Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP22-0241
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/21/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 05/03/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | Jake with Caldwell construction 633-3316. Temporary fencing installed, Stormwater controls in place. concrete containment on site. Over excavation in progress. |