Permit: DP22-0241
Permit Details
Apply Date:
08/17/2022
Applicant:
Atwell Submittals
Description:
*Revision #2 (revised grades) started 8/1/24* *Revision #1 started 4/4/24 (Wall details)* Site/Grading/Swppp - 6601 E. Grant Road. Demo. New commercial project, retail and restaurants.
Permit Reviews
Permit Number - DP22-0241
Permit Status: Complete
Permit Description: *Revision #2 (revised grades) started 8/1/24* *Revision #1 started 4/4/24 (Wall details)* Site/Grading/Swppp - 6601 E. Grant Road. Demo. New commercial project, retail and restaurants.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/17/2022 | DEV PKG - OK TO SUBMIT | 09/05/2022 | COMPLETED |
| 09/05/2022 | DEV PKG | 10/07/2022 | COMPLETED |
| 08/01/2024 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 08/30/2024 | APPROVED |
| 04/04/2024 | DEVELOPMENT PACKAGE REVIEW v.1 | 04/18/2024 | REQUIRES RESUBMIT |
| 04/10/2023 | DEVELOPMENT PACKAGE REVIEW v.3 | 04/14/2023 | APPROVED |
| 01/23/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 03/02/2023 | REQUIRES RESUBMIT |
| 03/17/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 03/30/2023 | REQUIRES RESUBMIT |
| 04/19/2024 | DEVELOPMENT PACKAGE REVIEW v.2 | 04/29/2024 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP22-0241
Permite Description: *Revision #2 (revised grades) started 8/1/24* *Revision #1 started 4/4/24 (Wall details)* Site/Grading/Swppp - 6601 E. Grant Road. Demo. New commercial project, retail and restaurants.
Total Outstanding Inspections - 18
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/28/2023 | COT - SITE - Zoning Intermediate | N/A | Not Ready | |
| 09/28/2023 | SITE - SWPPP Correction Notice | N/A | Not Ready | no wattles around soil stockpiles |
| 09/28/2023 | SITE - Zoning Violation | N/A | Not Ready | |
| 09/28/2023 | SITE | N/A | Not Ready | |
| 09/28/2023 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
| 09/28/2023 | SITE - Stormwater Follow-up | N/A | Not Ready | no wattles around soil stockpiles |
| 09/28/2023 | SITE - SWPPP Violation Notice | N/A | Not Ready | no wattles around soil stockpiles |
| 09/28/2023 | SITE - Zoning Compliance | N/A | Not Ready | |
| 09/28/2023 | SITE - Stormwater Setup and Controls | N/A | Not Ready | no wattles around soil stockpiles |
| 09/28/2023 | City of Tucson (COT) Planning and Development Services Engineering (ENGR) Zoning Compliance Inspection | N/A | Not Ready | |
| 09/28/2023 | COT - ENGR - Stormwater | N/A | Not Ready | |
| 04/05/2024 | ENGR - Drainage Structures | N/A | Partial Pass | The trash and closure for this site is already been completed for the footer. The walls are in as well as the slab, the gates are the only thing that are missing at this time. This work is not per the Typical Design that is given in the handouts that we provide for this work. The Bollards have been placed at the wrong locations within the individual cells, this does not allow for the 10 foot open space between the Bollards and the Future Gate. Contact Andy Verra with Environmental Services at (520) 631-5160 and ask him to look at the Trash Enclosure and see if they will be able to Service this location as it has been Constructed.The Bollards should be removed and placed in their proper locations within the structure as shown on the Approved Standards The contractor had called this inspection in for a retaining wall inspection along the east side of the property, but cannot be done at this time. The retaining wall has not been permitted, and there are no drawings of what is to be done, but I have taken photographs of the footer and will wait for the Plan to be submitted and reviewed. This inspection should be done by the building department since this is a wall that requires additional permits for retention. |
| 06/26/2024 | LAND Landscape Appearance & Function Final | N/A | Not Ready | Contractor need to reschedule |
| 06/26/2024 | Final inspection to ensure all landscape and water harvesting SITE | N/A | Not Ready | Contractor needs to reschedule |
| 07/23/2024 | N/A | Not Ready | During the Site Inspection it has been noted that there have been changes in the plans that are not per the Approved plans. The Engineer of Record will need to ensure that all Modifications have been approved by the Engineering Section and meet all Codes and Standards. | |
| 07/23/2024 | N/A | Not Ready | The plans have been changed for the pedestrian area that leads to the trash enclosure on the northwest corner of the site. The running area exceeds more than 5% and is now required to have handrail added on both sides if it remains as it has been constructed. The Roadway grades have been also changed in this area which creates over 5% running slope in a pedestrian pathway. I have requested the Engineer of Record to come up with a compliant solution for this site. | |
| 07/03/2024 | N/A | Partial Pass | contractor needs to check the slope from the building to the trash enclosure. I checked with my level and it read 8.2% contractor also got put in some gutter off the patio area for the water doesn’t drain onto the sidewalk and the gates on the trash enclosure needs to be hung | |
| 06/25/2024 | For trash and recycling enclosures | N/A | Not Ready | Contractors going to reschedule not ready |
Completed Inspections
Permit Status: Complete
Permit Number: DP22-0241
Permit Description: *Revision #2 (revised grades) started 8/1/24* *Revision #1 started 4/4/24 (Wall details)* Site/Grading/Swppp - 6601 E. Grant Road. Demo. New commercial project, retail and restaurants.
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/21/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 07/03/2024 | Consultation SITE | Passed | contractor needs to check the slope from the building to the trash enclosure. I checked with my level and it read 8.2% contractor also got put in some gutter off the patio area for the water doesn’t drain onto the sidewalk and the gates on the trash enclosure needs to be hung | |
| 07/03/2024 | LAND Landscape Appearance & Function Final | Passed | ||
| 09/06/2024 | ENGR Paving | Passed | Constructed per approved revised plans and elevations | |
| 09/06/2024 | ENGR Engineering Final | Passed | Constructed per approved revised plans. | |
| 09/06/2024 | Final inspection to ensure all landscape and water harvesting SITE | Passed | ||
| 09/06/2024 | Passed | |||
| 09/06/2024 | Passed | |||
| 09/06/2024 | Passed | |||
| 09/06/2024 | For trash and recycling enclosures | Passed |