Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Partial Pass
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 07/03/2024 |
|
|
Partial Pass |
contractor needs to check the slope from the building to the trash enclosure. I checked with my level and it read 8.2% contractor also got put in some gutter off the patio area for the water doesn’t drain onto the sidewalk and the gates on the trash enclosure needs to be hung |
| 09/06/2024 |
|
|
Passed |
|