Permit Details

Status:
Complete
Type:
Development Package
Address:
6601 E GRANT RD
Address NEW:
6601 E GRANT RD
Apply Date:
08/17/2022
Applicant:
Atwell Submittals
Description:
*Revision #2 (revised grades) started 8/1/24* *Revision #1 started 4/4/24 (Wall details)* Site/Grading/Swppp - 6601 E. Grant Road. Demo. New commercial project, retail and restaurants.

Permit Reviews

Permit Number - DP22-0241
Permit Status: Complete
Permit Description: *Revision #2 (revised grades) started 8/1/24* *Revision #1 started 4/4/24 (Wall details)* Site/Grading/Swppp - 6601 E. Grant Road. Demo. New commercial project, retail and restaurants.
Start Date Submittal Complete Date Status  
08/17/2022 DEV PKG - OK TO SUBMIT 09/05/2022 COMPLETED Review Details
09/05/2022 DEV PKG 10/07/2022 COMPLETED Review Details
08/01/2024 DEVELOPMENT PACKAGE NEW REVISION v.1 08/30/2024 APPROVED Review Details
04/04/2024 DEVELOPMENT PACKAGE REVIEW v.1 04/18/2024 REQUIRES RESUBMIT Review Details
04/10/2023 DEVELOPMENT PACKAGE REVIEW v.3 04/14/2023 APPROVED Review Details
01/23/2023 DEVELOPMENT PACKAGE REVIEW v.1 03/02/2023 REQUIRES RESUBMIT Review Details
03/17/2023 DEVELOPMENT PACKAGE REVIEW v.2 03/30/2023 REQUIRES RESUBMIT Review Details
04/19/2024 DEVELOPMENT PACKAGE REVIEW v.2 04/29/2024 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP22-0241
Permite Description: *Revision #2 (revised grades) started 8/1/24* *Revision #1 started 4/4/24 (Wall details)* Site/Grading/Swppp - 6601 E. Grant Road. Demo. New commercial project, retail and restaurants.
Total Outstanding Inspections - 18
Last Inspection Date Description Inspector Results Comments
09/28/2023 COT - SITE - Zoning Intermediate N/A Not Ready
09/28/2023 SITE - SWPPP Correction Notice N/A Not Ready no wattles around soil stockpiles
09/28/2023 SITE - Zoning Violation N/A Not Ready
09/28/2023 SITE N/A Not Ready
09/28/2023 PDSD Site/Engineering Division - NPPO N/A Not Ready
09/28/2023 SITE - Stormwater Follow-up N/A Not Ready no wattles around soil stockpiles
09/28/2023 SITE - SWPPP Violation Notice N/A Not Ready no wattles around soil stockpiles
09/28/2023 SITE - Zoning Compliance N/A Not Ready
09/28/2023 SITE - Stormwater Setup and Controls N/A Not Ready no wattles around soil stockpiles
09/28/2023 City of Tucson (COT) Planning and Development Services Engineering (ENGR) Zoning Compliance Inspection N/A Not Ready
09/28/2023 COT - ENGR - Stormwater N/A Not Ready
04/05/2024 ENGR - Drainage Structures N/A Partial Pass The trash and closure for this site is already been completed for the footer. The walls are in as well as the slab, the gates are the only thing that are missing at this time. This work is not per the Typical Design that is given in the handouts that we provide for this work. The Bollards have been placed at the wrong locations within the individual cells, this does not allow for the 10 foot open space between the Bollards and the Future Gate. Contact Andy Verra with Environmental Services at (520) 631-5160 and ask him to look at the Trash Enclosure and see if they will be able to Service this location as it has been Constructed.The Bollards should be removed and placed in their proper locations within the structure as shown on the Approved Standards
The contractor had called this inspection in for a retaining wall inspection along the east side of the property, but cannot be done at this time. The retaining wall has not been permitted, and there are no drawings of what is to be done, but I have taken photographs of the footer and will wait for the Plan to be submitted and reviewed. This inspection should be done by the building department since this is a wall that requires additional permits for retention.
06/26/2024 LAND Landscape Appearance & Function Final N/A Not Ready Contractor need to reschedule
06/26/2024 Final inspection to ensure all landscape and water harvesting SITE N/A Not Ready Contractor needs to reschedule
07/23/2024 N/A Not Ready During the Site Inspection it has been noted that there have been changes in the plans that are not per the Approved plans. The Engineer of Record will need to ensure that all Modifications have been approved by the Engineering Section and meet all Codes and Standards.
07/23/2024 N/A Not Ready The plans have been changed for the pedestrian area that leads to the trash enclosure on the northwest corner of the site. The running area exceeds more than 5% and is now required to have handrail added on both sides if it remains as it has been constructed. The Roadway grades have been also changed in this area which creates over 5% running slope in a pedestrian pathway. I have requested the Engineer of Record to come up with a compliant solution for this site.
07/03/2024 N/A Partial Pass contractor needs to check the slope from the building to the trash enclosure. I checked with my level and it read 8.2% contractor also got put in some gutter off the patio area for the water doesn’t drain onto the sidewalk and the gates on the trash enclosure needs to be hung
06/25/2024 For trash and recycling enclosures N/A Not Ready Contractors going to reschedule not ready

Completed Inspections

Permit Status: Complete
Permit Number: DP22-0241
Permit Description: *Revision #2 (revised grades) started 8/1/24* *Revision #1 started 4/4/24 (Wall details)* Site/Grading/Swppp - 6601 E. Grant Road. Demo. New commercial project, retail and restaurants.
Total Completed Inspections - 10
Date Description Inspector Results Comments
06/21/2024 PDSD Engineering Division Pre-Construction SITE Passed
07/03/2024 Consultation SITE Passed contractor needs to check the slope from the building to the trash enclosure. I checked with my level and it read 8.2% contractor also got put in some gutter off the patio area for the water doesn’t drain onto the sidewalk and the gates on the trash enclosure needs to be hung
07/03/2024 LAND Landscape Appearance & Function Final Passed
09/06/2024 ENGR Paving Passed Constructed per approved revised plans and elevations
09/06/2024 ENGR Engineering Final Passed Constructed per approved revised plans.
09/06/2024 Final inspection to ensure all landscape and water harvesting SITE Passed
09/06/2024 Passed
09/06/2024 Passed
09/06/2024 Passed
09/06/2024 For trash and recycling enclosures Passed

Documents

File Name Document Type  
APPROVED GD01 FROM DP22-0241_V1.PDF DOCUMENTS VIEW
APPROVED SUB 4 DP PER MEETING ON 4.4.2023 AND 3RD REVIEW COMMENTS_V1_V1_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
APPROVED COMBINED REVISION 1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW