Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
Permit Number - DP22-0241
Inspection Description - ENGR - Drainage Structures
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2024 | ENGR - Drainage Structures | Partial Pass | the two adjoining solid waste enclosures were fully constructed sans gates. interior dimensions, bollard to bollard was 8feet 8”, wall height 5’ 6”, 13’ 6”. constructed per approved plans but not to code. | |
| 04/05/2024 | ENGR - Drainage Structures | Partial Pass | The trash and closure for this site is already been completed for the footer. The walls are in as well as the slab, the gates are the only thing that are missing at this time. This work is not per the Typical Design that is given in the handouts that we provide for this work. The Bollards have been placed at the wrong locations within the individual cells, this does not allow for the 10 foot open space between the Bollards and the Future Gate. Contact Andy Verra with Environmental Services at (520) 631-5160 and ask him to look at the Trash Enclosure and see if they will be able to Service this location as it has been Constructed.The Bollards should be removed and placed in their proper locations within the structure as shown on the Approved Standards The contractor had called this inspection in for a retaining wall inspection along the east side of the property, but cannot be done at this time. The retaining wall has not been permitted, and there are no drawings of what is to be done, but I have taken photographs of the footer and will wait for the Plan to be submitted and reviewed. This inspection should be done by the building department since this is a wall that requires additional permits for retention. |
|
| 04/05/2024 | ENGR - Drainage Structures | Partial Pass | The trash enclosure has been accepted by Andy Vero and environmental services in the manner in which it has been constructed at this time. The Gates For the trash enclosure have not been installed at this time and will be inspected once they have been installed | |
| 09/28/2023 | ENGR - Drainage Structures | Not Ready |