Permit: DP21-0312
Permit Details
Status:
Complete
Type:
Development Package
Address:
5301 S NOGALES HY
Address NEW:
5301 S NOGALES HY
Apply Date:
11/18/2021
Applicant:
Description:
Site/Grading/Swppp - Newport at Rodeo. Multi-family.
Permit Reviews
Permit Number - DP21-0312
Permit Status: Complete
Permit Description: Site/Grading/Swppp - Newport at Rodeo. Multi-family.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/23/2022 | DEV PKG - RESUBMITTAL | 04/12/2022 | COMPLETED |
| 04/14/2022 | DEV PKG - RESUBMITTAL | 04/19/2022 | COMPLETED |
| 04/21/2022 | DEV PKG - RESUBMITTAL | 04/26/2022 | COMPLETED |
| 11/18/2021 | DEV PKG - OK TO SUBMIT | 12/06/2021 | COMPLETED |
| 12/06/2021 | DEV PKG | 01/14/2022 | COMPLETED |
| 04/25/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 05/22/2023 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP21-0312
Permite Description: Site/Grading/Swppp - Newport at Rodeo. Multi-family.
Total Outstanding Inspections - 10
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/24/2022 | PDSD Engineering Division Pre-Construction SITE | N/A | Complete (Recurring) | {Activity date: 08/24/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN /CONTRACTOR JUST STARTED CUTTING GRADE .INFORMED THE CONTRACTOR TO CALL IN INSPECTION EVERY TWO WEEKS . } ; {Activity date: 07/20/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN /INFORMED THE CONTRACTOR TO CALL IN INSPECTION BIWEEKLY} |
| 10/26/2022 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
| 10/26/2022 | SITE - SWPPP Correction Notice | N/A | Not Ready | |
| 10/26/2022 | SITE - SWPPP Violation Notice | N/A | Not Ready | |
| 07/19/2023 | PDSD Site/Engineering Division - Landscaping | N/A | Partial Pass | Call room for the HEADWALL and wing walls for the RCP on the north west side of the project |
| 04/20/2023 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | No concerns at this time |
| 11/02/2023 | ENGR Grading Final | N/A | Partial Pass | Sidewalk for East section of site is formed and grade compacted and is to pour concrete on Saturday 11/4 |
| 10/26/2022 | SITE - Stormwater Final Inspection | N/A | Not Ready | |
| 11/02/2023 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | 120’ of wattle was replaced along center section of East fence area, no other concerns at this time. |
| 12/15/2023 | ENGR Engineering Final | N/A | Partial Pass | TC of O Level (2) for Building #5,#6,#7 only. Total bike racks noted (19) Total Shrubs noted (323) Total Cacti noted (28) Total Trees noted (51) Temp fencing 12’ panels surrounding courtyard play area are noted and at this time are not adequate for a level 4 status. Recall of inspection for Buildings 5,6,7 will be called in the later part of next week. |
Completed Inspections
Permit Status: Complete
Permit Number: DP21-0312
Permit Description: Site/Grading/Swppp - Newport at Rodeo. Multi-family.
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/23/2024 | COT - ENGR - Signage Final | Passed | ||
| 01/26/2024 | PDSD Site/Engineering Division - Landscaping | Passed | ||
| 01/26/2024 | SITE - Stormwater Follow-up | Passed | ||
| 01/26/2024 | ENGR Grading Final | Passed | ||
| 01/26/2024 | SITE - Stormwater Final Inspection | Passed | ||
| 01/25/2024 | SITE - Stormwater Setup and Controls | Passed | ||
| 01/26/2024 | ENGR Engineering Final | Passed |