Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - TEMP POWER FOR TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2003 | ELECTRIC - TEMP POWER FOR TEST | Approved | IVRS - Inspection 0000*GAS SYSTEM HAS BEEN BONDED. | |
| 04/23/2003 | ELECTRIC - TEMP POWER FOR TEST | Denied | IVRS - Inspection 0999*PLEASE FOLLOW PLAN. 1.) TERMINAL BLOCKS REQUIRED IN GUTTER. 2.) A FULL SIZE NEUTRAL REQUIRED INTO DISCONNECT 1,2 AND 3. 3.) NEED FURTHER COMPLETION FOR TEST POWER AND MUST HAVE TEMP POWER SIGN OFF SHEET AVAILABLE FOR ALL INSPECTION PLEASE READ SHEET. |
|
| 01/09/2003 | ELECTRIC - TEMP POWER FOR TEST | Not ready for Inspection | IVRS - Inspection 0000* |