Inspection 0000* |
03/26/2003 | MECHANICAL - HOODS | JMILITEL | Approved | IVRS - Inspection 0000*CHECKED FIRE WRAP & HOOD INSTALLATION. |
04/17/2003 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection 0000*/ 1) FINISH INSTALLING AIR. WILL CHECK ON FINAL 2) OK FOR CEILING TILES |
04/17/2003 | PLUMBING - ABOVE CEILING | TRINIVJR | Approved | IVRS - Inspection 0000*OK FOR GRID & TILE. |
04/17/2003 | BUILDING ABOVE CEILING | LHANLY | Approved | IVRS - Inspection 0000* |
04/18/2003 | ELECTRIC - ABOVE CEILING | JORTA | Approved | IVRS - Inspection 0000* |
05/09/2003 | MECHANICAL - TEMP PWR FOR TEST | JMILITEL | Approved | IVRS - Inspection 0000* |
05/09/2003 | ELECTRIC - TEMP POWER FOR TEST | JORTA | Approved | IVRS - Inspection 0000*GAS SYSTEM HAS BEEN BONDED. |
05/09/2003 | BUILDING - TEMP POWER FOR TEST | LHANLY | Approved | IVRS - Inspection 0000* |
05/09/2003 | ROOF NAILING | LHANLY | Approved | IVRS - Inspection 0000*PLEASE TURN IN COMPLIANCE CERTIFICATE FOR H.S. BOLTING WHEN YOU GO IN FOR C OF O. |
05/12/2003 | PLUMBING - TEMP POWER FOR TEST | TRINIVJR | Approved | IVRS - Inspection 0000* |
05/19/2003 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection 0000* |
05/19/2003 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection 0000* |
05/19/2003 | OUTDOOR LIGHTING FINAL | JORTA | Approved | IVRS - Inspection 0000* |
05/19/2003 | ELECTRIC - FINAL | JORTA | Approved | IVRS - Inspection 0000* |
05/20/2003 | PLUMBING - FINAL | TRINIVJR | Approved | IVRS - Inspection 0000*PLBG. FINAL OK OK FOR C OF O. |
05/21/2003 | BUILDING - FINAL | LHANLY | Approved | IVRS - Inspection 0000*EVERYTHING DONE, WAITING FOR FIRE APPROVAL ONLY. |
05/27/2003 | FIRE - FINAL | JEGAN | Approved | IVRS - Inspection 0000* |
05/28/2003 | NPPO - FINAL | JLINVILL | Approved | |
05/28/2003 | LANDSCAPE - FINAL | JLINVILL | Approved | |
05/29/2003 | RIGHT OF WAY - FINAL | PWHIDDON | Approved | |
08/26/2003 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | |
08/26/2003 | PERMIT FINALED | DROBERTS | Approved | |
08/26/2003 | ENGINEERING - FINAL | DROBERTS | Approved | |
08/26/2003 | PLUMBING - GAS PRESSURE TEST | TRINIVJR | Approved | |
08/26/2003 | PLUMBING - INTERMEDIATE | TRINIVJR | Approved | |
08/26/2003 | ELECTRIC - CONSTRUCTION POWER | JORTA | Approved | |
08/26/2003 | ELECTRIC - INTERMEDIATE | JORTA | Approved |